A platform for research: civil engineering, architecture and urbanism
To suppress an increase in the number of steel frames and an increase in the cost of the steel frames, and improve construction efficiency.SOLUTION: A slab deck composed of a plurality of truss-streaked decks 10 arranged in a slab construction region between adjacent steel beams having a height difference in a structure and provided with main streaks 3 integrally framed on a plate surface of a deck plate 2 composed of steel plates, comprises an upper level horizontal deck 10A fixed to a first steel beam 11 located at a high level, a lower level horizontal deck 10B fixed to a second steel beam 12 located at a low level, and an inclined deck 10C arranged between the upper level horizontal deck 10A and the lower level horizontal deck 10B, joined to the respective decks 10A and 10B and extending diagonally.SELECTED DRAWING: Figure 1
【課題】鉄骨数量の増大を抑え、鉄骨にかかるコストの増大を抑制でき、施工効率の向上を図ることができる。【解決手段】構造物における高低差を有する隣り合う鉄骨梁間のスラブ施工領域に配置され、鋼板からなるデッキプレート2の板面に骨組みされて一体に設けられた主筋3を備えた複数のトラス筋付きデッキ10からなるスラブデッキであって、高いレベルに位置する第1鉄骨梁11に固定される上段水平デッキ10Aと、低いレベルに位置する第2鉄骨梁12に固定される下段水平デッキ10Bと、上段水平デッキ10A及び下段水平デッキ10Bの間に配置され、それぞれのデッキ10A、10Bに接合されて斜めに延在する傾斜デッキ10Cと、からなる構成のスラブデッキを提供する。【選択図】図1
To suppress an increase in the number of steel frames and an increase in the cost of the steel frames, and improve construction efficiency.SOLUTION: A slab deck composed of a plurality of truss-streaked decks 10 arranged in a slab construction region between adjacent steel beams having a height difference in a structure and provided with main streaks 3 integrally framed on a plate surface of a deck plate 2 composed of steel plates, comprises an upper level horizontal deck 10A fixed to a first steel beam 11 located at a high level, a lower level horizontal deck 10B fixed to a second steel beam 12 located at a low level, and an inclined deck 10C arranged between the upper level horizontal deck 10A and the lower level horizontal deck 10B, joined to the respective decks 10A and 10B and extending diagonally.SELECTED DRAWING: Figure 1
【課題】鉄骨数量の増大を抑え、鉄骨にかかるコストの増大を抑制でき、施工効率の向上を図ることができる。【解決手段】構造物における高低差を有する隣り合う鉄骨梁間のスラブ施工領域に配置され、鋼板からなるデッキプレート2の板面に骨組みされて一体に設けられた主筋3を備えた複数のトラス筋付きデッキ10からなるスラブデッキであって、高いレベルに位置する第1鉄骨梁11に固定される上段水平デッキ10Aと、低いレベルに位置する第2鉄骨梁12に固定される下段水平デッキ10Bと、上段水平デッキ10A及び下段水平デッキ10Bの間に配置され、それぞれのデッキ10A、10Bに接合されて斜めに延在する傾斜デッキ10Cと、からなる構成のスラブデッキを提供する。【選択図】図1
SLAB DECK
スラブデッキ
HASEGAWA RYUTA (author)
2023-12-01
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
DECK SLAB, DECK SLAB CONSTRUCTION METHOD, AND DECK SLAB DESIGN METHOD
European Patent Office | 2023
|DECK PLATE FOR DECK COMPOSITE SLAB AND DECK COMPOSITE SLAB
European Patent Office | 2023
|