A platform for research: civil engineering, architecture and urbanism
METHOD FOR CONSTRUCTING INTEGRAL ABUTMENT BRIDGE
The present invention relates to a method for constructing an integral abutment bridge. According to the present invention, the method for constructing an integral abutment bridge includes: a back banking step of banking soil on the back of an abutment to a position separated from the abutment; a foundation pile installation step of installing a foundation pile which is high, on the lower side of the abutment; a reinforcing retaining wall installing step of installing a reinforcing retaining wall using an embankment and crushed stone between the back banking surface and a front surface of the foundation pile; an abutment installing step of installing the abutment which is lower, on the upper part of the foundation pile; a back filling step of filling the back of the abutment by banking the soil and a non-compactness gabion; a bridge girder installing step of installing a bridge girder on the upper side of the abutment; and a paving step of paving the upper side of the bridge. Therefore, according to the method for constructing an integral abutment bridge, the foundation pile, the abutment, the bridge girder, and a connection slab are integrated. Also, a soil structure on the front surface and the back surface of the abutment is used as a part of an abutment structure. So, the abutment moves in accordance with expansion and contraction of the bridge girder, and the expansion and the contraction of the bridge girder is bore. Also, method for constructing an integral abutment bridge enables the bridge girder to efficiently correspond to an outer load such as an earthquake.
본 발명은, 일체식 교대 교량 시공방법에 있어서, 상기 교대의 배면에 상기 교대에서 이격된 위치까지 성토하는 배면 성토 단계와; 상기 교대의 하측에 높이가 높은 기초파일을 설치하는 기초파일 설치 단계와; 상기 배면 성토면과 상기 기초파일의 전면 사이에 성토 및 쇄석을 사용한 보강토옹벽을 설치하는 보강토옹벽 설치 단계와; 상기 기초파일의 상부에 높이가 낮은 교대를 설치하는 교대 설치 단계와; 상기 교대의 배면에 성토 및 무다짐 돌망태를 사용한 배면 채움 단계와; 상기 교대의 상측에 교량거더를 설치하는 교량거더 설치 단계와; 상기 교량의 상측을 포장하는 포장 단계를; 포함하는 일체식 교대 교량 시공방법에 관한 것이다. 본 발명을 통해, 기초파일, 교대, 교량거더, 및 접속슬래브를 일체화하고, 교대의 전면과 배면의 흙구조물을 교대 구조의 일부로 이용함으로써, 교량거더의 신축에 따라 교대가 함께 거동하여 교량거더의 신축이 수용되고, 지진 등 외부하중에 효율적으로 대응 가능한 효과를 제공할 수 있다.
METHOD FOR CONSTRUCTING INTEGRAL ABUTMENT BRIDGE
The present invention relates to a method for constructing an integral abutment bridge. According to the present invention, the method for constructing an integral abutment bridge includes: a back banking step of banking soil on the back of an abutment to a position separated from the abutment; a foundation pile installation step of installing a foundation pile which is high, on the lower side of the abutment; a reinforcing retaining wall installing step of installing a reinforcing retaining wall using an embankment and crushed stone between the back banking surface and a front surface of the foundation pile; an abutment installing step of installing the abutment which is lower, on the upper part of the foundation pile; a back filling step of filling the back of the abutment by banking the soil and a non-compactness gabion; a bridge girder installing step of installing a bridge girder on the upper side of the abutment; and a paving step of paving the upper side of the bridge. Therefore, according to the method for constructing an integral abutment bridge, the foundation pile, the abutment, the bridge girder, and a connection slab are integrated. Also, a soil structure on the front surface and the back surface of the abutment is used as a part of an abutment structure. So, the abutment moves in accordance with expansion and contraction of the bridge girder, and the expansion and the contraction of the bridge girder is bore. Also, method for constructing an integral abutment bridge enables the bridge girder to efficiently correspond to an outer load such as an earthquake.
본 발명은, 일체식 교대 교량 시공방법에 있어서, 상기 교대의 배면에 상기 교대에서 이격된 위치까지 성토하는 배면 성토 단계와; 상기 교대의 하측에 높이가 높은 기초파일을 설치하는 기초파일 설치 단계와; 상기 배면 성토면과 상기 기초파일의 전면 사이에 성토 및 쇄석을 사용한 보강토옹벽을 설치하는 보강토옹벽 설치 단계와; 상기 기초파일의 상부에 높이가 낮은 교대를 설치하는 교대 설치 단계와; 상기 교대의 배면에 성토 및 무다짐 돌망태를 사용한 배면 채움 단계와; 상기 교대의 상측에 교량거더를 설치하는 교량거더 설치 단계와; 상기 교량의 상측을 포장하는 포장 단계를; 포함하는 일체식 교대 교량 시공방법에 관한 것이다. 본 발명을 통해, 기초파일, 교대, 교량거더, 및 접속슬래브를 일체화하고, 교대의 전면과 배면의 흙구조물을 교대 구조의 일부로 이용함으로써, 교량거더의 신축에 따라 교대가 함께 거동하여 교량거더의 신축이 수용되고, 지진 등 외부하중에 효율적으로 대응 가능한 효과를 제공할 수 있다.
METHOD FOR CONSTRUCTING INTEGRAL ABUTMENT BRIDGE
일체식 교대 교량 시공방법
CHOI BYEONG CHUL (author)
2016-09-02
Patent
Electronic Resource
Korean
- H Abutment integrated with H-pile in integral abutment bridge and Constructing method thereof
European Patent Office | 2019
- H Abutment integrated with H-pile in integral abutment bridge and Constructing method thereof
European Patent Office | 2018
|European Patent Office | 2021
|European Patent Office | 2015
|