A platform for research: civil engineering, architecture and urbanism
METHOD FOR MOUNTING BRIDGE FALL PREVENTION DEVICE AND ATTACHMENT USED THEREFOR
To safely and efficiently perform mounting work of a steel bracket to a bridge.SOLUTION: A mounting method for a bridge fall prevention device 1 includes a step of supporting a steel bracket 3 on an attachment 10 enabling lifting by a forklift F, lifting the steel bracket 3 by the forklift F, setting it in a predetermined fixing position, and fixing it. In the attachment 10, a steel bracket mounting part 20 in which a large number of steel balls 19 are arranged in a receiving tray 18 is provided, the steel bracket 3 is placed on the large number of steel balls 19, and when the steel bracket 3 is set at a fixing position, the steel bracket 3 is moved over the steel balls 19 by human power to adjust the installation position.SELECTED DRAWING: Figure 5
【課題】橋梁への鋼製ブラケットの取付作業を安全にかつ効率よく行うことができるようにする。【解決手段】本発明に係る落橋防止装置1の取付方法は、フォークリフトFによる揚重を可能とするアタッチメント10に鋼製ブラケット3を支持した上で、前記鋼製ブラケット3をフォークリフトFによって揚重し、所定の固定位置にセットした後、固定する工程を含む。前記アタッチメント10は、受け皿18内に多数の鋼球19が配置された鋼製ブラケット載置部20が設けられ、前記多数の鋼球19の上に前記鋼製ブラケット3が載置されており、前記鋼製ブラケットを3固定位置にセットする際、前記鋼製ブラケット3を人力で前記鋼球19の上を移動させて設置位置の調整を行うことができるようになっている。【選択図】図5
METHOD FOR MOUNTING BRIDGE FALL PREVENTION DEVICE AND ATTACHMENT USED THEREFOR
To safely and efficiently perform mounting work of a steel bracket to a bridge.SOLUTION: A mounting method for a bridge fall prevention device 1 includes a step of supporting a steel bracket 3 on an attachment 10 enabling lifting by a forklift F, lifting the steel bracket 3 by the forklift F, setting it in a predetermined fixing position, and fixing it. In the attachment 10, a steel bracket mounting part 20 in which a large number of steel balls 19 are arranged in a receiving tray 18 is provided, the steel bracket 3 is placed on the large number of steel balls 19, and when the steel bracket 3 is set at a fixing position, the steel bracket 3 is moved over the steel balls 19 by human power to adjust the installation position.SELECTED DRAWING: Figure 5
【課題】橋梁への鋼製ブラケットの取付作業を安全にかつ効率よく行うことができるようにする。【解決手段】本発明に係る落橋防止装置1の取付方法は、フォークリフトFによる揚重を可能とするアタッチメント10に鋼製ブラケット3を支持した上で、前記鋼製ブラケット3をフォークリフトFによって揚重し、所定の固定位置にセットした後、固定する工程を含む。前記アタッチメント10は、受け皿18内に多数の鋼球19が配置された鋼製ブラケット載置部20が設けられ、前記多数の鋼球19の上に前記鋼製ブラケット3が載置されており、前記鋼製ブラケットを3固定位置にセットする際、前記鋼製ブラケット3を人力で前記鋼球19の上を移動させて設置位置の調整を行うことができるようになっている。【選択図】図5
METHOD FOR MOUNTING BRIDGE FALL PREVENTION DEVICE AND ATTACHMENT USED THEREFOR
落橋防止装置の取付方法及びそれに用いるアタッチメント
SHIBATA YASUSHI (author) / YASUDA YOSHINOBU (author) / KOKUBU SATOSHI (author) / CHANG HAI (author) / MING TU (author) / NAKABAYASHI TAKASHI (author)
2024-05-13
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken