To provide a column fixing method that improves the accuracy of the position and the direction of a pile when driving the pile into ground.SOLUTION: Disclosed is a method of fixing at least one column 22 in the ground by driving at least one pile 30 into the ground to use the pile 30 as foundation. The method comprises: a pile driving step of forming a vertical hole in the ground by driving the pile 30 to original ground without the prior excavation of a pilot hole, charging sand into the vertical hole formed by pulling out the pile 30 thereafter, driving the pile 30 thereafter to expand outward the sand charged into the vertical hole and its surrounding soil stepwise and compacting, after completion of the compacting, by leaving the pile 30 in the ground in a state of its upper end part projected from the ground surface, and thereby fixing the pile 30 to the ground; and a column connection step of connecting the column 22 to the pile 30 by using a part projected from the ground surface out of the pile 30 fixed to the ground, after the pile 30 is fixed to the ground.SELECTED DRAWING: Figure 13
【課題】杭が地中に打ち込まれたときのその杭の位置および向きに関する精度を向上させる。【解決手段】少なくとも1本の杭30を打撃して地中に打ち込んでその杭30を基礎として用いて少なくとも1本の支柱22を地盤に固定する方法が開示されている。その方法は、下穴が予め掘削されていない元来の地盤に対する杭30の打ち込みによって地盤に縦穴を造成し、その後の杭30の引き抜きによって出現する縦穴内に砂を充填材として投入し、その後の杭30の打ち込みにより、前記縦穴内に投入された砂およびそれの周辺土壌を段階的に外向きに押し拡げながら締め固め、その締固めが完了すると、杭30をそれの上端部が地表から突き出る状態で地中に留置し、それにより、杭30を地盤に固定する杭打ち工程と、杭30が地盤に固定された後、地盤に固定されている杭30のうち地表から突き出る部分を用いて支柱22を杭30に連結する支柱連結工程とを含む。【選択図】図13
To provide a column fixing method that improves the accuracy of the position and the direction of a pile when driving the pile into ground.SOLUTION: Disclosed is a method of fixing at least one column 22 in the ground by driving at least one pile 30 into the ground to use the pile 30 as foundation. The method comprises: a pile driving step of forming a vertical hole in the ground by driving the pile 30 to original ground without the prior excavation of a pilot hole, charging sand into the vertical hole formed by pulling out the pile 30 thereafter, driving the pile 30 thereafter to expand outward the sand charged into the vertical hole and its surrounding soil stepwise and compacting, after completion of the compacting, by leaving the pile 30 in the ground in a state of its upper end part projected from the ground surface, and thereby fixing the pile 30 to the ground; and a column connection step of connecting the column 22 to the pile 30 by using a part projected from the ground surface out of the pile 30 fixed to the ground, after the pile 30 is fixed to the ground.SELECTED DRAWING: Figure 13
【課題】杭が地中に打ち込まれたときのその杭の位置および向きに関する精度を向上させる。【解決手段】少なくとも1本の杭30を打撃して地中に打ち込んでその杭30を基礎として用いて少なくとも1本の支柱22を地盤に固定する方法が開示されている。その方法は、下穴が予め掘削されていない元来の地盤に対する杭30の打ち込みによって地盤に縦穴を造成し、その後の杭30の引き抜きによって出現する縦穴内に砂を充填材として投入し、その後の杭30の打ち込みにより、前記縦穴内に投入された砂およびそれの周辺土壌を段階的に外向きに押し拡げながら締め固め、その締固めが完了すると、杭30をそれの上端部が地表から突き出る状態で地中に留置し、それにより、杭30を地盤に固定する杭打ち工程と、杭30が地盤に固定された後、地盤に固定されている杭30のうち地表から突き出る部分を用いて支柱22を杭30に連結する支柱連結工程とを含む。【選択図】図13
COLUMN FIXING METHOD
支柱固定方法
YOSHIKAWA AKIHIRO (author)
2024-02-02
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
SUPPORT COLUMN FIXING METHOD AND SUPPORT COLUMN FIXING SOCKET
European Patent Office | 2020
|COLUMN BASE FIXING STRUCTURE AND COLUMN BASE FIXING METHOD
European Patent Office | 2015
|COLUMN FIXING STRUCTURE AND COLUMN RECONSTRUCTION METHOD
European Patent Office | 2020
|