BLOCK PAVING METHOD AND BLOCK PAVING STRUCTURE
To provide a block paving method and a block paving structure capable of extending a water permeation duration period and discharging muddy water to a lower part of a paving block.SOLUTION: A block paving method comprises: a roadbed layer forming step of forming a roadbed layer on an upper part of a filter layer; a sand cushion layer forming step of forming a sand cushion layer on an upper part of the roadbed layer; a block laying step of laying a plurality of paving blocks on an upper part of the sand cushion layer through a joint part; and a joint sand filling step of filling the joint part with joint sand. In the joint sand filling step, the joint sand is filled up to a height of about 50% to 70% from the bottom of the paving block, and in the block laying step, the paving block formed with a large number of muddy water infiltration holes capable of infiltrating at least the muddy water to a lower surface side of the paving block from a surface and a side surface in a circumferential direction approximately orthogonal to a lower surface is used.SELECTED DRAWING: Figure 1
【課題】透水持続期間を長くすることができ、泥水を舗装用ブロックの下方へ排出可能なブロック舗装方法及びブロック舗装構造を提供すること。【解決手段】フィルター層の上部に路盤層を形成する路盤層形成工程と、路盤層の上部にサンドクッション層を形成するサンドクッション層形成工程と、サンドクッション層の上部に目地部を介して複数個の舗装用ブロックを敷設するブロック敷設工程と、目地部に目地砂を充填する目地砂充填工程とで構成され、目地砂充填工程では、舗装用ブロックの底部から50%乃至70%程度の高さまで目地砂を充填し、またブロック敷設工程では、面及び下面と略直交する周方向の側面から少なくとも泥水を該舗装用ブロックの下面側へ浸透させることが可能な泥水浸透孔が多数形成されている舗装用ブロックを使用するブロック舗装方法。【選択図】図1
BLOCK PAVING METHOD AND BLOCK PAVING STRUCTURE
To provide a block paving method and a block paving structure capable of extending a water permeation duration period and discharging muddy water to a lower part of a paving block.SOLUTION: A block paving method comprises: a roadbed layer forming step of forming a roadbed layer on an upper part of a filter layer; a sand cushion layer forming step of forming a sand cushion layer on an upper part of the roadbed layer; a block laying step of laying a plurality of paving blocks on an upper part of the sand cushion layer through a joint part; and a joint sand filling step of filling the joint part with joint sand. In the joint sand filling step, the joint sand is filled up to a height of about 50% to 70% from the bottom of the paving block, and in the block laying step, the paving block formed with a large number of muddy water infiltration holes capable of infiltrating at least the muddy water to a lower surface side of the paving block from a surface and a side surface in a circumferential direction approximately orthogonal to a lower surface is used.SELECTED DRAWING: Figure 1
【課題】透水持続期間を長くすることができ、泥水を舗装用ブロックの下方へ排出可能なブロック舗装方法及びブロック舗装構造を提供すること。【解決手段】フィルター層の上部に路盤層を形成する路盤層形成工程と、路盤層の上部にサンドクッション層を形成するサンドクッション層形成工程と、サンドクッション層の上部に目地部を介して複数個の舗装用ブロックを敷設するブロック敷設工程と、目地部に目地砂を充填する目地砂充填工程とで構成され、目地砂充填工程では、舗装用ブロックの底部から50%乃至70%程度の高さまで目地砂を充填し、またブロック敷設工程では、面及び下面と略直交する周方向の側面から少なくとも泥水を該舗装用ブロックの下面側へ浸透させることが可能な泥水浸透孔が多数形成されている舗装用ブロックを使用するブロック舗装方法。【選択図】図1
BLOCK PAVING METHOD AND BLOCK PAVING STRUCTURE
ブロック舗装方法及びブロック舗装構造
TSUDA TOKIHIRO (author) / INAGAKI NORIKAZU (author) / TSUDA HISASHI (author)
2023-06-23
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
British Library Conference Proceedings | 2001
EXTERNAL PAVING - Fast-track concrete block paving
Online Contents | 2000
|British Library Conference Proceedings | 1992
Engineering Index Backfile | 1920
|