A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR UPPER OBJECT INSTALLATION STRUCTURE, AND THE INSTALLATION STRUCTURE
To provide a construction method which can improve practicability and reduce cost when an upper object is installed on an understructure.SOLUTION: A construction method is for an upper object installation structure which comprises an upper object, a grout material on which the upper object is installed, and a lower structure having a reservoir part to reserve the grout material. The construction method for the upper object installation structure involves: a grout-material-placing step to pour the grout material onto the bottom surface of the reservoir part; a bottom grout-material-filling step which fills the grout material between the undersurface of the upper object and the bottom surface of the reservoir part with the undersurface of the upper object pressing the grout material downward; and a side grout-material-filling step which makes the grout material filled to a level at or above the undersurface of the upper object with the grout material flowing up to the side surface of the reservoir part.SELECTED DRAWING: Figure 15
【課題】上部物体を下部構造に設置する際に、実用性を高くし、かつコストを低減することができる施工方法を提供する。【解決手段】上部物体と、前記上部物体が設置されるグラウト材と、前記グラウト材を貯留する貯留部を備えた下部構造と、を有する上部物体の設置構造の施工方法であって、前記貯留部の底面にグラウト材を打設するグラウト材打設ステップと、前記上部物体の下面で前記グラウト材を下方に押圧することで、前記上部物体の下面と前記貯留部の底面との間に前記グラウト材が充填される底部グラウト材充填ステップと、前記グラウト材が前記貯留部の側面まで流入することで、前記貯留部において前記上部物体の下面以上に前記グラウト材が充填される側部グラウト材充填ステップと、を行う上部物体の設置構造の施工方法である。【選択図】図15
CONSTRUCTION METHOD FOR UPPER OBJECT INSTALLATION STRUCTURE, AND THE INSTALLATION STRUCTURE
To provide a construction method which can improve practicability and reduce cost when an upper object is installed on an understructure.SOLUTION: A construction method is for an upper object installation structure which comprises an upper object, a grout material on which the upper object is installed, and a lower structure having a reservoir part to reserve the grout material. The construction method for the upper object installation structure involves: a grout-material-placing step to pour the grout material onto the bottom surface of the reservoir part; a bottom grout-material-filling step which fills the grout material between the undersurface of the upper object and the bottom surface of the reservoir part with the undersurface of the upper object pressing the grout material downward; and a side grout-material-filling step which makes the grout material filled to a level at or above the undersurface of the upper object with the grout material flowing up to the side surface of the reservoir part.SELECTED DRAWING: Figure 15
【課題】上部物体を下部構造に設置する際に、実用性を高くし、かつコストを低減することができる施工方法を提供する。【解決手段】上部物体と、前記上部物体が設置されるグラウト材と、前記グラウト材を貯留する貯留部を備えた下部構造と、を有する上部物体の設置構造の施工方法であって、前記貯留部の底面にグラウト材を打設するグラウト材打設ステップと、前記上部物体の下面で前記グラウト材を下方に押圧することで、前記上部物体の下面と前記貯留部の底面との間に前記グラウト材が充填される底部グラウト材充填ステップと、前記グラウト材が前記貯留部の側面まで流入することで、前記貯留部において前記上部物体の下面以上に前記グラウト材が充填される側部グラウト材充填ステップと、を行う上部物体の設置構造の施工方法である。【選択図】図15
CONSTRUCTION METHOD FOR UPPER OBJECT INSTALLATION STRUCTURE, AND THE INSTALLATION STRUCTURE
上部物体の設置構造の施工方法及び上部物体の設置構造
TSUTSUMI YOSHIHIRO (author) / SAKAI TOSHIMITSU (author)
2024-10-07
Patent
Electronic Resource
Japanese
INSTALLATION STRUCTURE OF INSTALLATION OBJECT, AND INSTALLATION METHOD OF INSTALLATION OBJECT
European Patent Office | 2023
|UPPER MEMBER INSTALLATION STRUCTURE, AND UPPER MEMBER INSTALLATION METHOD
European Patent Office | 2024
|INSTALLATION METHOD AND INSTALLATION STRUCTURE FOR DRIFTWOOD TRAP CONSTRUCTION
European Patent Office | 2020
|