DOUBLE LINE RETAINING WALL SELF-RELIANCE COMPOSITE WALL CONSTRUCTION METHOD FOR REINFORCEMENT PILE WALL
The present invention provides a construction method for a double line retaining wall self-standing composite wall in which a column is reinforced, which forms a column type wall of two rows on a weak ground in which the depth of a support layer such as a coast dredging reclaimed land is deep and a soil pressure is large. The method for a double line retaining wall self-standing composite wall forms a composite soil wall by constructing a middle reinforcing partition wall of a plain concrete method between the column type walls and supports the soil pressure by integrating a support beam and a bracing in the upper part. According to a proper embodiment of the present invention, the construction method for a double line retaining wall self-standing composite wall includes: (a) a step of designating a rear surface and an excavation surface around a reference line (CL) and constructing a first rear row retaining walls in which multiple cast-in-place (CIP) piles or multiple soil cement walls (SCW) are adjacent to each other, wherein the SCW comprising an H-pile as a core material after the rear surface is bored based on the reference line (CL); (b) a step of constructing a second front row retaining wall in which the multiple SCWs or the CIPs are adjacent to each other, wherein the H-pile is formed as the core material on the excavation surface based on the reference line (CL) to be parallel with the first rear row retaining wall at fixed intervals; (c) a step of constructing a middle reinforcing partition wall by forming the retaining wall with plain soil cement or injecting grouting at the fixed intervals in a direction orthogonal to a column direction between the first rear row retaining wall and the second front row retaining wall parallel with each other; (d) a step of installing a waling bracket at the upper end of the H-pile and individually bonding a support beam between walings on both sides after individually mounting the walings onto the waling bracket; and (e) a step of excavating the excavation surface to an excavation target depth.
본 발명은 해안 준설 매립지 등의 지지층의 심도가 깊고 토압이 큰 연약지반 상에서 2열의 주열벽을 형성하고, 이들 주열벽의 사이에 무근 방식의 중간 보강격벽을 시공하여 합성 소일벽을 형성한 후, 상부에 지지보와 브레이싱으로 일체화시켜 토압을 지지하도록 하는 주열 보강된 2열 흙막이 자립 합성벽의 시공방법을 제공한다. 본 발명의 적절한 실시 형태에 따르면, (a) 기준선(CL)을 중심으로 배면과 굴착면으로 지정하고, 기준선(CL)을 중심으로 배면에 천공 후 H파일이 심재로 구성되는 복수의 SCW(Soil Cement Wall) 또는 CIP(Cast In Place Pile)로 서로 연접된 제1 후열 주열벽을 시공하는 단계; (b) 기준선(CL)을 중심으로 굴착면에 제1 후열 주열벽과 일정간격 이격되어 평행하도록 H파일이 심재로 구성되는 복수의 SCW(Soil Cement Wall) 또는 CIP(Cast In Place Pile)이 서로 연접되게 형성된 제2 전열 주열벽을 시공하는 단계; (c) 서로 평행한 제1 후열 주열벽과 제2 전열 주열벽 사이에 그 주열 방향과 직교되는 방향으로 일정간격마다 제트 그라우팅하거나 무근 소일시멘트로 주열벽을 형성시켜 중간 보강격벽을 시공하는 단계와; (d) 상기 H파일의 상단부에 띠장 브라켓을 설치하고, 띠장을 띠장 브라켓에 각기 거치한 후 양쪽의 띠장 사이에 지지보를 각각 접합시켜 놓는 단계; 및 (e) 굴착면을 터파기 계획고까지 굴착하는 단계;를 포함하여 이루어지는 것을 특징으로 한다.
DOUBLE LINE RETAINING WALL SELF-RELIANCE COMPOSITE WALL CONSTRUCTION METHOD FOR REINFORCEMENT PILE WALL
The present invention provides a construction method for a double line retaining wall self-standing composite wall in which a column is reinforced, which forms a column type wall of two rows on a weak ground in which the depth of a support layer such as a coast dredging reclaimed land is deep and a soil pressure is large. The method for a double line retaining wall self-standing composite wall forms a composite soil wall by constructing a middle reinforcing partition wall of a plain concrete method between the column type walls and supports the soil pressure by integrating a support beam and a bracing in the upper part. According to a proper embodiment of the present invention, the construction method for a double line retaining wall self-standing composite wall includes: (a) a step of designating a rear surface and an excavation surface around a reference line (CL) and constructing a first rear row retaining walls in which multiple cast-in-place (CIP) piles or multiple soil cement walls (SCW) are adjacent to each other, wherein the SCW comprising an H-pile as a core material after the rear surface is bored based on the reference line (CL); (b) a step of constructing a second front row retaining wall in which the multiple SCWs or the CIPs are adjacent to each other, wherein the H-pile is formed as the core material on the excavation surface based on the reference line (CL) to be parallel with the first rear row retaining wall at fixed intervals; (c) a step of constructing a middle reinforcing partition wall by forming the retaining wall with plain soil cement or injecting grouting at the fixed intervals in a direction orthogonal to a column direction between the first rear row retaining wall and the second front row retaining wall parallel with each other; (d) a step of installing a waling bracket at the upper end of the H-pile and individually bonding a support beam between walings on both sides after individually mounting the walings onto the waling bracket; and (e) a step of excavating the excavation surface to an excavation target depth.
본 발명은 해안 준설 매립지 등의 지지층의 심도가 깊고 토압이 큰 연약지반 상에서 2열의 주열벽을 형성하고, 이들 주열벽의 사이에 무근 방식의 중간 보강격벽을 시공하여 합성 소일벽을 형성한 후, 상부에 지지보와 브레이싱으로 일체화시켜 토압을 지지하도록 하는 주열 보강된 2열 흙막이 자립 합성벽의 시공방법을 제공한다. 본 발명의 적절한 실시 형태에 따르면, (a) 기준선(CL)을 중심으로 배면과 굴착면으로 지정하고, 기준선(CL)을 중심으로 배면에 천공 후 H파일이 심재로 구성되는 복수의 SCW(Soil Cement Wall) 또는 CIP(Cast In Place Pile)로 서로 연접된 제1 후열 주열벽을 시공하는 단계; (b) 기준선(CL)을 중심으로 굴착면에 제1 후열 주열벽과 일정간격 이격되어 평행하도록 H파일이 심재로 구성되는 복수의 SCW(Soil Cement Wall) 또는 CIP(Cast In Place Pile)이 서로 연접되게 형성된 제2 전열 주열벽을 시공하는 단계; (c) 서로 평행한 제1 후열 주열벽과 제2 전열 주열벽 사이에 그 주열 방향과 직교되는 방향으로 일정간격마다 제트 그라우팅하거나 무근 소일시멘트로 주열벽을 형성시켜 중간 보강격벽을 시공하는 단계와; (d) 상기 H파일의 상단부에 띠장 브라켓을 설치하고, 띠장을 띠장 브라켓에 각기 거치한 후 양쪽의 띠장 사이에 지지보를 각각 접합시켜 놓는 단계; 및 (e) 굴착면을 터파기 계획고까지 굴착하는 단계;를 포함하여 이루어지는 것을 특징으로 한다.
DOUBLE LINE RETAINING WALL SELF-RELIANCE COMPOSITE WALL CONSTRUCTION METHOD FOR REINFORCEMENT PILE WALL
주열 보강된 2열 흙막이 자립 합성벽의 시공방법
KIM HYO SOOK (author) / KIM IN CHOEL (author)
2016-07-20
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
European Patent Office | 2021
|DOUBLE PILE SELF-RELIANCE RETAINING WALL CONSTRUCTION METHOD
European Patent Office | 2022
DOUBLE PILE SELF-RELIANCE RETAINING WALL CONSTRUCTION METHOD
European Patent Office | 2022
|Self reliance pile and Self reliance retaining wall construction method using the same
European Patent Office | 2019
|