A platform for research: civil engineering, architecture and urbanism
RACK ENGAGEMENT GUIDE DEVICE FOR MOUNTAIN RAILWAY RACK TRACK AND RACK ENGAGEMENT METHOD USING THE SAME
To provide a rack engagement guide device for mountain railway rack tracks and a rack engagement method using the same.SOLUTION: Since a rack engagement guide device 100 installed in a non-rack section so as to be vertically engaged with a pinion gear formed on a pinion that is installed on the lower axle of a mountain train works in place of rack in non-rack sections where the rack is discontinued, the pinion gear and a rack gear can engage with each other smoothly, and if such a situation occurs that rack sections and non-rack sections for a mountain train traveling on mountain railway rack tracks are mixed, or there are non-rack sections where the rack is discontinued at turnout sections, the continuous operation of the mountain trains is kept without hindrance by connecting the rack sections and the non-rack section.SELECTED DRAWING: Figure 8
【課題】山岳鉄道ラック軌道用ラック噛み合い案内装置およびこれを利用したラック噛み合い方法を提供する。【解決手段】山岳列車の下部の車軸に設置されたピニオンに形成されたピニオンギアとの上下の噛み合いがなされるように非ラック区間に設置されたラック噛み合い案内装置100が、ラックが断絶した非ラック区間でラックの代わりの役割をすることによって、ピニオンギアとラックギアの噛み合いが円滑になされ得、また、山岳鉄道ラック軌道に沿って走行中の山岳列車がラック区間と非ラック区間が混ざる状況が発生したり、分岐器の区間でラックが断絶する非ラック区間が発生する場合、ラック区間と非ラック区間の間を連結することによって、山岳列車の連続的な運行に支障が発生しないようにする。【選択図】図8
RACK ENGAGEMENT GUIDE DEVICE FOR MOUNTAIN RAILWAY RACK TRACK AND RACK ENGAGEMENT METHOD USING THE SAME
To provide a rack engagement guide device for mountain railway rack tracks and a rack engagement method using the same.SOLUTION: Since a rack engagement guide device 100 installed in a non-rack section so as to be vertically engaged with a pinion gear formed on a pinion that is installed on the lower axle of a mountain train works in place of rack in non-rack sections where the rack is discontinued, the pinion gear and a rack gear can engage with each other smoothly, and if such a situation occurs that rack sections and non-rack sections for a mountain train traveling on mountain railway rack tracks are mixed, or there are non-rack sections where the rack is discontinued at turnout sections, the continuous operation of the mountain trains is kept without hindrance by connecting the rack sections and the non-rack section.SELECTED DRAWING: Figure 8
【課題】山岳鉄道ラック軌道用ラック噛み合い案内装置およびこれを利用したラック噛み合い方法を提供する。【解決手段】山岳列車の下部の車軸に設置されたピニオンに形成されたピニオンギアとの上下の噛み合いがなされるように非ラック区間に設置されたラック噛み合い案内装置100が、ラックが断絶した非ラック区間でラックの代わりの役割をすることによって、ピニオンギアとラックギアの噛み合いが円滑になされ得、また、山岳鉄道ラック軌道に沿って走行中の山岳列車がラック区間と非ラック区間が混ざる状況が発生したり、分岐器の区間でラックが断絶する非ラック区間が発生する場合、ラック区間と非ラック区間の間を連結することによって、山岳列車の連続的な運行に支障が発生しないようにする。【選択図】図8
RACK ENGAGEMENT GUIDE DEVICE FOR MOUNTAIN RAILWAY RACK TRACK AND RACK ENGAGEMENT METHOD USING THE SAME
山岳鉄道ラック軌道用ラック噛み合い案内装置およびこれを利用したラック噛み合い方法
EUM KI YOUNG (author) / KIM JAYEON (author) / LEE HYOBUM (author)
2024-04-08
Patent
Electronic Resource
Japanese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
RACK MESH GUIDE APPARATUS FOR MOUNTAIN RAILWAY RACK TRACK AND RACK ENGAGING METHOD USING THE SAME
European Patent Office | 2023
|European Patent Office | 2023
|