A platform for research: civil engineering, architecture and urbanism
MEMBER JOINING METHOD AND MEMBER JOINING STRUCTURE FOR PRECAST CONCRETE STRUCTURE
To improve the degree of freedom of construction in a precast concrete structure and to reduce the cost.SOLUTION: A first member (12) having a first reinforcement receiving hole (23) on a side surface is erected at a predetermined position, and a temporary support member (28) is attached to the first member (12) (ST1, ST2). A second member (13) having a second reinforcement receiving hole (22) on an end surface is placed on the temporary support member (28), and the first reinforcement receiving hole (23) and the second reinforcement receiving hole (22) are opposed to each other (ST3). A falling-off prevention reinforcement 24 is arranged so as to extend over the first reinforcement receiving hole (23) and the second reinforcement receiving hole (22) (ST4). A filling material 14 is filled (ST5) in a gap G between the second member (13) and the first member (12), a tension material 15 is arranged (ST6), and after the filling material 14 is cured, prestress is introduced (ST7) into the second member (13) and the first member (12) by applying tensile force to the tendon 15. Thereafter, the temporary support member (28) is removed (ST8).SELECTED DRAWING: Figure 5
【課題】プレキャストコンクリート構造物における施工の自由度を向上し、且つコストを低減する。【解決手段】第1鉄筋受容孔(23)を側面に有する第1部材(12)を所定の位置に立設し、第1部材(12)に仮支持部材(28)を取り付ける(ST1、ST2)。第2鉄筋受容孔(22)を端面に有する第2部材(13)を仮支持部材(28)の上に載置し、第1鉄筋受容孔(23)と第2鉄筋受容孔(22)とを対向させる(ST3)。第1鉄筋受容孔(23)と第2鉄筋受容孔(22)とに亘るように脱落防止筋24を配置する(ST4)。第2部材(13)と第1部材(12)との間の空隙Gに充填材14を充填し(ST5)、緊張材15を配置し(ST6)、充填材14が硬化した後に、緊張材15に緊張力を付与することで第2部材(13)及び第1部材(12)にプレストレスを導入する(ST7)。その後、仮支持部材(28)を撤去する(ST8)。【選択図】図5
MEMBER JOINING METHOD AND MEMBER JOINING STRUCTURE FOR PRECAST CONCRETE STRUCTURE
To improve the degree of freedom of construction in a precast concrete structure and to reduce the cost.SOLUTION: A first member (12) having a first reinforcement receiving hole (23) on a side surface is erected at a predetermined position, and a temporary support member (28) is attached to the first member (12) (ST1, ST2). A second member (13) having a second reinforcement receiving hole (22) on an end surface is placed on the temporary support member (28), and the first reinforcement receiving hole (23) and the second reinforcement receiving hole (22) are opposed to each other (ST3). A falling-off prevention reinforcement 24 is arranged so as to extend over the first reinforcement receiving hole (23) and the second reinforcement receiving hole (22) (ST4). A filling material 14 is filled (ST5) in a gap G between the second member (13) and the first member (12), a tension material 15 is arranged (ST6), and after the filling material 14 is cured, prestress is introduced (ST7) into the second member (13) and the first member (12) by applying tensile force to the tendon 15. Thereafter, the temporary support member (28) is removed (ST8).SELECTED DRAWING: Figure 5
【課題】プレキャストコンクリート構造物における施工の自由度を向上し、且つコストを低減する。【解決手段】第1鉄筋受容孔(23)を側面に有する第1部材(12)を所定の位置に立設し、第1部材(12)に仮支持部材(28)を取り付ける(ST1、ST2)。第2鉄筋受容孔(22)を端面に有する第2部材(13)を仮支持部材(28)の上に載置し、第1鉄筋受容孔(23)と第2鉄筋受容孔(22)とを対向させる(ST3)。第1鉄筋受容孔(23)と第2鉄筋受容孔(22)とに亘るように脱落防止筋24を配置する(ST4)。第2部材(13)と第1部材(12)との間の空隙Gに充填材14を充填し(ST5)、緊張材15を配置し(ST6)、充填材14が硬化した後に、緊張材15に緊張力を付与することで第2部材(13)及び第1部材(12)にプレストレスを導入する(ST7)。その後、仮支持部材(28)を撤去する(ST8)。【選択図】図5
MEMBER JOINING METHOD AND MEMBER JOINING STRUCTURE FOR PRECAST CONCRETE STRUCTURE
プレキャストコンクリート構造の部材接合方法及び部材接合構造
TANO KENJI (author) / MATSUNAGA KENTARO (author) / SHIMODAIRA HARUKA (author) / OZU YURIKO (author)
2023-07-24
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2022
|CONCRETE STRUCTURE JOINING METHOD AND PRECAST CONCRETE MEMBER JOINING METHOD
European Patent Office | 2019
|GUIDE MEMBER FOR JOINING CONCRETE PRECAST MEMBERS AND JOINING METHOD OF CONCRETE PRECAST MEMBER
European Patent Office | 2023
|