SLOPE STABILIZING RETAINING WALL CONSTRUCTION METHOD
To install retaining wall panels from a lower stage side toward an upper stage side to construct a retaining wall while an inclination angle of a slope with respect to a horizontal plane is made smaller than an inclination angle of a retaining wall with respect to the horizontal plane after installing retaining wall panels.SOLUTION: After fixing a retaining wall panel 1 to a slope 10 by fixing a head of a reinforcing material 5 that penetrates the retaining wall panel 1 to a surface side, an upper stage side retaining wall panel 3 is suspended above the fixed retaining wall panel 1 and is connected to the fixed retaining wall panel 1. A supporting member 8 is provided to straddle between the upper stage side retaining wall panel 3 and the slope 10. While temporarily supporting the upper stage side retaining wall panel 3 by the fixed retaining wall panel 1 and the slope 10, a head of the reinforcing material 5 is fastened to a surface of the upper stage side retaining wall panel 3 in a state where the reinforcing member 5 penetrates the upper stage side retaining wall panel 3 and tensile force is applied to the reinforcing material 5.SELECTED DRAWING: Figure 1
【課題】法面の水平面に対する傾斜角度を、擁壁パネルを設置した後の擁壁の水平面に対する傾斜角度より小さくしながらも、擁壁パネルを下段側から上段側へ向かって設置し、擁壁を構築することを可能にする。【解決手段】擁壁パネル1を貫通する補強材5の頭部を表面側に定着して法面10に擁壁パネル1を固定した後、固定済みの擁壁パネル1の上に、上段側の擁壁パネル3を吊り込んで固定済みの擁壁パネル1に連結し、上段側の擁壁パネル3と法面10との間に支持部材8を跨設して上段側の擁壁パネル3を固定済みの擁壁パネル1と法面10とに仮支持させながら、上段側の擁壁パネル3を貫通させて補強材5に引張力を付与した状態で、補強材5の頭部を上段側の擁壁パネル3の表面に定着する。【選択図】図1
SLOPE STABILIZING RETAINING WALL CONSTRUCTION METHOD
To install retaining wall panels from a lower stage side toward an upper stage side to construct a retaining wall while an inclination angle of a slope with respect to a horizontal plane is made smaller than an inclination angle of a retaining wall with respect to the horizontal plane after installing retaining wall panels.SOLUTION: After fixing a retaining wall panel 1 to a slope 10 by fixing a head of a reinforcing material 5 that penetrates the retaining wall panel 1 to a surface side, an upper stage side retaining wall panel 3 is suspended above the fixed retaining wall panel 1 and is connected to the fixed retaining wall panel 1. A supporting member 8 is provided to straddle between the upper stage side retaining wall panel 3 and the slope 10. While temporarily supporting the upper stage side retaining wall panel 3 by the fixed retaining wall panel 1 and the slope 10, a head of the reinforcing material 5 is fastened to a surface of the upper stage side retaining wall panel 3 in a state where the reinforcing member 5 penetrates the upper stage side retaining wall panel 3 and tensile force is applied to the reinforcing material 5.SELECTED DRAWING: Figure 1
【課題】法面の水平面に対する傾斜角度を、擁壁パネルを設置した後の擁壁の水平面に対する傾斜角度より小さくしながらも、擁壁パネルを下段側から上段側へ向かって設置し、擁壁を構築することを可能にする。【解決手段】擁壁パネル1を貫通する補強材5の頭部を表面側に定着して法面10に擁壁パネル1を固定した後、固定済みの擁壁パネル1の上に、上段側の擁壁パネル3を吊り込んで固定済みの擁壁パネル1に連結し、上段側の擁壁パネル3と法面10との間に支持部材8を跨設して上段側の擁壁パネル3を固定済みの擁壁パネル1と法面10とに仮支持させながら、上段側の擁壁パネル3を貫通させて補強材5に引張力を付与した状態で、補強材5の頭部を上段側の擁壁パネル3の表面に定着する。【選択図】図1
SLOPE STABILIZING RETAINING WALL CONSTRUCTION METHOD
法面安定化擁壁の構築方法
KAKU TETSUYA (author) / HAYAKAWA MICHIHIRO (author)
2023-10-05
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
SUPPORT STRUCTURE OF RETAINING WALL PANEL IN SLOPE STABILIZING RETAINING WALL
European Patent Office | 2023
|CONSTRUCTION METHOD OF RETAINING WALL FOR NATURAL GROUND SLOPE, AND RETAINING WALL
European Patent Office | 2018
|High slope retaining wall structure and construction method
European Patent Office | 2022
|Slope reinforcing retaining wall and construction method thereof
European Patent Office | 2020
|Slope retaining wall structure and construction method thereof
European Patent Office | 2023
|