BRIDGE RENEWAL METHOD AND SUPPORT SYSTEM
To provide a renewal method and a support system that can reduce a construction period for bridge renewal work, including a period of traffic restriction.SOLUTION: A support system 10 is a system that supports renewal work for a bridge in which multiple deck slabs are arranged side by side in a bridge axial direction. The support system 10 acquires on-road point cloud data of an existing bridge taken from above, and under-road point cloud data of the existing bridge obtained by imaging the underside of the existing bridge, and generates a 3D model of the existing bridge by combining the on-road point cloud data with the under-road point cloud data. The support system 10 allocates new floor slabs and generates design data for new floor slabs through allocation simulation based on the 3D model and allocation rules.SELECTED DRAWING: Figure 2
【課題】交通規制の期間を含めた橋梁のリニューアル工事の工期を短縮することができるリニューアル方法および支援システムを提供する。【解決手段】支援システム10は、橋軸方向に複数の床版が並設された橋梁のリニューアルを支援するシステムである。支援システム10は、既設橋梁を上空から撮像した既設橋梁の路上点群データと既設橋梁の路下を撮像した既設橋梁の路下点群データとを取得し、路上点群データと路下点群データとを合成して既設橋梁の3Dモデルを作成する。支援システム10は、その3Dモデルと割付ルールとに基づく割付シミュレーションにより新設床版の割付を行い、新設床版の設計データを作成する。【選択図】図2
BRIDGE RENEWAL METHOD AND SUPPORT SYSTEM
To provide a renewal method and a support system that can reduce a construction period for bridge renewal work, including a period of traffic restriction.SOLUTION: A support system 10 is a system that supports renewal work for a bridge in which multiple deck slabs are arranged side by side in a bridge axial direction. The support system 10 acquires on-road point cloud data of an existing bridge taken from above, and under-road point cloud data of the existing bridge obtained by imaging the underside of the existing bridge, and generates a 3D model of the existing bridge by combining the on-road point cloud data with the under-road point cloud data. The support system 10 allocates new floor slabs and generates design data for new floor slabs through allocation simulation based on the 3D model and allocation rules.SELECTED DRAWING: Figure 2
【課題】交通規制の期間を含めた橋梁のリニューアル工事の工期を短縮することができるリニューアル方法および支援システムを提供する。【解決手段】支援システム10は、橋軸方向に複数の床版が並設された橋梁のリニューアルを支援するシステムである。支援システム10は、既設橋梁を上空から撮像した既設橋梁の路上点群データと既設橋梁の路下を撮像した既設橋梁の路下点群データとを取得し、路上点群データと路下点群データとを合成して既設橋梁の3Dモデルを作成する。支援システム10は、その3Dモデルと割付ルールとに基づく割付シミュレーションにより新設床版の割付を行い、新設床版の設計データを作成する。【選択図】図2
BRIDGE RENEWAL METHOD AND SUPPORT SYSTEM
橋梁リニューアル方法および支援システム
HIGURE KAZUMASA (author) / MITAMURA KENJI (author) / YASUDA KEIICHI (author)
2024-01-09
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Engineering Index Backfile | 1902
An interesting method of bridge renewal
Engineering Index Backfile | 1913
SUPPORT STRUCTURE FOR TEMPORARY PIER AND RENEWAL METHOD OF BRIDGE UPPER STRUCTURE
European Patent Office | 2023
|