A platform for research: civil engineering, architecture and urbanism
REINFORCEMENT STRUCTURE FOR EXISTING CONCRETE STRUCTURE AND REINFORCEMENT METHOD FOR EXISTING CONCRETE STRUCTURE
To provide a reinforcing structure for an existing concrete structure capable of suppressing costs for construction and maintenance, and improving the shear strength of the existing concrete structure without damaging the appearance of the existing concrete structure.SOLUTION: Provided is a reinforcing structure 10A of an existing concrete structure 1. A first hole 25 is drilled from a lower surface 2a (first surface) of a beam 2 in a vertical direction (first direction) intersecting an axial direction of the beam 2, and a second hole 35 is drilled from a right side surface 2b (second surface) of the beam 2 in a horizontal direction (second direction) intersecting the axial direction and the vertical direction of the beam 2. A filler F is filled in the first hole 25 and the second hole 35, and a first reinforcing bar 21 and a second reinforcing bar 31 are respectively inserted.SELECTED DRAWING: Figure 2
【課題】施工および維持管理のコストを抑えるとともに、既設コンクリート構造物の外観を損なうことなく、既設コンクリート構造物のせん断耐力を向上させることができる既設コンクリート構造物の補強構造を提供する。【解決手段】既設コンクリート構造物1の補強構造10Aであって、梁2の下面2a(第一面)から、梁2の軸方向に交差する鉛直方向(第一方向)に第一孔部25が削孔されるとともに、梁2の右側面2b(第二面)から、梁2の軸方向および鉛直方向に交差する水平方向(第二方向)に第二孔部35が削孔されている。そして、第一孔部25内および第二孔部35内に、充填材Fがそれぞれ充填されるとともに、第一補強鉄筋21および第二補強鉄筋31がそれぞれ挿入されている。【選択図】図2
REINFORCEMENT STRUCTURE FOR EXISTING CONCRETE STRUCTURE AND REINFORCEMENT METHOD FOR EXISTING CONCRETE STRUCTURE
To provide a reinforcing structure for an existing concrete structure capable of suppressing costs for construction and maintenance, and improving the shear strength of the existing concrete structure without damaging the appearance of the existing concrete structure.SOLUTION: Provided is a reinforcing structure 10A of an existing concrete structure 1. A first hole 25 is drilled from a lower surface 2a (first surface) of a beam 2 in a vertical direction (first direction) intersecting an axial direction of the beam 2, and a second hole 35 is drilled from a right side surface 2b (second surface) of the beam 2 in a horizontal direction (second direction) intersecting the axial direction and the vertical direction of the beam 2. A filler F is filled in the first hole 25 and the second hole 35, and a first reinforcing bar 21 and a second reinforcing bar 31 are respectively inserted.SELECTED DRAWING: Figure 2
【課題】施工および維持管理のコストを抑えるとともに、既設コンクリート構造物の外観を損なうことなく、既設コンクリート構造物のせん断耐力を向上させることができる既設コンクリート構造物の補強構造を提供する。【解決手段】既設コンクリート構造物1の補強構造10Aであって、梁2の下面2a(第一面)から、梁2の軸方向に交差する鉛直方向(第一方向)に第一孔部25が削孔されるとともに、梁2の右側面2b(第二面)から、梁2の軸方向および鉛直方向に交差する水平方向(第二方向)に第二孔部35が削孔されている。そして、第一孔部25内および第二孔部35内に、充填材Fがそれぞれ充填されるとともに、第一補強鉄筋21および第二補強鉄筋31がそれぞれ挿入されている。【選択図】図2
REINFORCEMENT STRUCTURE FOR EXISTING CONCRETE STRUCTURE AND REINFORCEMENT METHOD FOR EXISTING CONCRETE STRUCTURE
既設コンクリート構造物の補強構造および既設コンクリート構造物の補強方法
KAWAMURA KEISUKE (author)
2023-10-17
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
ASEISMIC REINFORCEMENT STRUCTURE FOR EXISTING CONCRETE STRUCTURE
European Patent Office | 2017
|ANTI-SEISMIC REINFORCEMENT STRUCTURE FOR EXISTING CONCRETE MEMBER
European Patent Office | 2019
|European Patent Office | 2018
|European Patent Office | 2024
|