A platform for research: civil engineering, architecture and urbanism
PILE CONSTRUCTABILITY EVALUATION SYSTEM, PROGRAM, AND PILE CONSTRUCTABILITY EVALUATION METHOD
To estimate results of a pile construction.SOLUTION: A pile constructability evaluation system includes a site information acquisition portion, an estimation portion, and an output portion. The site information acquisition portion acquires construction place information indicating a location of a construction site and construction site test result information including at least soil quality at each depth obtained at the construction site and N value indicating results of a standard penetration test, as site information. The estimation portion estimates characteristics of construction results occurring in the construction site, based on dictionary information in which teat results information including at least soil quality at each depth obtained in a test and N value indicating results of a standard penetration test, information indicating a conduction place of the test, and occurrence results of characteristics of construction results during pile construction at the conduction place are stored in association with each other, and based on the site information acquired by the site information acquisition portion. The output portion outputs the results estimated by the estimation portion.SELECTED DRAWING: Figure 1
【課題】杭の施工結果を推定する。【解決手段】杭施工性評価システムは、施工現場の位置を示す施工場所情報と、施工現場において得られた深度ごとの土質と標準貫入試験の結果を示すN値とを少なくとも含む施工現場試験結果情報と、を現場情報として取得する現場情報取得部と、試験において得られた深度ごとの土質と標準貫入試験の結果を示すN値とを少なくとも含む試験結果情報と、試験の実施場所を示す情報と、実施場所における杭施工時の施工結果の特徴の発生結果と、を対応付けて記憶した辞書情報と、現場情報取得部が取得した現場情報とに基づいて、施工現場において発生する施工結果の特徴を推定する推定部と、推定部が推定した結果を出力する出力部と、を含む。【選択図】図1
PILE CONSTRUCTABILITY EVALUATION SYSTEM, PROGRAM, AND PILE CONSTRUCTABILITY EVALUATION METHOD
To estimate results of a pile construction.SOLUTION: A pile constructability evaluation system includes a site information acquisition portion, an estimation portion, and an output portion. The site information acquisition portion acquires construction place information indicating a location of a construction site and construction site test result information including at least soil quality at each depth obtained at the construction site and N value indicating results of a standard penetration test, as site information. The estimation portion estimates characteristics of construction results occurring in the construction site, based on dictionary information in which teat results information including at least soil quality at each depth obtained in a test and N value indicating results of a standard penetration test, information indicating a conduction place of the test, and occurrence results of characteristics of construction results during pile construction at the conduction place are stored in association with each other, and based on the site information acquired by the site information acquisition portion. The output portion outputs the results estimated by the estimation portion.SELECTED DRAWING: Figure 1
【課題】杭の施工結果を推定する。【解決手段】杭施工性評価システムは、施工現場の位置を示す施工場所情報と、施工現場において得られた深度ごとの土質と標準貫入試験の結果を示すN値とを少なくとも含む施工現場試験結果情報と、を現場情報として取得する現場情報取得部と、試験において得られた深度ごとの土質と標準貫入試験の結果を示すN値とを少なくとも含む試験結果情報と、試験の実施場所を示す情報と、実施場所における杭施工時の施工結果の特徴の発生結果と、を対応付けて記憶した辞書情報と、現場情報取得部が取得した現場情報とに基づいて、施工現場において発生する施工結果の特徴を推定する推定部と、推定部が推定した結果を出力する出力部と、を含む。【選択図】図1
PILE CONSTRUCTABILITY EVALUATION SYSTEM, PROGRAM, AND PILE CONSTRUCTABILITY EVALUATION METHOD
杭施工性評価システム、プログラム及び杭施工性評価方法
SHIMAZAKI TAKASHI (author) / MUROKI TOMOSHI (author) / UCHI YUKIHIKO (author) / NAKADA TAKAYUKI (author) / TSUKADA YOSHIAKI (author)
2023-10-12
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Springer Verlag | 2024
|Integrating Constructability Tools into Constructability Review Process
British Library Online Contents | 2000
|British Library Conference Proceedings | 1995
|Wiley | 2010
|British Library Conference Proceedings | 1993
|