A platform for research: civil engineering, architecture and urbanism
SIDE DITCH COVER AND SIDE DITCH USING THE SAME AND CONSTRUCTION METHOD FOR SIDE DITCH COVER
To provide a side ditch cover and a side ditch using the side ditch cover, and a construction method for the side ditch cover that can stably fix the side ditch cover to a side ditch body without providing a notch.SOLUTION: There is provided a side ditch cover 3 attached to a cover holder 22 of a side ditch body 2. The side ditch cover 3 has an outer surface 61 that is inclined inward as the side surface facing a side wall surface 23 of the cover holder 22 goes downward. A side ditch 1A is completed by attaching the side ditch cover 3 to the cover holder 22 of the side ditch body 2 and filling mortar between the cover holder 22 and the outer surface 61 of the side ditch body 2.SELECTED DRAWING: Figure 5
【課題】切欠き部を設けることなく側溝蓋を側溝本体に安定して固定することが可能な側溝蓋およびこれを用いた側溝ならびに側溝蓋の施工方法の提供。【解決手段】側溝本体2の蓋受け部22に装着される側溝蓋3であって、蓋受け部22の側壁面23に対向する側面が下方へ向かうにつれて内側へ傾斜した外面61を有する側溝蓋3である。側溝蓋3を側溝本体2の蓋受け部22に装着し、側溝本体2の蓋受け部22と外面61との間にモルタルを充填することにより側溝1Aが完成する。【選択図】図5
SIDE DITCH COVER AND SIDE DITCH USING THE SAME AND CONSTRUCTION METHOD FOR SIDE DITCH COVER
To provide a side ditch cover and a side ditch using the side ditch cover, and a construction method for the side ditch cover that can stably fix the side ditch cover to a side ditch body without providing a notch.SOLUTION: There is provided a side ditch cover 3 attached to a cover holder 22 of a side ditch body 2. The side ditch cover 3 has an outer surface 61 that is inclined inward as the side surface facing a side wall surface 23 of the cover holder 22 goes downward. A side ditch 1A is completed by attaching the side ditch cover 3 to the cover holder 22 of the side ditch body 2 and filling mortar between the cover holder 22 and the outer surface 61 of the side ditch body 2.SELECTED DRAWING: Figure 5
【課題】切欠き部を設けることなく側溝蓋を側溝本体に安定して固定することが可能な側溝蓋およびこれを用いた側溝ならびに側溝蓋の施工方法の提供。【解決手段】側溝本体2の蓋受け部22に装着される側溝蓋3であって、蓋受け部22の側壁面23に対向する側面が下方へ向かうにつれて内側へ傾斜した外面61を有する側溝蓋3である。側溝蓋3を側溝本体2の蓋受け部22に装着し、側溝本体2の蓋受け部22と外面61との間にモルタルを充填することにより側溝1Aが完成する。【選択図】図5
SIDE DITCH COVER AND SIDE DITCH USING THE SAME AND CONSTRUCTION METHOD FOR SIDE DITCH COVER
側溝蓋およびこれを用いた側溝ならびに側溝蓋の施工方法
NISHI HIROSHI (author)
2024-05-07
Patent
Electronic Resource
Japanese
IPC:
E03F
SEWERS
,
Abwasserkanäle