To provide a floor slab connection structure capable of achieving a high wheel load in a vehicle traveling direction and reducing a filler.SOLUTION: In a floor slab connection structure 1, one floor slab 2(1) having a front outer wall 3(f) at least at a front end in a road longitudinal direction is connected to another floor slab 2(2) having a rear outer wall 3(b) at least at a rear end in the road longitudinal direction, a gap 4 is formed by the front outer wall 3 (f) and the rear outer wall 3 (b), a front reinforcement 6 (f) is projected from the front outer wall 3 (f) into the clearance 4, a rear reinforcement 6 (b) is projected from the rear outer wall 6 (b) into the clearance 4, and the clearance 4 is filled with a filler 5.SELECTED DRAWING: Figure 1
【課題】車両走行方向において高い輪荷重を実現でき、充填材を低減できる、床版接続構造を提供する。【解決手段】少なくとも道路長手方向前方端部に前方外壁3(f)を有する一の床版2(1)と、少なくとも道路長手方向後方端部に後方外壁3(b)を有する他の床版2(2)とを接続する、床版接続構造1において、前方外壁3(f)と後方外壁3(b)とによって、隙間4が形成され、前方外壁3(f)から隙間4内へ前方鉄筋6(f)が突出し、後方外壁6(b)から隙間4内へ後方鉄筋6(b)が突出し、隙間4内に充填材5が充填される。【選択図】図1
To provide a floor slab connection structure capable of achieving a high wheel load in a vehicle traveling direction and reducing a filler.SOLUTION: In a floor slab connection structure 1, one floor slab 2(1) having a front outer wall 3(f) at least at a front end in a road longitudinal direction is connected to another floor slab 2(2) having a rear outer wall 3(b) at least at a rear end in the road longitudinal direction, a gap 4 is formed by the front outer wall 3 (f) and the rear outer wall 3 (b), a front reinforcement 6 (f) is projected from the front outer wall 3 (f) into the clearance 4, a rear reinforcement 6 (b) is projected from the rear outer wall 6 (b) into the clearance 4, and the clearance 4 is filled with a filler 5.SELECTED DRAWING: Figure 1
【課題】車両走行方向において高い輪荷重を実現でき、充填材を低減できる、床版接続構造を提供する。【解決手段】少なくとも道路長手方向前方端部に前方外壁3(f)を有する一の床版2(1)と、少なくとも道路長手方向後方端部に後方外壁3(b)を有する他の床版2(2)とを接続する、床版接続構造1において、前方外壁3(f)と後方外壁3(b)とによって、隙間4が形成され、前方外壁3(f)から隙間4内へ前方鉄筋6(f)が突出し、後方外壁6(b)から隙間4内へ後方鉄筋6(b)が突出し、隙間4内に充填材5が充填される。【選択図】図1
FLOOR SLAB CONNECTION STRUCTURE
床版接続構造
KANAO SHIGEKI (author)
2024-06-03
Patent
Electronic Resource
Japanese
CONNECTION STRUCTURE BETWEEN RC FLOOR SLAB AND STEEL FLOOR SLAB
European Patent Office | 2019
|PRECAST FLOOR SLAB CONNECTION STRUCTURE, PRECAST FLOOR SLAB SYSTEM, AND BRIDGE STRUCTURE
European Patent Office | 2016
|