A platform for research: civil engineering, architecture and urbanism
MANUFACTURING METHOD OF PRESTRESSED STEEL-CONCRETE COMPOSITE BEAM
The present invention relates to a method to construct a prestressed steel composite beam, formed by the composition of structural steel and prestressed concrete, and more specifically, to a method to construct a prestressed steel composite beam, capable of effectively applying compression by prestressing, required for lower concrete combined with a lower part of the structural steel. The method includes: a beam manufacturing step of manufacturing a first beam comprising an upper flange and a web part and having a longitudinal shape and a second beam having a reinforced concrete material and placed under the first beam to be structurally combined with the first beam; a strand assembly reclaiming step of reclaiming a strand assembly, manufactured with a linear fixing part, inside the second beam in the longitudinal direction of the second beam by combining the strand, of which one end part has a predetermined length manufactured in a non-attachment strand shape and the remaining length manufactured in an attachment strand shape, with a deformed bar extending in one direction and including protrusions formed on the surface of the attachment strand in the beam manufacturing step, wherein the linear fixing part is placed between end and middle parts of the second beam in order to be fixed in the second beam without an additional fixing device, the strand in the non-attachment strand shape is placed in the opposite side to the end part of the second beam, and the end part of the non-attachment strand shape is reclaimed to be exposed to the outside of the second beam; and a prestressing step of applying prestress to the beam by settling the concrete of the second beam in the fixing device in the end part while applying tensile force to the strand assembly, reclaimed in the strand assembly reclaiming step, after the concrete of the second beam is hardened to have predetermined hardness.
본 발명은 강재와 프리스트레스트 콘크리트의 합성구조로 이루어진 프리스트레스트 강합성 빔의 시공방법에 관한 것으로서 더욱 상세하게는 강재의 하부에 결합하는 하부 콘크리트에 요구되는 압축 프리스트레스를 효과적으로 도입할 수 있는 프리스트레스트 강합성 빔의 시공방법에 관한 것이다. 본 발명은, 상부플랜지와 복부를 포함하여 구성되며 일방향으로 긴 강재의 제1빔과 상기 제1빔의 하부에 배치되어 상기 제1빔과 구조적으로 합성되는 철근 콘크리트 재질의 제2빔을 제작하는 빔 제작단계; 상기 빔 제작단계에서 상기 제2빔의 내부에 일단부의 일정길이는 비부착 강연선의 형태로 제작되고 나머지는 부착 강연선의 형태로 제작되는 강연선과 상기 부착 강연선에 표면에 돌기가 형성되고 한 방향으로 긴 이형봉강을 결합하여 선형 고정정착부로 제작되는 강연선 조립체를 상기 제2빔의 길이 방향으로 매립하되, 상기 선형 고정정착부는 상기 제2빔의 내부에서 별도의 내부 고정정착장치 없이 정착되도록 상기 제2빔의 중간과 일단부 사이의 내부에 배치하고, 비부착 강연선 형태의 강연선은 제2빔의 일단부 맞은편 쪽에 배치하며, 비부착 강연선 형태의 단부는 제2빔의 외부로 노출되도록 매립하는 강연선 조립체 매립단계; 상기 제2빔의 콘크리트가 일정강도로 경화된 이후에 상기 강연선 조립체 매립단계에서 매립된 강연선 조립체에 인장력을 가한 상태로 단부의 정착장치에 정착시켜 상기 빔에 프리스트레스가 작용하도록 하는 프리스트레싱 단계;를 포함하는 것을 특징으로 하는 프리스트레스트 강합성 빔의 시공방법을 제공한다.
MANUFACTURING METHOD OF PRESTRESSED STEEL-CONCRETE COMPOSITE BEAM
The present invention relates to a method to construct a prestressed steel composite beam, formed by the composition of structural steel and prestressed concrete, and more specifically, to a method to construct a prestressed steel composite beam, capable of effectively applying compression by prestressing, required for lower concrete combined with a lower part of the structural steel. The method includes: a beam manufacturing step of manufacturing a first beam comprising an upper flange and a web part and having a longitudinal shape and a second beam having a reinforced concrete material and placed under the first beam to be structurally combined with the first beam; a strand assembly reclaiming step of reclaiming a strand assembly, manufactured with a linear fixing part, inside the second beam in the longitudinal direction of the second beam by combining the strand, of which one end part has a predetermined length manufactured in a non-attachment strand shape and the remaining length manufactured in an attachment strand shape, with a deformed bar extending in one direction and including protrusions formed on the surface of the attachment strand in the beam manufacturing step, wherein the linear fixing part is placed between end and middle parts of the second beam in order to be fixed in the second beam without an additional fixing device, the strand in the non-attachment strand shape is placed in the opposite side to the end part of the second beam, and the end part of the non-attachment strand shape is reclaimed to be exposed to the outside of the second beam; and a prestressing step of applying prestress to the beam by settling the concrete of the second beam in the fixing device in the end part while applying tensile force to the strand assembly, reclaimed in the strand assembly reclaiming step, after the concrete of the second beam is hardened to have predetermined hardness.
본 발명은 강재와 프리스트레스트 콘크리트의 합성구조로 이루어진 프리스트레스트 강합성 빔의 시공방법에 관한 것으로서 더욱 상세하게는 강재의 하부에 결합하는 하부 콘크리트에 요구되는 압축 프리스트레스를 효과적으로 도입할 수 있는 프리스트레스트 강합성 빔의 시공방법에 관한 것이다. 본 발명은, 상부플랜지와 복부를 포함하여 구성되며 일방향으로 긴 강재의 제1빔과 상기 제1빔의 하부에 배치되어 상기 제1빔과 구조적으로 합성되는 철근 콘크리트 재질의 제2빔을 제작하는 빔 제작단계; 상기 빔 제작단계에서 상기 제2빔의 내부에 일단부의 일정길이는 비부착 강연선의 형태로 제작되고 나머지는 부착 강연선의 형태로 제작되는 강연선과 상기 부착 강연선에 표면에 돌기가 형성되고 한 방향으로 긴 이형봉강을 결합하여 선형 고정정착부로 제작되는 강연선 조립체를 상기 제2빔의 길이 방향으로 매립하되, 상기 선형 고정정착부는 상기 제2빔의 내부에서 별도의 내부 고정정착장치 없이 정착되도록 상기 제2빔의 중간과 일단부 사이의 내부에 배치하고, 비부착 강연선 형태의 강연선은 제2빔의 일단부 맞은편 쪽에 배치하며, 비부착 강연선 형태의 단부는 제2빔의 외부로 노출되도록 매립하는 강연선 조립체 매립단계; 상기 제2빔의 콘크리트가 일정강도로 경화된 이후에 상기 강연선 조립체 매립단계에서 매립된 강연선 조립체에 인장력을 가한 상태로 단부의 정착장치에 정착시켜 상기 빔에 프리스트레스가 작용하도록 하는 프리스트레싱 단계;를 포함하는 것을 특징으로 하는 프리스트레스트 강합성 빔의 시공방법을 제공한다.
MANUFACTURING METHOD OF PRESTRESSED STEEL-CONCRETE COMPOSITE BEAM
프리스트레스트 강합성 빔의 시공방법
OH DOO HWAN (author)
2015-12-09
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Flexural Stiffness of Steel-Prestressed Concrete Composite Beam
British Library Online Contents | 2009
|Flexural stiffness of steel-prestressed concrete composite beam
Tema Archive | 2009
|Flexural Stiffness of Steel-Prestressed Concrete Composite Beam
British Library Conference Proceedings | 2009
|Flexural Stiffness of Steel-Prestressed Concrete Composite Beam
Trans Tech Publications | 2008
|