A platform for research: civil engineering, architecture and urbanism
DUCT BURIAL METHOD AND DUCT PANEL AND EDGE PROTECTION USED FOR THIS METHOD
To enable burying a duct through a beam without providing an opening larger than the duct's outer diameter in the beam, eliminating supporting work to facilitate performing work independently and easily, and easily removing a formwork without damaging the duct's interior and exterior surfaces.SOLUTION: In panel preparation step S1, a duct panel 10 with a duct hole 11 and an outer periphery 10a is prepared. In opening setting step S2, formwork openings 6 are provided on the sides of a formwork 3. In duct positioning step S3, an outer end face of a duct 7 is positioned outside the formwork 3. In opening sealing step S4, the duct 7 is passed through the duct hole 11 and the outer periphery of the duct panel 10 is fixed to the formwork opening 6 in a liquid-tight manner. In panel fixing step S5, the duct panel 10 is fixed to the formwork 3. In concrete placing step S6, concrete is placed inside the formwork 3.SELECTED DRAWING: Figure 7
【課題】相番工事を無くし独立して容易に実施でき、ダクトの外径より大きな開口を梁に設けることなくダクトを梁に貫通させて埋設することができ、ダクト内外面を傷つけることなく容易に型枠を取り外すことができる。【解決手段】パネル準備ステップS1で、ダクト穴11と外周部10aを有するダクトパネル10を準備する。開口設定ステップS2で、型枠3の側面に型枠開口6を設ける。ダクト位置決めステップS3で、ダクト7の外部端面を型枠3の外部に位置決めする。開口塞ぎステップS4で、ダクト7をダクト穴11に通し、ダクトパネル10の外周部を型枠開口6に液密に固定する。パネル固定ステップS5で、ダクトパネル10を型枠3に固定する。コンクリート打設ステップS6で、型枠3の内側にコンクリートを打設する。【選択図】図7
DUCT BURIAL METHOD AND DUCT PANEL AND EDGE PROTECTION USED FOR THIS METHOD
To enable burying a duct through a beam without providing an opening larger than the duct's outer diameter in the beam, eliminating supporting work to facilitate performing work independently and easily, and easily removing a formwork without damaging the duct's interior and exterior surfaces.SOLUTION: In panel preparation step S1, a duct panel 10 with a duct hole 11 and an outer periphery 10a is prepared. In opening setting step S2, formwork openings 6 are provided on the sides of a formwork 3. In duct positioning step S3, an outer end face of a duct 7 is positioned outside the formwork 3. In opening sealing step S4, the duct 7 is passed through the duct hole 11 and the outer periphery of the duct panel 10 is fixed to the formwork opening 6 in a liquid-tight manner. In panel fixing step S5, the duct panel 10 is fixed to the formwork 3. In concrete placing step S6, concrete is placed inside the formwork 3.SELECTED DRAWING: Figure 7
【課題】相番工事を無くし独立して容易に実施でき、ダクトの外径より大きな開口を梁に設けることなくダクトを梁に貫通させて埋設することができ、ダクト内外面を傷つけることなく容易に型枠を取り外すことができる。【解決手段】パネル準備ステップS1で、ダクト穴11と外周部10aを有するダクトパネル10を準備する。開口設定ステップS2で、型枠3の側面に型枠開口6を設ける。ダクト位置決めステップS3で、ダクト7の外部端面を型枠3の外部に位置決めする。開口塞ぎステップS4で、ダクト7をダクト穴11に通し、ダクトパネル10の外周部を型枠開口6に液密に固定する。パネル固定ステップS5で、ダクトパネル10を型枠3に固定する。コンクリート打設ステップS6で、型枠3の内側にコンクリートを打設する。【選択図】図7
DUCT BURIAL METHOD AND DUCT PANEL AND EDGE PROTECTION USED FOR THIS METHOD
ダクト埋設工法とこれに用いるダクトパネルと端部保護具
KURUSU TOKUJI (author) / KINOSHITA MASAMITSU (author)
2023-12-26
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste