A platform for research: civil engineering, architecture and urbanism
METHOD OF JOINING FLOOR JOISTS IN FLOOR OF SECOND FLOOR OR HIGHER
To provide a method of joining floor joists in a floor of a second floor or higher that is easy to transport and can keep flooring materials horizontal, and connection hardware used for the method.SOLUTION: A plurality of parallel string truss units 10A, 10B are connected in a longitudinal direction using connection hardware 20, 30 so that lower portions of joint surfaces 10a, 10a' of the parallel string truss units 10A, 10B are in contact and upper portions of the joint surfaces 10a, 10a' are separated in the longitudinal direction to form a mountain shape, thus, a parallel string truss joist 1 is constructed, and the parallel string truss joist 1 erected on a pair of opposing structural elements 3 in a building approach horizontally, so the parallel string truss units 10A, 10B are less likely to break in a trough shape at the joints, keeping flooring materials on a second floor or higher horizontal.SELECTED DRAWING: Figure 8
【課題】搬送が簡便であり、かつ床材の水平を保つことができる2階以上の床における床根太の接合方法およびそれに用いられる連結金物を提供する。【解決手段】複数の平行弦トラスユニット10A,10Bを連結金物20,30を用いて平行弦トラスユニット10A,10Bの接合面10a,10a’下部が当接し、接合面10a,10a’上部が長手方向に離間した状態で長手方向に連結して山型になるように平行弦トラス根太1を構成し、建物において対向する一対の構造体3に架設した平行弦トラス根太1が水平に近づくので平行弦トラスユニット10A,10Bの接合部で谷型に折れにくく、2階以上の床材を水平に保つ。【選択図】図8
METHOD OF JOINING FLOOR JOISTS IN FLOOR OF SECOND FLOOR OR HIGHER
To provide a method of joining floor joists in a floor of a second floor or higher that is easy to transport and can keep flooring materials horizontal, and connection hardware used for the method.SOLUTION: A plurality of parallel string truss units 10A, 10B are connected in a longitudinal direction using connection hardware 20, 30 so that lower portions of joint surfaces 10a, 10a' of the parallel string truss units 10A, 10B are in contact and upper portions of the joint surfaces 10a, 10a' are separated in the longitudinal direction to form a mountain shape, thus, a parallel string truss joist 1 is constructed, and the parallel string truss joist 1 erected on a pair of opposing structural elements 3 in a building approach horizontally, so the parallel string truss units 10A, 10B are less likely to break in a trough shape at the joints, keeping flooring materials on a second floor or higher horizontal.SELECTED DRAWING: Figure 8
【課題】搬送が簡便であり、かつ床材の水平を保つことができる2階以上の床における床根太の接合方法およびそれに用いられる連結金物を提供する。【解決手段】複数の平行弦トラスユニット10A,10Bを連結金物20,30を用いて平行弦トラスユニット10A,10Bの接合面10a,10a’下部が当接し、接合面10a,10a’上部が長手方向に離間した状態で長手方向に連結して山型になるように平行弦トラス根太1を構成し、建物において対向する一対の構造体3に架設した平行弦トラス根太1が水平に近づくので平行弦トラスユニット10A,10Bの接合部で谷型に折れにくく、2階以上の床材を水平に保つ。【選択図】図8
METHOD OF JOINING FLOOR JOISTS IN FLOOR OF SECOND FLOOR OR HIGHER
2階以上の床における床根太の接合方法
ISHIKAWA HAJIME (author) / SHIMAMURA SHOGO (author) / SATO TOSHIO (author) / TANAKA AKIRA (author)
2024-08-08
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Framing - Floor Joists and Walls
NTIS | 1994
Strength of precast concrete floor joists
Engineering Index Backfile | 1948
|Load concentrations on steel floor-joists of wood floor highway bridges
Engineering Index Backfile | 1919
Products - Engineered floor joists; large-sized doors
Online Contents | 2003