A platform for research: civil engineering, architecture and urbanism
PARTITION STAND
To suppress decrease of routing workability when storing a power cord in a storage part.SOLUTION: A first holding part 18B and a second holding part 19 are arranged on an opposite side of a recess 12A in a first direction D1 with a pole 11 interposed therebetween, and the first holding part 18B is placed at a position closer to the pole 11 than the second holding part 19. A third holding part 20 and a fourth holding part 21 are arranged on an opposite side of the first holding part 18B in the first direction D1 with the pole 11 interposed therebetween, and the third holding part 20 is placed on an opposite side of the fourth holding part 21 in a second direction D2 with the recess 12A interposed therebetween. Furthermore, spaces 22B and 22C in each of which a power cord 16 can be routed are configured on one side and the other side, respectively, in the first direction D1 with the first holding part 18B interposed therebetween.SELECTED DRAWING: Figure 7
【課題】 電源コードを収納部に収納する際の配索作業性が低下することが抑制する。【解決手段】 第1保持部18B及び第2保持部19は、第1方向D1において、ポール11を挟んで凹部12Aと反対側に配置され、かつ、第1保持部18Bは、第2保持部19よりポール11に近接した位置に配置されており、第3保持部20及び第4保持部21は、第1方向D1において、ポール11を挟んで第1保持部18Bと反対側に配置され、かつ、第3保持部20は、第2方向D2において、凹部12Aを挟んで第4保持部21と反対側に配置されており、さらに、第1方向D1において、第1保持部18Bを挟んで一方側及び他方側に電源コード16が配索可能な空間22B、22Cが構成されている。【選択図】 図7
PARTITION STAND
To suppress decrease of routing workability when storing a power cord in a storage part.SOLUTION: A first holding part 18B and a second holding part 19 are arranged on an opposite side of a recess 12A in a first direction D1 with a pole 11 interposed therebetween, and the first holding part 18B is placed at a position closer to the pole 11 than the second holding part 19. A third holding part 20 and a fourth holding part 21 are arranged on an opposite side of the first holding part 18B in the first direction D1 with the pole 11 interposed therebetween, and the third holding part 20 is placed on an opposite side of the fourth holding part 21 in a second direction D2 with the recess 12A interposed therebetween. Furthermore, spaces 22B and 22C in each of which a power cord 16 can be routed are configured on one side and the other side, respectively, in the first direction D1 with the first holding part 18B interposed therebetween.SELECTED DRAWING: Figure 7
【課題】 電源コードを収納部に収納する際の配索作業性が低下することが抑制する。【解決手段】 第1保持部18B及び第2保持部19は、第1方向D1において、ポール11を挟んで凹部12Aと反対側に配置され、かつ、第1保持部18Bは、第2保持部19よりポール11に近接した位置に配置されており、第3保持部20及び第4保持部21は、第1方向D1において、ポール11を挟んで第1保持部18Bと反対側に配置され、かつ、第3保持部20は、第2方向D2において、凹部12Aを挟んで第4保持部21と反対側に配置されており、さらに、第1方向D1において、第1保持部18Bを挟んで一方側及び他方側に電源コード16が配索可能な空間22B、22Cが構成されている。【選択図】 図7
PARTITION STAND
パーテーションスタンド
KUNUGIHARA MASAICHI (author) / KAMIYA NOBUKUNI (author)
2023-06-27
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES