TEMPORARY PIER CONSTRUCTION METHOD
To provide a temporary pier construction method which can perform construction with a wider pile pitch than before, reduce the number of support piles required for constructing the temporary pier, and improve construction costs and period.SOLUTION: A part of an overhanging main girder 30A is protruded across in the extension direction of the temporary pier from the support position of a support pile 20 to form an overhanging portion 38, and an extension overhanging main girder 30B, which is supported by the end part of the protruding portion 38 of the overhanging main girder 30A and a support pile 20b, is hung across, a slab 40 is laid on the extension overhanging main girder 30B to form a superstructure protruding in the extension direction of the temporary pier, and in a state where the joint position between the overhanging main girders 30A, 30B and the support position of the overhanging main girder 30A by the support pile 20a are shifted in the bridge axis direction, the end part of the existing overhanging main girder 30A and the end of the extension overhanging main girder 30B are joined together to provide continuity.SELECTED DRAWING: Figure 2
【課題】従来と比べて杭ピッチを拡げて施工できて、仮桟橋の施工に要する支持杭の本数を削減できて工費および工期を改善できる、仮桟橋の構築方法を提供すること。【解決手段】支持杭20の支持位置に対して張出主桁30Aの一部を仮桟橋の延長方向に向けて張り出して張出部38を形成し、張出主桁30Aの張出部38の端部と、支持杭20bとに支持させて延長用の張出主桁30Bを掛け渡し、延長用の張出主桁30B上に床板40を敷設して仮桟橋の延長方向に上部工を張り出して形成し、張出主桁30A,30B同士の接合位置と支持杭20aによる張出主桁30Aの支持位置とを橋軸方向にずらした状態で、既設の張出主桁30Aの端部と延長用の張出主桁30Bの端部との間を一体に接合して連続性を持たせた。【選択図】図2
TEMPORARY PIER CONSTRUCTION METHOD
To provide a temporary pier construction method which can perform construction with a wider pile pitch than before, reduce the number of support piles required for constructing the temporary pier, and improve construction costs and period.SOLUTION: A part of an overhanging main girder 30A is protruded across in the extension direction of the temporary pier from the support position of a support pile 20 to form an overhanging portion 38, and an extension overhanging main girder 30B, which is supported by the end part of the protruding portion 38 of the overhanging main girder 30A and a support pile 20b, is hung across, a slab 40 is laid on the extension overhanging main girder 30B to form a superstructure protruding in the extension direction of the temporary pier, and in a state where the joint position between the overhanging main girders 30A, 30B and the support position of the overhanging main girder 30A by the support pile 20a are shifted in the bridge axis direction, the end part of the existing overhanging main girder 30A and the end of the extension overhanging main girder 30B are joined together to provide continuity.SELECTED DRAWING: Figure 2
【課題】従来と比べて杭ピッチを拡げて施工できて、仮桟橋の施工に要する支持杭の本数を削減できて工費および工期を改善できる、仮桟橋の構築方法を提供すること。【解決手段】支持杭20の支持位置に対して張出主桁30Aの一部を仮桟橋の延長方向に向けて張り出して張出部38を形成し、張出主桁30Aの張出部38の端部と、支持杭20bとに支持させて延長用の張出主桁30Bを掛け渡し、延長用の張出主桁30B上に床板40を敷設して仮桟橋の延長方向に上部工を張り出して形成し、張出主桁30A,30B同士の接合位置と支持杭20aによる張出主桁30Aの支持位置とを橋軸方向にずらした状態で、既設の張出主桁30Aの端部と延長用の張出主桁30Bの端部との間を一体に接合して連続性を持たせた。【選択図】図2
TEMPORARY PIER CONSTRUCTION METHOD
仮桟橋の構築方法
MATSUDA ISAO (author) / KUBOTSU NAOTO (author) / HONDA SHUICHI (author) / MATSUNAGA YUSUKE (author)
2024-11-14
Patent
Electronic Resource
Japanese
PIER TEMPORARY SHOE STRUCTURE AND OVERHANG CONSTRUCTION METHOD USING PIER TEMPORARY SHOE
European Patent Office | 2017
|Temporary consolidation construction method for pier top
European Patent Office | 2022
|