JUNCTION STRUCTURE BETWEEN STEEL PIPE PILE AND BUILDING, AND JUNCTION METHOD BETWEEN STEEL PIPE PILE AND BUILDING
To provide a junction structure between a steel pipe pile and a building, and a junction method between the steel pipe pile and the building, capable of joining the steel pipe pile and the building with excellent workability and improving the joint strength between the steel pipe pile and the building.SOLUTION: A junction structure 1 of the present invention allows junction to be constructed with excellent workability so as to form a filler 40 in a steel pipe pile P after a pipe body 12 of a junction member 10 covers the steel pipe pile P and a bar-like member 13 and a first reinforcement member 14 are inserted into the steel pipe pile P. A second reinforcement member 15 projecting from an inner wall of the steel pipe pile P, the bar-like member 13 of the junction member 10, and the first reinforcement member 14 are buried in the filler 40 in the steel pipe pile P, and the second reinforcement member 15 is placed at a position higher than that of the first reinforcement member 14, which allows resistance to stress upon drawing out a column C from the steel pipe pile P through creation of compressive force between the first reinforcement member 14 and the second reinforcement member 15, to improve the joint strength between the steel pipe pile and the building.SELECTED DRAWING: Figure 1
【課題】鋼管杭と建造物を施工性よく接合することができ、鋼管杭と建造物との接合強度を向上させることができる鋼管杭と建造物との接合構造と鋼管杭と建造物との接合方法を実現する。【解決手段】この接合構造1は、接合部材10の管体12を鋼管杭Pに被せ、棒状部材13と第1の補強部材14を鋼管杭P内に挿し入れた後、鋼管杭Pに充填材40を形成するようにして施工性よく接合することができる。その鋼管杭P内の充填材40には、鋼管杭Pの内壁から張り出している第2の補強部材15と、接合部材10の棒状部材13と第1の補強部材14とが埋め込まれており、第1の補強部材14よりも上側に第2の補強部材15が配置されているので、柱Cが鋼管杭Pから引き抜かれるような応力が作用しても、第1の補強部材14と第2の補強部材15の間に圧縮力が生じることでその応力に抵抗することができ、鋼管杭Pと建造物(柱C)との接合強度が向上する。【選択図】図1
JUNCTION STRUCTURE BETWEEN STEEL PIPE PILE AND BUILDING, AND JUNCTION METHOD BETWEEN STEEL PIPE PILE AND BUILDING
To provide a junction structure between a steel pipe pile and a building, and a junction method between the steel pipe pile and the building, capable of joining the steel pipe pile and the building with excellent workability and improving the joint strength between the steel pipe pile and the building.SOLUTION: A junction structure 1 of the present invention allows junction to be constructed with excellent workability so as to form a filler 40 in a steel pipe pile P after a pipe body 12 of a junction member 10 covers the steel pipe pile P and a bar-like member 13 and a first reinforcement member 14 are inserted into the steel pipe pile P. A second reinforcement member 15 projecting from an inner wall of the steel pipe pile P, the bar-like member 13 of the junction member 10, and the first reinforcement member 14 are buried in the filler 40 in the steel pipe pile P, and the second reinforcement member 15 is placed at a position higher than that of the first reinforcement member 14, which allows resistance to stress upon drawing out a column C from the steel pipe pile P through creation of compressive force between the first reinforcement member 14 and the second reinforcement member 15, to improve the joint strength between the steel pipe pile and the building.SELECTED DRAWING: Figure 1
【課題】鋼管杭と建造物を施工性よく接合することができ、鋼管杭と建造物との接合強度を向上させることができる鋼管杭と建造物との接合構造と鋼管杭と建造物との接合方法を実現する。【解決手段】この接合構造1は、接合部材10の管体12を鋼管杭Pに被せ、棒状部材13と第1の補強部材14を鋼管杭P内に挿し入れた後、鋼管杭Pに充填材40を形成するようにして施工性よく接合することができる。その鋼管杭P内の充填材40には、鋼管杭Pの内壁から張り出している第2の補強部材15と、接合部材10の棒状部材13と第1の補強部材14とが埋め込まれており、第1の補強部材14よりも上側に第2の補強部材15が配置されているので、柱Cが鋼管杭Pから引き抜かれるような応力が作用しても、第1の補強部材14と第2の補強部材15の間に圧縮力が生じることでその応力に抵抗することができ、鋼管杭Pと建造物(柱C)との接合強度が向上する。【選択図】図1
JUNCTION STRUCTURE BETWEEN STEEL PIPE PILE AND BUILDING, AND JUNCTION METHOD BETWEEN STEEL PIPE PILE AND BUILDING
鋼管杭と建造物との接合構造及び鋼管杭と建造物との接合方法
WATANABE KEISUKE (author) / YOSHIDA TAKUYA (author) / HARAGUCHI KEI (author) / OBA AKIRA (author) / SHIMOZONO TOKUO (author) / SHIBATA TAKUSHI (author) / KASHIWAGI YUKIMOTO (author) / SATO AYAKO (author) / ICHIKI DAISUKE (author) / ABE NORIKO (author)
2023-09-13
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2016
|STEEL PIPE PILE CONNECTION STRUCTURE, STEEL PIPE PILE BASE, AND CONNECTION METHOD OF STEEL PIPE PILE
European Patent Office | 2023
|STEEL PIPE PILE CONNECTION STRUCTURE, STEEL PIPE PILE CONNECTION METHOD
European Patent Office | 2022
|STEEL PIPE PILE DEVICE, STEEL PIPE PILE AND METHOD FOR INSTALLING STEEL PIPE PILE
European Patent Office | 2018
|