CONSTRUCTION TOOL AND CONSTRUCTION METHOD OF ELECTRIC POLE ASEISMATIC REINFORCING WORK
To provide a construction tool and a construction method of electric pole aseismatic reinforcing work allowing installation of a steel pipe unit as a heavy article safely, easily and in a short time within a limited time in night with no train traveling, in a narrow space between an electrification column and a wall handrail.SOLUTION: A construction tool 1 of electric pole aseismatic reinforcing work for performing reinforcement by installing a reinforcing steel pipe (aseismatic reinforcing steel pipe unit 10) outside an existing electrification column EP, has: an electrification column fixing band 2 for fixing to the electrification column EP; a ring rail 3 having a circular or arcuate in plan view jointed to the electrification column fixing band 2; and hanger members 4 each having a guide roller 41 traveling on the ring rail 3 and hanging the aseismatic reinforcing steel pipe unit 10. In a hung state with the hanger members 4, the aseismatic reinforcing steel pipe unit 10 is made to travel on the ring rail 3 by using the guide roller 41, to thereby install the aseismatic reinforcing steel pipe unit 10 in a narrow space by rotating, without raising by manpower.SELECTED DRAWING: Figure 12
【課題】重量物である鋼管ユニットを電化柱と壁高欄との狭隘な隙間に安全に容易、且つ、列車が運行しない夜間の限られた時間内の短時間に設置可能な電柱耐震補強工事の施工治具及び施工方法を提供する。【解決手段】既設の電化柱EPの外側に補強鋼管(耐震補強鋼管ユニット10)を設置して補強する電柱耐震補強工事の施工治具1において、電化柱EPに固定するための電化柱固定バンド2と、この電化柱固定バンド2に接合された平面視円形状又は円弧状のリングレール3と、このリングレール3上を走行するガイドローラー41を有して補強鋼管ユニット10を吊下げるハンガー部材4と、を備え、耐震補強鋼管ユニット10をハンガー部材4で吊下げた状態でガイドローラー41を用いてリングレール3上を走行させることで耐震補強鋼管ユニット10を人力で持ち上げることなく狭隘な隙間に回転して設置する。【選択図】図12
CONSTRUCTION TOOL AND CONSTRUCTION METHOD OF ELECTRIC POLE ASEISMATIC REINFORCING WORK
To provide a construction tool and a construction method of electric pole aseismatic reinforcing work allowing installation of a steel pipe unit as a heavy article safely, easily and in a short time within a limited time in night with no train traveling, in a narrow space between an electrification column and a wall handrail.SOLUTION: A construction tool 1 of electric pole aseismatic reinforcing work for performing reinforcement by installing a reinforcing steel pipe (aseismatic reinforcing steel pipe unit 10) outside an existing electrification column EP, has: an electrification column fixing band 2 for fixing to the electrification column EP; a ring rail 3 having a circular or arcuate in plan view jointed to the electrification column fixing band 2; and hanger members 4 each having a guide roller 41 traveling on the ring rail 3 and hanging the aseismatic reinforcing steel pipe unit 10. In a hung state with the hanger members 4, the aseismatic reinforcing steel pipe unit 10 is made to travel on the ring rail 3 by using the guide roller 41, to thereby install the aseismatic reinforcing steel pipe unit 10 in a narrow space by rotating, without raising by manpower.SELECTED DRAWING: Figure 12
【課題】重量物である鋼管ユニットを電化柱と壁高欄との狭隘な隙間に安全に容易、且つ、列車が運行しない夜間の限られた時間内の短時間に設置可能な電柱耐震補強工事の施工治具及び施工方法を提供する。【解決手段】既設の電化柱EPの外側に補強鋼管(耐震補強鋼管ユニット10)を設置して補強する電柱耐震補強工事の施工治具1において、電化柱EPに固定するための電化柱固定バンド2と、この電化柱固定バンド2に接合された平面視円形状又は円弧状のリングレール3と、このリングレール3上を走行するガイドローラー41を有して補強鋼管ユニット10を吊下げるハンガー部材4と、を備え、耐震補強鋼管ユニット10をハンガー部材4で吊下げた状態でガイドローラー41を用いてリングレール3上を走行させることで耐震補強鋼管ユニット10を人力で持ち上げることなく狭隘な隙間に回転して設置する。【選択図】図12
CONSTRUCTION TOOL AND CONSTRUCTION METHOD OF ELECTRIC POLE ASEISMATIC REINFORCING WORK
電柱耐震補強工事の施工治具及び施工方法
KUSANO HIDEAKI (author) / KOBAYASHI KOKI (author)
2024-03-12
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
ASEISMATIC TANK STRUCTURE AND CONSTRUCTION METHOD OF ASEISMATIC TANK STRUCTURE
European Patent Office | 2017
|ASEISMATIC REINFORCING STRUCTURE OF REINFORCING EARTH WALL
European Patent Office | 2023
|