A platform for research: civil engineering, architecture and urbanism
SUSPENDED CEILING STRUCTURE AND CONNECTION METAL FITTING
To propose suspended ceiling structure that can reduce the labor necessary to connection work for beam materials placed with grid shape to each other.SOLUTION: Suspended ceiling structure 1 comprises hanging members 2 hung from a building frame, first beam materials 31 suspended by the hanging members 2, second beam materials 32 placed in the direction crossing the first beam materials 31, connecting plate materials 4 horizontally laid between an upper end face of the first beam material 31 and an upper end face of the second beam material 32, and connection metal fittings 5 connecting the first beam material 31 and the second beam material 32. The connection metal fitting 5 comprises a base piece 51 placed on the second beam material 32, a pair of suspension pieces 52, 52 additionally disposed to head 35 side faces of the second beam material 32, and fitting pieces 53 mounted to head 35 side faces of the first beam material 31. The base piece 51 is fixed through bolts to an upper end of the second beam material 32, and the fitting piece 33 is fixed through screws to the head 35 side faces of the first beam material 31.SELECTED DRAWING: Figure 3
【課題】格子状に配設された梁材同士の連結作業に要する手間の低減化を図ることができる吊り天井構造を提案する。【解決手段】躯体から吊下される吊り材2と、吊り材2により吊設される第一梁材31と、第一梁材31と交差する向きに配設された第二梁材32と、第一梁材31の上端面と第二梁材32の上端面との間に横架される連結板材4と、第一梁材31と第二梁材32とを連結する連結金具5とを備える吊り天井構造1である。この連結金具5は、第二梁材32の上に配置される基部片51と、第二梁材32の頭部35側面に添設される一対の垂下片52,52と、第一梁材31の頭部35側面に取り付けられる取付片53とを備えている。基部片51は第二梁材32の上端部にボルトを介して固定され、取付片33は第一梁材31の頭部35側面にビスを介して固定される。【選択図】図3
SUSPENDED CEILING STRUCTURE AND CONNECTION METAL FITTING
To propose suspended ceiling structure that can reduce the labor necessary to connection work for beam materials placed with grid shape to each other.SOLUTION: Suspended ceiling structure 1 comprises hanging members 2 hung from a building frame, first beam materials 31 suspended by the hanging members 2, second beam materials 32 placed in the direction crossing the first beam materials 31, connecting plate materials 4 horizontally laid between an upper end face of the first beam material 31 and an upper end face of the second beam material 32, and connection metal fittings 5 connecting the first beam material 31 and the second beam material 32. The connection metal fitting 5 comprises a base piece 51 placed on the second beam material 32, a pair of suspension pieces 52, 52 additionally disposed to head 35 side faces of the second beam material 32, and fitting pieces 53 mounted to head 35 side faces of the first beam material 31. The base piece 51 is fixed through bolts to an upper end of the second beam material 32, and the fitting piece 33 is fixed through screws to the head 35 side faces of the first beam material 31.SELECTED DRAWING: Figure 3
【課題】格子状に配設された梁材同士の連結作業に要する手間の低減化を図ることができる吊り天井構造を提案する。【解決手段】躯体から吊下される吊り材2と、吊り材2により吊設される第一梁材31と、第一梁材31と交差する向きに配設された第二梁材32と、第一梁材31の上端面と第二梁材32の上端面との間に横架される連結板材4と、第一梁材31と第二梁材32とを連結する連結金具5とを備える吊り天井構造1である。この連結金具5は、第二梁材32の上に配置される基部片51と、第二梁材32の頭部35側面に添設される一対の垂下片52,52と、第一梁材31の頭部35側面に取り付けられる取付片53とを備えている。基部片51は第二梁材32の上端部にボルトを介して固定され、取付片33は第一梁材31の頭部35側面にビスを介して固定される。【選択図】図3
SUSPENDED CEILING STRUCTURE AND CONNECTION METAL FITTING
吊り天井構造および連結金具
YASUNAGA TOSHIMI (author) / SHIOHAMA SHINJI (author) / IWASAKI RYOHEI (author) / MATSUMOTO KAZUHISA (author)
2024-05-02
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
BRACE CONNECTION METAL FITTING FOR SUSPENDED CEILING, AND SUSPENDED CEILING STRUCTURE WITH THE SAME
European Patent Office | 2018
|REINFORCING METAL FITTING AND SUSPENDED CEILING STRUCTURE
European Patent Office | 2022
|