METHOD FOR SLOPE REINFORCEMENT CONSTRUCTION USING THE GROUND IMPROVEMENT PRODUCT
The present invention does not need an additional facility to block a road or to reinforce a slope during construction as the slope is restored and/or reinforced by paving ground improvement products using a top down method after excavation in the slope, and can restore and reinforce the slope to an environment matched with a peripheral nature environment as a structure is not exposed by restoring the slope using an in-ground type. The present invention comprises: a top down section setting step of partitioning a collapsed or scoured slope to be worked into one or more sections; a construction step of successively constructing from an upper section to a lower section among the sections set in the top down section setting step, and constructing a retaining wall by deciding a start spot and an end spot of the excavation so as to be closed with a gutter and a drainage close to the working slope, forming an excavation groove recessed from the ground in the selected section, and filling the excavation groove with a ground improvement product mixture; and a planting step of planting plants on the surface of the retaining wall after the construction step.
본 발명은 사면에서 터파기후 표층 개량재를 탑 다운(TOP DOWN) 방식으로 포설하여 사면을 복원 및/또는 보강함에 따라 시공중에 도로 차단 또는 사면을 보강할 수 있는 별도의 시설물이 필요치 않고, 지중식으로 사면을 복원함에 따라 구조물이 노출되지 않아 주변 자연환경에 일치되는 환경으로 사면을 복원 및 보강할 수 있다.
METHOD FOR SLOPE REINFORCEMENT CONSTRUCTION USING THE GROUND IMPROVEMENT PRODUCT
The present invention does not need an additional facility to block a road or to reinforce a slope during construction as the slope is restored and/or reinforced by paving ground improvement products using a top down method after excavation in the slope, and can restore and reinforce the slope to an environment matched with a peripheral nature environment as a structure is not exposed by restoring the slope using an in-ground type. The present invention comprises: a top down section setting step of partitioning a collapsed or scoured slope to be worked into one or more sections; a construction step of successively constructing from an upper section to a lower section among the sections set in the top down section setting step, and constructing a retaining wall by deciding a start spot and an end spot of the excavation so as to be closed with a gutter and a drainage close to the working slope, forming an excavation groove recessed from the ground in the selected section, and filling the excavation groove with a ground improvement product mixture; and a planting step of planting plants on the surface of the retaining wall after the construction step.
본 발명은 사면에서 터파기후 표층 개량재를 탑 다운(TOP DOWN) 방식으로 포설하여 사면을 복원 및/또는 보강함에 따라 시공중에 도로 차단 또는 사면을 보강할 수 있는 별도의 시설물이 필요치 않고, 지중식으로 사면을 복원함에 따라 구조물이 노출되지 않아 주변 자연환경에 일치되는 환경으로 사면을 복원 및 보강할 수 있다.
METHOD FOR SLOPE REINFORCEMENT CONSTRUCTION USING THE GROUND IMPROVEMENT PRODUCT
표층개량재를 이용한 사면 보강 옹벽공법
PARK HEUNG SOO (author) / PARK SO MIN (author)
2015-06-10
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Slope reinforcement construction method using vegetation soil and slope reinforcement construction
European Patent Office | 2021
|European Patent Office | 2019
|Mehtod for slope reinforcement construction using surface layer improvement meterial
European Patent Office | 2020
|Slope Reinforcement Concrete Anchor Block and Slope Reinforcement Construction Method Using Same
European Patent Office | 2019
|