RIVER CROSSING BURIED PIPELINE CONSTRUCTION AND PIPELINE LAYING METHOD USING THE SAME
An aspect of the present invention provides a buried pipeline structure crossing a river and a pipeline laying method using the same, enabling the ground to be excavated and recovered within the day for reducing a construction period, wherein the structure comprises: a pair of first pipelines which are laid at lower ends of slopes formed on both sides of the river respectively and into which a cable are inserted; a pair of second pipelines connected to the first pipelines and laid at lower ends of riversides formed between the river and the slopes to pass the cables through the lower ends of the riversides; and a third pipeline having both ends connected to the second pipelines and laid at a lower end of the river to make the cable, inserted into one of the first pipelines, cross the lower end of the river and arrive at the other of the first pipelines positioned at the opposite side.
본 발명의 일 측면에 따른 하천횡단 관로 매설구조물 및 이를 이용한 관로 매설방법은 하천의 양측에 형성되는 법면 하단에 각각 매설되어 케이블이 삽입되는 한 쌍의 제1관로와, 한 쌍의 상기 제1관로와 각각 연결되고 하천과 법면 사이에 형성되는 둔치 하단에 매설되어 케이블이 둔치 하단을 지나가도록 하는 한 쌍의 제2관로와, 양단이 한 쌍의 상기 제2관로와 연결되고 하천 하단에 매설되어 상기 제1관로를 통해 삽입된 케이블이 하천 하단을 횡단하여 반대편의 또 다른 상기 제1관로에 도달하도록 하는 제3관로를 구비할 수 있다.
RIVER CROSSING BURIED PIPELINE CONSTRUCTION AND PIPELINE LAYING METHOD USING THE SAME
An aspect of the present invention provides a buried pipeline structure crossing a river and a pipeline laying method using the same, enabling the ground to be excavated and recovered within the day for reducing a construction period, wherein the structure comprises: a pair of first pipelines which are laid at lower ends of slopes formed on both sides of the river respectively and into which a cable are inserted; a pair of second pipelines connected to the first pipelines and laid at lower ends of riversides formed between the river and the slopes to pass the cables through the lower ends of the riversides; and a third pipeline having both ends connected to the second pipelines and laid at a lower end of the river to make the cable, inserted into one of the first pipelines, cross the lower end of the river and arrive at the other of the first pipelines positioned at the opposite side.
본 발명의 일 측면에 따른 하천횡단 관로 매설구조물 및 이를 이용한 관로 매설방법은 하천의 양측에 형성되는 법면 하단에 각각 매설되어 케이블이 삽입되는 한 쌍의 제1관로와, 한 쌍의 상기 제1관로와 각각 연결되고 하천과 법면 사이에 형성되는 둔치 하단에 매설되어 케이블이 둔치 하단을 지나가도록 하는 한 쌍의 제2관로와, 양단이 한 쌍의 상기 제2관로와 연결되고 하천 하단에 매설되어 상기 제1관로를 통해 삽입된 케이블이 하천 하단을 횡단하여 반대편의 또 다른 상기 제1관로에 도달하도록 하는 제3관로를 구비할 수 있다.
RIVER CROSSING BURIED PIPELINE CONSTRUCTION AND PIPELINE LAYING METHOD USING THE SAME
하천횡단 관로 매설구조물 및 이를 이용한 관로 매설방법
YU JO UNG (author) / CHA EUNG SEOP (author) / PARK JONG SEUNG (author)
2016-07-07
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Culvert crossing buried pipeline construction and pipeline laying method using the same
European Patent Office | 2016
|Pipeline laying device and construction method of pipeline laying
European Patent Office | 2020
|Buried Seafloor Pipeline Crossing a Fault
IEEE | 2020
|Seismic responses of buried pipeline crossing fault
British Library Online Contents | 2007
|Pipeline laying apparatus and method for crossing steep terrain