BALLAST EXCHANGE SYSTEM
To provide a ballast exchange system capable of preventing generating ballast from being mixed with new ballast without monitoring control of workers.SOLUTION: A ballast exchange system 1 comprises a ballast work vehicle 10 and multiple ballast load vehicles 11-16. The multiple ballast load vehicles 11-16 comprise a storage unit 20a that stores generating ballast generated by a ballast exchange work and new ballast used in the ballast exchange work, a first conveyor 22 that conveys the generating ballast in a first direction from a first end part 11a that is one end part of the storage unit 20a to a second end part 11b that is the other end part of the storage unit 20a, a second conveyor 23 that conveys the generating ballast and the new ballast in a second direction opposite to the first direction, sensors 24 and 25 that detect a state of the ballast stored in the storage unit 20a, and a control device 30 that controls conveying speed of the second conveyor 23 that conveys the ballast according to the state of the ballast detected by the sensors 24 and 25.SELECTED DRAWING: Figure 2
【課題】作業員の監視制御なく、発生バラストの新バラストへの混入を防止可能なバラスト交換システムを提供する。【解決手段】バラスト交換システム1は、バラスト作業車10と、複数のバラスト積載車11~16とを有し、複数のバラスト積載車11~16は、バラスト交換作業により発生する発生バラスト及びバラスト交換作業に使用される新バラストを収容する収容部20aと、収容部20aの一方の端部である第1端部11aから収容部20aの他方の端部である第2端部11bに向かう第1方向に発生バラストを搬送する第1搬送機22と、発生バラスト及び新バラストを、第1方向と反対の第2方向に搬送する第2搬送機23と、収容部20aに収容されるバラストの状態を検知するセンサ24及び25と、センサ24及び24によって検知されたバラストの状態に応じて、バラストを搬送する第2搬送機23の搬送速度を制御する制御装置30とを有する。【選択図】図2
BALLAST EXCHANGE SYSTEM
To provide a ballast exchange system capable of preventing generating ballast from being mixed with new ballast without monitoring control of workers.SOLUTION: A ballast exchange system 1 comprises a ballast work vehicle 10 and multiple ballast load vehicles 11-16. The multiple ballast load vehicles 11-16 comprise a storage unit 20a that stores generating ballast generated by a ballast exchange work and new ballast used in the ballast exchange work, a first conveyor 22 that conveys the generating ballast in a first direction from a first end part 11a that is one end part of the storage unit 20a to a second end part 11b that is the other end part of the storage unit 20a, a second conveyor 23 that conveys the generating ballast and the new ballast in a second direction opposite to the first direction, sensors 24 and 25 that detect a state of the ballast stored in the storage unit 20a, and a control device 30 that controls conveying speed of the second conveyor 23 that conveys the ballast according to the state of the ballast detected by the sensors 24 and 25.SELECTED DRAWING: Figure 2
【課題】作業員の監視制御なく、発生バラストの新バラストへの混入を防止可能なバラスト交換システムを提供する。【解決手段】バラスト交換システム1は、バラスト作業車10と、複数のバラスト積載車11~16とを有し、複数のバラスト積載車11~16は、バラスト交換作業により発生する発生バラスト及びバラスト交換作業に使用される新バラストを収容する収容部20aと、収容部20aの一方の端部である第1端部11aから収容部20aの他方の端部である第2端部11bに向かう第1方向に発生バラストを搬送する第1搬送機22と、発生バラスト及び新バラストを、第1方向と反対の第2方向に搬送する第2搬送機23と、収容部20aに収容されるバラストの状態を検知するセンサ24及び25と、センサ24及び24によって検知されたバラストの状態に応じて、バラストを搬送する第2搬送機23の搬送速度を制御する制御装置30とを有する。【選択図】図2
BALLAST EXCHANGE SYSTEM
バラスト交換システム
NAKANO SHOHEI (author) / ISHII TOSHIAKI (author) / NAGASE TAKAHIRO (author) / MIYAMOTO SHOTA (author)
2023-10-12
Patent
Electronic Resource
Japanese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
BALLAST WATER - Monitoring ballast water exchange by satellite
Online Contents | 2012
AQIS's Ballast Water Exchange Verification Process
British Library Online Contents | 2000
Ballast and Ballast Maintenance
Online Contents | 2008
Ballast and Ballast Maintenance
Online Contents | 2002
Vibration reduction system for ballast bed, ballast bed slab, ballast bed and track system
European Patent Office | 2023
|