A platform for research: civil engineering, architecture and urbanism
DISCONNECTION SYSTEM
To provide a disconnection system capable of improving efficiency of installation work of a heavy object.SOLUTION: A communication mode is set to a mixed communication mode when a disconnection unit 1 is located in a splash zone, so that ultrasonic command using underwater wireless communication is preferentially transmitted from a shipboard unit 50 to a disconnection unit 1. When there is no response from the disconnection unit 1 for a prescribed time, it is switched to ultrasonic command using underwater wireless communication, so that an opening/closing state of a release hook of the disconnection unit 1 can be reliably acquired, or the release hook can be opened by opening an electric actuator 32 of the disconnection unit 1, thereby improving efficiency of installation work of a heavy object such as a wave-dissipating block.SELECTED DRAWING: Figure 3
【課題】重量物の据付工事を能率化することが可能な切離しシステムを提供する。【解決手段】切離しユニット1が飛沫帯に位置するとき混合通信モードに設定することで、船上ユニット50から切離しユニット1へ水中無線通信を用いた超音波指令が優先的に送信され、切離しユニット1からの応答が一定時間無かったとき、水中無線通信を用いた超音波指令に切り替えるので、確実に切離しユニット1のリリースフックの開閉状態を知る、又は切離しユニット1の電動アクチュエータ32を開動作させてリリースフックを開放することが可能であり、消波ブロック等の重量物の据付工事を能率化することができる。【選択図】図3
DISCONNECTION SYSTEM
To provide a disconnection system capable of improving efficiency of installation work of a heavy object.SOLUTION: A communication mode is set to a mixed communication mode when a disconnection unit 1 is located in a splash zone, so that ultrasonic command using underwater wireless communication is preferentially transmitted from a shipboard unit 50 to a disconnection unit 1. When there is no response from the disconnection unit 1 for a prescribed time, it is switched to ultrasonic command using underwater wireless communication, so that an opening/closing state of a release hook of the disconnection unit 1 can be reliably acquired, or the release hook can be opened by opening an electric actuator 32 of the disconnection unit 1, thereby improving efficiency of installation work of a heavy object such as a wave-dissipating block.SELECTED DRAWING: Figure 3
【課題】重量物の据付工事を能率化することが可能な切離しシステムを提供する。【解決手段】切離しユニット1が飛沫帯に位置するとき混合通信モードに設定することで、船上ユニット50から切離しユニット1へ水中無線通信を用いた超音波指令が優先的に送信され、切離しユニット1からの応答が一定時間無かったとき、水中無線通信を用いた超音波指令に切り替えるので、確実に切離しユニット1のリリースフックの開閉状態を知る、又は切離しユニット1の電動アクチュエータ32を開動作させてリリースフックを開放することが可能であり、消波ブロック等の重量物の据付工事を能率化することができる。【選択図】図3
DISCONNECTION SYSTEM
切離しシステム
NOBETA ATSUHIKO (author) / NAKAGAWA TETSUYA (author) / KUSAKARI SHIGENAO (author)
2024-10-15
Patent
Electronic Resource
Japanese
Online Contents | 2009
|