A platform for research: civil engineering, architecture and urbanism
METHOD FOR INSTALLING SUSPENDED SCAFFOLD
To provide means that contributes to improvement in the efficiency of fixing work for a suspended scaffold.SOLUTION: The present invention relates to a method for installing a suspended scaffold, which comprises: fitting by insertion a hook X3 having a through hole and an expansion/contraction nut X4 having a freely expanded/contracted screw hole around a long-sized screw bar X2 constituting a suspended scaffold X; moving the expansion/contraction nut X4 on the screw bar X2 with the screw hole expanded to move the hook X3 to a lock position for an installation object (shape steel Y) of the suspended scaffold X; and then contracting and closing the screw hole and thus positioning the expansion/contraction nut X4 on the screw bar X2 to fix the suspended scaffold X.SELECTED DRAWING: Figure 1
【課題】吊り足場の固定作業の施工性の向上に寄与する手段を提供する。【解決手段】吊り足場の設置方法であって、吊り足場Xを構成する長尺のネジ棒X2に対し、貫通孔を有するフックX3と、拡縮自在なネジ穴を有す瑠拡縮ナットX4と、を挿嵌しておき、拡縮ナットX4を、ネジ穴を拡開した状態でネジ棒X2上で移動させることで、フックX3を吊り足場Aの設置対象(形鋼Y)に対する係止位置に遷移させ、その後ネジ穴を縮閉させて、ネジ棒X2上で拡縮ナットX4を位置決めすることで吊り足場Xを固定する。【選択図】図1
METHOD FOR INSTALLING SUSPENDED SCAFFOLD
To provide means that contributes to improvement in the efficiency of fixing work for a suspended scaffold.SOLUTION: The present invention relates to a method for installing a suspended scaffold, which comprises: fitting by insertion a hook X3 having a through hole and an expansion/contraction nut X4 having a freely expanded/contracted screw hole around a long-sized screw bar X2 constituting a suspended scaffold X; moving the expansion/contraction nut X4 on the screw bar X2 with the screw hole expanded to move the hook X3 to a lock position for an installation object (shape steel Y) of the suspended scaffold X; and then contracting and closing the screw hole and thus positioning the expansion/contraction nut X4 on the screw bar X2 to fix the suspended scaffold X.SELECTED DRAWING: Figure 1
【課題】吊り足場の固定作業の施工性の向上に寄与する手段を提供する。【解決手段】吊り足場の設置方法であって、吊り足場Xを構成する長尺のネジ棒X2に対し、貫通孔を有するフックX3と、拡縮自在なネジ穴を有す瑠拡縮ナットX4と、を挿嵌しておき、拡縮ナットX4を、ネジ穴を拡開した状態でネジ棒X2上で移動させることで、フックX3を吊り足場Aの設置対象(形鋼Y)に対する係止位置に遷移させ、その後ネジ穴を縮閉させて、ネジ棒X2上で拡縮ナットX4を位置決めすることで吊り足場Xを固定する。【選択図】図1
METHOD FOR INSTALLING SUSPENDED SCAFFOLD
吊り足場の設置方法
SEKIYAMA MASAKATSU (author) / SATO SHINOBU (author) / WADA SOHEI (author) / ITO MASAKI (author) / OKADA TETSUO (author) / ISHII RYOTA (author) / TOMIZAWA ITSUKI (author) / SUZUKI HAZUKI (author)
2023-12-06
Patent
Electronic Resource
Japanese
DEVICE FOR INSTALLING SUSPENDED SCAFFOLD AND METHOD FOR INSTALLING SUSPENDED SCAFFOLD
European Patent Office | 2023
|SUSPENDED SCAFFOLD AND METHOD FOR INSTALLING SUSPENDED SCAFFOLD
European Patent Office | 2023
|METHOD FOR INSTALLING SUSPENDED SCAFFOLD ON BRIDGE STRUCTURE AND FLOAT ATTACHED SUSPENDED SCAFFOLD
European Patent Office | 2017
|SUSPENDED SCAFFOLD FOR BRIDGE MAINTENANCE AND METHOD FOR INSTALLING SAME
European Patent Office | 2015
|