A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF BURIED OBJECT
To provide a method for installing a buried object without causing settling or crack of surrounding ground.SOLUTION: The construction method of a buried object comprises an insertion step of the buried object into soil while injecting a grouting material of a gel time of 5-120 seconds from an injection pipe adjacent to the buried object, and an injection step in which the injection pipe is pulled out after the prescribed buried object is drawn out, the injection pipe is driven again at a position where the grouting material is not completely hardened, and the grouting material is injected from the injection pipe, while pulling out the adjacent buried object not drawn out yet and injecting the grouting material from the injection pipe.SELECTED DRAWING: Figure 2
【課題】 周辺の地盤の沈下やクラック等が発生することなく埋設物を立て込むことができる方法を提供すること。【解決手段】 この方法は、埋設物の施工方法であり、前記埋設物に隣接した注入管から、ゲルタイムが5秒から120秒である注入材を注入しながら該埋設物を地盤内に挿入する工程と、所定の埋設物の引抜が終了した後、前記注入管を引抜き、前記注入材が硬化しきっていない位置に前記注入管を打ち直し、隣接する未だ引抜かれていない埋設物の引抜きを行いながら打ち直した前記注入管から注入材を注入する工程とを含む、埋設物の施工方法である。【選択図】 図2
CONSTRUCTION METHOD OF BURIED OBJECT
To provide a method for installing a buried object without causing settling or crack of surrounding ground.SOLUTION: The construction method of a buried object comprises an insertion step of the buried object into soil while injecting a grouting material of a gel time of 5-120 seconds from an injection pipe adjacent to the buried object, and an injection step in which the injection pipe is pulled out after the prescribed buried object is drawn out, the injection pipe is driven again at a position where the grouting material is not completely hardened, and the grouting material is injected from the injection pipe, while pulling out the adjacent buried object not drawn out yet and injecting the grouting material from the injection pipe.SELECTED DRAWING: Figure 2
【課題】 周辺の地盤の沈下やクラック等が発生することなく埋設物を立て込むことができる方法を提供すること。【解決手段】 この方法は、埋設物の施工方法であり、前記埋設物に隣接した注入管から、ゲルタイムが5秒から120秒である注入材を注入しながら該埋設物を地盤内に挿入する工程と、所定の埋設物の引抜が終了した後、前記注入管を引抜き、前記注入材が硬化しきっていない位置に前記注入管を打ち直し、隣接する未だ引抜かれていない埋設物の引抜きを行いながら打ち直した前記注入管から注入材を注入する工程とを含む、埋設物の施工方法である。【選択図】 図2
CONSTRUCTION METHOD OF BURIED OBJECT
埋設物の施工方法
YAMASHITA DAICHI (author) / WATANABE HIROAKI (author)
2023-04-14
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|European Patent Office | 2024
|European Patent Office | 2021
|