EXPLOSIVE STORAGE FACILITY, AND CONSTRUCTION METHOD OF THE SAME
To construct an explosive storage facility in a short period of time using a precast construction method.SOLUTION: Side wall portions 10A to 10D, storage chamber bottom slabs 20A, 20B, an isolation chamber bottom slab 30, storage chamber top slabs 40A, 40B, an isolation chamber top slab 50, and a side plate 60 are each manufactured as precast members made of concrete. Here, each of the side wall portions 10A to 10D can have the same shape, each of the storage chamber bottom slabs 20A, 20B can have the same shape, and each of the storage chamber top slabs 40A, 40B can have the same shape. In addition, the side wall portion and the storage chamber top slab can be connected using steel bars (vertical steel bars) extending in a vertical direction, and the storage chamber top slab and the isolation chamber top slab can be connected using steel bars (horizontal steel bars) extending in a horizontal direction.SELECTED DRAWING: Figure 1
【課題】プレキャスト工法を用いて火薬類貯蔵施設を短期間に構築する。【解決手段】側壁部10A~10D、貯蔵室底版20A、20B、隔離室底版30、貯蔵室頂版40A、40B、隔離室頂版50、側板60は、それぞれコンクリートで構成されたプレキャスト部材として製造される。ここでは側壁部10A~10Dの各々を同一、貯蔵室底版20A、20Bの各々を同一、貯蔵室頂版40A、40Bの各々を同一、の形状とすることができる。また、側壁部と貯蔵室頂版の間は、上下方向に延伸する鉄筋(鉛直鉄筋)を用いて連結し、貯蔵室頂版と隔離室頂版の間は、水平方向に延伸する鉄筋(水平鉄筋)を用いて連結することができる。【選択図】図1
EXPLOSIVE STORAGE FACILITY, AND CONSTRUCTION METHOD OF THE SAME
To construct an explosive storage facility in a short period of time using a precast construction method.SOLUTION: Side wall portions 10A to 10D, storage chamber bottom slabs 20A, 20B, an isolation chamber bottom slab 30, storage chamber top slabs 40A, 40B, an isolation chamber top slab 50, and a side plate 60 are each manufactured as precast members made of concrete. Here, each of the side wall portions 10A to 10D can have the same shape, each of the storage chamber bottom slabs 20A, 20B can have the same shape, and each of the storage chamber top slabs 40A, 40B can have the same shape. In addition, the side wall portion and the storage chamber top slab can be connected using steel bars (vertical steel bars) extending in a vertical direction, and the storage chamber top slab and the isolation chamber top slab can be connected using steel bars (horizontal steel bars) extending in a horizontal direction.SELECTED DRAWING: Figure 1
【課題】プレキャスト工法を用いて火薬類貯蔵施設を短期間に構築する。【解決手段】側壁部10A~10D、貯蔵室底版20A、20B、隔離室底版30、貯蔵室頂版40A、40B、隔離室頂版50、側板60は、それぞれコンクリートで構成されたプレキャスト部材として製造される。ここでは側壁部10A~10Dの各々を同一、貯蔵室底版20A、20Bの各々を同一、貯蔵室頂版40A、40Bの各々を同一、の形状とすることができる。また、側壁部と貯蔵室頂版の間は、上下方向に延伸する鉄筋(鉛直鉄筋)を用いて連結し、貯蔵室頂版と隔離室頂版の間は、水平方向に延伸する鉄筋(水平鉄筋)を用いて連結することができる。【選択図】図1
EXPLOSIVE STORAGE FACILITY, AND CONSTRUCTION METHOD OF THE SAME
火薬類貯蔵施設及びその構築方法
ISHII TAKESHI (author) / WATANABE TAKANOBU (author) / INAGAKI KATSUTOSHI (author) / URASAWA YASUHARU (author) / ONO TOMONORI (author)
2024-08-13
Patent
Electronic Resource
Japanese
Explosive components facility certification tests
NTIS | 1995
|RAINWATER STORAGE FACILITY AND CONSTRUCTION METHOD OF RAINWATER STORAGE FACILITY
European Patent Office | 2021
|Safe storage construction method for flammable and explosive dangerous chemical warehouse
European Patent Office | 2022
|