A platform for research: civil engineering, architecture and urbanism
FLUID CONTROL VALVE AND CONSTRUCTION MACHINE
To provide a fluid control valve which enables air accumulated in a pilot chamber to be removed with a simple structure, and to provide a construction machine including the fluid control valve.SOLUTION: A fluid control valve 1 includes: a pilot casing 12 having a pilot chamber 20; a spool 30 disposed in at least a part of the interior of the pilot casing 12; and an electromagnetic proportional valve 50 provided at the pilot casing 12. The pilot casing 12 has a passage 40 located above the pilot chamber 20. The passage 40 has: a discharge port connected to a tank T; a first opening 25 connected to a valve discharge port 51 of the electromagnetic proportional valve 50; and a second opening 27 connected to the pilot chamber 20. The first opening 25 is provided above the electromagnetic proportional valve 50 in a vertical direction. The second opening 27 is provided above the pilot chamber 20 in the vertical direction.SELECTED DRAWING: Figure 2
【課題】簡素な構造によりパイロット室に滞留したエアを除去することができる流体制御弁と、この流体制御弁を備えた建設機械を提供する。【解決手段】流体制御弁1は、パイロット室20を有するパイロットケーシング12と、パイロットケーシング12の内部の少なくとも一部に配置されたスプール30と、パイロットケーシング12に設けられた電磁比例弁50とを備える。パイロットケーシング12は、パイロット室20より上方に位置する流路40を有する。流路40は、タンクTに接続される排出ポートと、電磁比例弁50の弁排出口51に接続される第1開口部25と、パイロット室20に接続される第2開口部27とを有する。第1開口部25は、電磁比例弁50よりも上下方向で上方に設けられている。第2開口部27は、パイロット室20よりも上下方向で上方に設けられている。【選択図】図2
FLUID CONTROL VALVE AND CONSTRUCTION MACHINE
To provide a fluid control valve which enables air accumulated in a pilot chamber to be removed with a simple structure, and to provide a construction machine including the fluid control valve.SOLUTION: A fluid control valve 1 includes: a pilot casing 12 having a pilot chamber 20; a spool 30 disposed in at least a part of the interior of the pilot casing 12; and an electromagnetic proportional valve 50 provided at the pilot casing 12. The pilot casing 12 has a passage 40 located above the pilot chamber 20. The passage 40 has: a discharge port connected to a tank T; a first opening 25 connected to a valve discharge port 51 of the electromagnetic proportional valve 50; and a second opening 27 connected to the pilot chamber 20. The first opening 25 is provided above the electromagnetic proportional valve 50 in a vertical direction. The second opening 27 is provided above the pilot chamber 20 in the vertical direction.SELECTED DRAWING: Figure 2
【課題】簡素な構造によりパイロット室に滞留したエアを除去することができる流体制御弁と、この流体制御弁を備えた建設機械を提供する。【解決手段】流体制御弁1は、パイロット室20を有するパイロットケーシング12と、パイロットケーシング12の内部の少なくとも一部に配置されたスプール30と、パイロットケーシング12に設けられた電磁比例弁50とを備える。パイロットケーシング12は、パイロット室20より上方に位置する流路40を有する。流路40は、タンクTに接続される排出ポートと、電磁比例弁50の弁排出口51に接続される第1開口部25と、パイロット室20に接続される第2開口部27とを有する。第1開口部25は、電磁比例弁50よりも上下方向で上方に設けられている。第2開口部27は、パイロット室20よりも上下方向で上方に設けられている。【選択図】図2
FLUID CONTROL VALVE AND CONSTRUCTION MACHINE
流体制御弁及び建設機械
KOBAYASHI MASAYUKI (author)
2024-01-17
Patent
Electronic Resource
Japanese
Valve, fluid control valve, fluid system, and construction machine
European Patent Office | 2021
|Fluid control valve, fluid system, and construction machine
European Patent Office | 2021
|FLUID CONTROL VALVE FLUID SYSTEM AND CONSTRUCTION MACHINE
European Patent Office | 2021
|FLUID VALVE FLUID SYSTEM CONSTRUCTION MACHINE AND CONTROL METHOD
European Patent Office | 2021
|