VOID UNIT FOR CONCRETE
To streamline an installation of a plurality of void members in a concrete structure.SOLUTION: A plurality of void members 11 are arranged in a row. A bridging material 2 is stretched over these void members 11. The bridging material 2 is tied and connected to the void members 11 by strips 31 of connecting means 30. The void unit 10 thus created is embedded in a concrete structure 1.SELECTED DRAWING: Figure 1
【課題】コンクリート構造体における複数のボイド部材の設置施工を効率化する。【解決手段】複数のボイド部材11を一列に並べる。これらボイド部材11に架渡材2を架け渡す。連結手段30の条体31によって架渡材2をボイド部材11に縛り付けて連結する。このようにして作成されたボイドユニット10をコンクリート構造体1に埋設する。【選択図】図1
VOID UNIT FOR CONCRETE
To streamline an installation of a plurality of void members in a concrete structure.SOLUTION: A plurality of void members 11 are arranged in a row. A bridging material 2 is stretched over these void members 11. The bridging material 2 is tied and connected to the void members 11 by strips 31 of connecting means 30. The void unit 10 thus created is embedded in a concrete structure 1.SELECTED DRAWING: Figure 1
【課題】コンクリート構造体における複数のボイド部材の設置施工を効率化する。【解決手段】複数のボイド部材11を一列に並べる。これらボイド部材11に架渡材2を架け渡す。連結手段30の条体31によって架渡材2をボイド部材11に縛り付けて連結する。このようにして作成されたボイドユニット10をコンクリート構造体1に埋設する。【選択図】図1
VOID UNIT FOR CONCRETE
コンクリート用ボイドユニット
TANIGUCHI HIROSHI (author) / NAKATANI FUMIYA (author) / KOSAKA NAOYA (author) / SAKAGAMI NORIO (author)
2024-01-25
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CONCRETE VOID SLAB, PRESS MEMBER OF VOID FORMWORK AND CONSTRUCTION METHOD OF CONCRETE VOID SLAB