A platform for research: civil engineering, architecture and urbanism
To provide a maintenance method for artificial turf around a soil-paved area, in which the artificial turf is regenerated by suitably removing pavement soil that has been scattered and adhered to piles.SOLUTION: An artificial turf maintenance method according to the present invention is the artificial turf maintenance method for a ground including a soil paving region 30 paved with paving soil 31 and an artificial turf 20 laid around the soil paving region, the method comprises: a loosening step of loosening the paving soil scattered on the artificial turf and fixed and/or deposited between piles 21 constituting the artificial turf together with the piles; a scraping step of scraping the paving soil loosened from the piles; a suction step for sucking the paving soil remaining between the piles; an alignment step for erecting and arranging the piles; and a filling step for filling new silica sand 23 and rubber chips 24 between the piles.SELECTED DRAWING: Figure 3
【課題】本発明は、土舗装領域の周りにある人工芝のメンテナンス工法であって、飛散してパイルに固着した舗装土を好適に除去し、人工芝を再生するメンテナンス工法を提供する。【解決手段】本発明に係る人工芝のメンテナンス工法は、舗装土31で舗装された土舗装領域30と、前記土舗装領域周りに敷設された人工芝20と、を含むグラウンドの人工芝メンテナンス工法であって、前記人工芝に飛散し、前記人工芝を構成するパイル21間に固着及び/又は堆積した前記舗装土を前記パイルと共に解す解し工程と、前記パイルから解された前記舗装土を掻き出す掻出工程と、前記パイル間に残留する前記舗装土を吸引する吸引工程と、前記パイルを起立させて整える整列工程と、前記パイル間に新しい珪砂23及びゴムチップ24を充填する充填工程と、を含む。【選択図】図3
To provide a maintenance method for artificial turf around a soil-paved area, in which the artificial turf is regenerated by suitably removing pavement soil that has been scattered and adhered to piles.SOLUTION: An artificial turf maintenance method according to the present invention is the artificial turf maintenance method for a ground including a soil paving region 30 paved with paving soil 31 and an artificial turf 20 laid around the soil paving region, the method comprises: a loosening step of loosening the paving soil scattered on the artificial turf and fixed and/or deposited between piles 21 constituting the artificial turf together with the piles; a scraping step of scraping the paving soil loosened from the piles; a suction step for sucking the paving soil remaining between the piles; an alignment step for erecting and arranging the piles; and a filling step for filling new silica sand 23 and rubber chips 24 between the piles.SELECTED DRAWING: Figure 3
【課題】本発明は、土舗装領域の周りにある人工芝のメンテナンス工法であって、飛散してパイルに固着した舗装土を好適に除去し、人工芝を再生するメンテナンス工法を提供する。【解決手段】本発明に係る人工芝のメンテナンス工法は、舗装土31で舗装された土舗装領域30と、前記土舗装領域周りに敷設された人工芝20と、を含むグラウンドの人工芝メンテナンス工法であって、前記人工芝に飛散し、前記人工芝を構成するパイル21間に固着及び/又は堆積した前記舗装土を前記パイルと共に解す解し工程と、前記パイルから解された前記舗装土を掻き出す掻出工程と、前記パイル間に残留する前記舗装土を吸引する吸引工程と、前記パイルを起立させて整える整列工程と、前記パイル間に新しい珪砂23及びゴムチップ24を充填する充填工程と、を含む。【選択図】図3
ARTIFICIAL TURF MAINTENANCE METHOD
人工芝メンテナンス工法
AONO KOZO (author)
2023-04-03
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE