A platform for research: civil engineering, architecture and urbanism
WORK SCAFFOLDING
To provide a work scaffolding that can improve its strength.SOLUTION: Provided is a work scaffolding 100 installed on a concrete or mortar crest A including a plurality of stages of work scaffolding units 10A to 10C each including a plurality of front supports 11 spaced apart in the left-right direction and supported by the crest A, a plurality of rear supports 12 spaced apart the same as the front supports 11 and longer than the front supports 11, a front beam member 13 connecting the front supports 11 to each other, a rear beam member 14 connecting the rear supports to each other, front and rear members 15 connecting the front supports 11 to the rear supports 12, a joist member 16 whose middle part is supported by the front beam member 13 and whose rear part is supported by the rear beam member 14 and whose front end part is supported by the crest A via a stress transfer member 20, and a work floor member 17 laid on the joist member 16. The rear supports 12 of the work scaffolding units 10A, 10B on the second or higher level are supported by the joist members 16 of the work scaffolding units 10B, 10C on the next lower level.SELECTED DRAWING: Figure 1
【課題】強度向上を図ることが可能な作業足場を提供する。【解決手段】コンクリート造又はモルタル造の法枠Aに設置される作業足場100であって、左右方向に間隔を隔てて設けられ、法枠Aに支持される複数の前側支柱11と、前側支柱11と同じ間隔を隔てて設けられ、前側支柱11より長い複数の後側支柱12と、前側支柱11同士を連結する前側梁部材13と、後側支柱同士を連結する後側梁部材14と、前側支柱11と後側支柱12とを連結する前後部材15と、前側梁部材13に中間部を支持され、後側梁部材14に後部を支持され、応力伝達部材20を介して法枠Aに前端部が支持される根太部材16と、根太部材16上に敷設される作業床部材17とをそれぞれが備える、複数段の作業足場ユニット10A~10Cを有する。2段目以上の作業足場ユニット10A,10Bの後側支柱12は、1つ下段の作業足場ユニット10B,10Cの根太部材16に支持される。【選択図】図1
WORK SCAFFOLDING
To provide a work scaffolding that can improve its strength.SOLUTION: Provided is a work scaffolding 100 installed on a concrete or mortar crest A including a plurality of stages of work scaffolding units 10A to 10C each including a plurality of front supports 11 spaced apart in the left-right direction and supported by the crest A, a plurality of rear supports 12 spaced apart the same as the front supports 11 and longer than the front supports 11, a front beam member 13 connecting the front supports 11 to each other, a rear beam member 14 connecting the rear supports to each other, front and rear members 15 connecting the front supports 11 to the rear supports 12, a joist member 16 whose middle part is supported by the front beam member 13 and whose rear part is supported by the rear beam member 14 and whose front end part is supported by the crest A via a stress transfer member 20, and a work floor member 17 laid on the joist member 16. The rear supports 12 of the work scaffolding units 10A, 10B on the second or higher level are supported by the joist members 16 of the work scaffolding units 10B, 10C on the next lower level.SELECTED DRAWING: Figure 1
【課題】強度向上を図ることが可能な作業足場を提供する。【解決手段】コンクリート造又はモルタル造の法枠Aに設置される作業足場100であって、左右方向に間隔を隔てて設けられ、法枠Aに支持される複数の前側支柱11と、前側支柱11と同じ間隔を隔てて設けられ、前側支柱11より長い複数の後側支柱12と、前側支柱11同士を連結する前側梁部材13と、後側支柱同士を連結する後側梁部材14と、前側支柱11と後側支柱12とを連結する前後部材15と、前側梁部材13に中間部を支持され、後側梁部材14に後部を支持され、応力伝達部材20を介して法枠Aに前端部が支持される根太部材16と、根太部材16上に敷設される作業床部材17とをそれぞれが備える、複数段の作業足場ユニット10A~10Cを有する。2段目以上の作業足場ユニット10A,10Bの後側支柱12は、1つ下段の作業足場ユニット10B,10Cの根太部材16に支持される。【選択図】図1
WORK SCAFFOLDING
作業足場
SONODA YOSUKE (author) / KANAYAMA SUEFUMI (author)
2024-10-10
Patent
Electronic Resource
Japanese
Smart work scaffolding system and abnormal detection method of smart work scaffolding system
European Patent Office | 2022