A platform for research: civil engineering, architecture and urbanism
METHOD FOR CONSTRUCTING VENTILATION BLOCKING STRUCTURE IN COLUMN ASSEMBLY PART AND VENTILATION BLOCKING STRUCTURE IN COLUMN ASSEMBLY PART
To provide a ventilation shut-off structure in a column assembly part capable of suitably arranging a ventilation shut-off member in a clearance between adjacent columns in the column assembly part where the columns of a building unit are assembled, and a construction method of the ventilation shut-off structure.SOLUTION: A column assembly part 16 where a plurality of columns 21 are assembled is provided with a pair of airflow stop 42A, 42B, and each of the airflow stop 42A, 42B is provided with a hollow part 43 in the longitudinal direction. The airflow stop 42A is arranged over the respective inter-column clearances 38a, 38b, and is wider than the inter-column clearances 38a, 38b and thinner than the inter-column clearances 38a, 38b in a natural state. The airflow stop 42A is arranged with its widthwise direction oriented in the widthwise direction of the inter-column clearances 38a, 38b, and is compressed in the widthwise direction. The airflow stop 42B has the same configuration as the airflow stop 42A, and is arranged across the inter-column gaps 38c and 38d. The airflow stop 42A, 42B are in close contact with each other at the intersection.SELECTED DRAWING: Figure 4
【課題】建物ユニットの柱が集合する柱集合部において、隣り合う柱間の隙間に通気遮断部材を好適に配設することができる柱集合部における通気遮断構造及び、その通気遮断構造の構築方法を提供する。【解決手段】複数の柱21が集合する柱集合部16には、一対の気流止め42A,42Bが設けられている。各気流止め42A,42Bには、長さ方向に貫通する中空部43が設けられている。気流止め42Aは、各柱間隙間38a,38bに跨って配設され、自然状態において、幅が柱間隙間38a,38bの幅よりも大きく、厚みが柱間隙間38a,38bの幅よりも小さくなっている。気流止め42Aは、幅方向を柱間隙間38a,38bの幅方向に向けて配設され、幅方向に圧縮された状態とされている。気流止め42Bは、気流止め42Aと同様の構成で各柱間隙間38c,38dに跨って配設されている。各気流止め42A,42Bは、互いの交差部にて密着されている。【選択図】図4
METHOD FOR CONSTRUCTING VENTILATION BLOCKING STRUCTURE IN COLUMN ASSEMBLY PART AND VENTILATION BLOCKING STRUCTURE IN COLUMN ASSEMBLY PART
To provide a ventilation shut-off structure in a column assembly part capable of suitably arranging a ventilation shut-off member in a clearance between adjacent columns in the column assembly part where the columns of a building unit are assembled, and a construction method of the ventilation shut-off structure.SOLUTION: A column assembly part 16 where a plurality of columns 21 are assembled is provided with a pair of airflow stop 42A, 42B, and each of the airflow stop 42A, 42B is provided with a hollow part 43 in the longitudinal direction. The airflow stop 42A is arranged over the respective inter-column clearances 38a, 38b, and is wider than the inter-column clearances 38a, 38b and thinner than the inter-column clearances 38a, 38b in a natural state. The airflow stop 42A is arranged with its widthwise direction oriented in the widthwise direction of the inter-column clearances 38a, 38b, and is compressed in the widthwise direction. The airflow stop 42B has the same configuration as the airflow stop 42A, and is arranged across the inter-column gaps 38c and 38d. The airflow stop 42A, 42B are in close contact with each other at the intersection.SELECTED DRAWING: Figure 4
【課題】建物ユニットの柱が集合する柱集合部において、隣り合う柱間の隙間に通気遮断部材を好適に配設することができる柱集合部における通気遮断構造及び、その通気遮断構造の構築方法を提供する。【解決手段】複数の柱21が集合する柱集合部16には、一対の気流止め42A,42Bが設けられている。各気流止め42A,42Bには、長さ方向に貫通する中空部43が設けられている。気流止め42Aは、各柱間隙間38a,38bに跨って配設され、自然状態において、幅が柱間隙間38a,38bの幅よりも大きく、厚みが柱間隙間38a,38bの幅よりも小さくなっている。気流止め42Aは、幅方向を柱間隙間38a,38bの幅方向に向けて配設され、幅方向に圧縮された状態とされている。気流止め42Bは、気流止め42Aと同様の構成で各柱間隙間38c,38dに跨って配設されている。各気流止め42A,42Bは、互いの交差部にて密着されている。【選択図】図4
METHOD FOR CONSTRUCTING VENTILATION BLOCKING STRUCTURE IN COLUMN ASSEMBLY PART AND VENTILATION BLOCKING STRUCTURE IN COLUMN ASSEMBLY PART
柱集合部における通気遮断構造の構築方法、及び柱集合部における通気遮断構造
ARITOMI YUKA (author)
2023-04-03
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Roadbed slope water-blocking ventilation type protection structure
European Patent Office | 2020
|Roadbed slope protection structure convenient for water blocking and ventilation
European Patent Office | 2021
|