CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD OF CONCRETE SLAB
To provide a construction management system and a construction management method of concrete slab capable of easily managing height of a leveling device.SOLUTION: A construction management system of concrete slab includes: a gauge rod 18 for electronic level erected above a leveling device 16; an electronic level 20 placed in a place where the gauge rod 18 for electronic level can be collimated; an input terminal 22 provided at hand of a measuring person M who collimates the gauge rod 18 for electronic level by the electronic level 20, for inputting a height value of the leveling device 16 measured by acquiring the height of the collimation position; an output terminal 24 provided at a position visually recognized by a height adjusting person P, for displaying and outputting a value inputted in the input terminal 22; and adjustment means provided so as to be operated by the height adjusting person P based on the value displayed and outputted in the output terminal 24, for adjusting the height of the leveling device 16 below the gauge rod 18 for electronic level.SELECTED DRAWING: Figure 1
【課題】均し装置の高さを簡便に管理することができるコンクリートスラブの施工管理システムおよび施工管理方法を提供する。【解決手段】均し装置16の上方に立設される電子レベル用標尺18と、前記電子レベル用標尺18を視準可能な場所に配置される電子レベル20と、前記電子レベル20で前記電子レベル用標尺18を視準する測定者Mの手元に設けられ、視準位置の高さを求めることによって計測した前記均し装置16の高さの値を入力するための入力用端末22と、高さ調整者Pが目視可能な位置に設けられ、前記入力用端末22に入力された値を表示出力するための出力用端末24と、前記出力用端末24に表示出力された値に基づいて高さ調整者Pによって操作可能に設けられ、前記電子レベル用標尺18の下方の前記均し装置16の高さを調整する調整手段とを有するようにする。【選択図】図1
CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD OF CONCRETE SLAB
To provide a construction management system and a construction management method of concrete slab capable of easily managing height of a leveling device.SOLUTION: A construction management system of concrete slab includes: a gauge rod 18 for electronic level erected above a leveling device 16; an electronic level 20 placed in a place where the gauge rod 18 for electronic level can be collimated; an input terminal 22 provided at hand of a measuring person M who collimates the gauge rod 18 for electronic level by the electronic level 20, for inputting a height value of the leveling device 16 measured by acquiring the height of the collimation position; an output terminal 24 provided at a position visually recognized by a height adjusting person P, for displaying and outputting a value inputted in the input terminal 22; and adjustment means provided so as to be operated by the height adjusting person P based on the value displayed and outputted in the output terminal 24, for adjusting the height of the leveling device 16 below the gauge rod 18 for electronic level.SELECTED DRAWING: Figure 1
【課題】均し装置の高さを簡便に管理することができるコンクリートスラブの施工管理システムおよび施工管理方法を提供する。【解決手段】均し装置16の上方に立設される電子レベル用標尺18と、前記電子レベル用標尺18を視準可能な場所に配置される電子レベル20と、前記電子レベル20で前記電子レベル用標尺18を視準する測定者Mの手元に設けられ、視準位置の高さを求めることによって計測した前記均し装置16の高さの値を入力するための入力用端末22と、高さ調整者Pが目視可能な位置に設けられ、前記入力用端末22に入力された値を表示出力するための出力用端末24と、前記出力用端末24に表示出力された値に基づいて高さ調整者Pによって操作可能に設けられ、前記電子レベル用標尺18の下方の前記均し装置16の高さを調整する調整手段とを有するようにする。【選択図】図1
CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD OF CONCRETE SLAB
コンクリートスラブの施工管理システムおよび施工管理方法
TAKEMOTO YOSHIAKI (author) / FUKASE YUTARO (author)
2024-04-09
Patent
Electronic Resource
Japanese
CONCRETE SLAB CONSTRUCTION DEVICE AND CONCRETE SLAB CONSTRUCTION METHOD
European Patent Office | 2018
|CONCRETE CONSTRUCTION MANAGEMENT METHOD AND CONSTRUCTION MANAGEMENT SYSTEM
European Patent Office | 2020
|Construction method and construction device of concrete floor slab and concrete floor slab
European Patent Office | 2023
|CONCRETE SLAB SUPPORT STRUCTURE, AND CONCRETE SLAB CONSTRUCTION METHOD
European Patent Office | 2023
|