The present invention relates to a method for constructing a bridge using a girder-integrated coping portion, which can minimize high-altitude work and easily adjust the height of a bridge without cutting a steel pile by coupling a connecting steel pipe integrated with a girder to an upper end of the steel pile supported by the ground. The method for constructing a bridge using a girder-integrated coping portion comprises the steps of: a) installing a plurality of steel piles on the ground to be spaced apart from each other; b) coupling a main girder between two connecting steel pipes each having a coupler formed on a lower portion thereof to protrude, and fabricating a plurality of girder-integrated coping portions on outer portions of the connecting steel pipes on the ground, each of the girder-integrated coping portions having a girder coupled to an end portion thereof; c) coupling the girder-integrated coping portions to a pair of upper portions of the steel pipes every two spans such that the couplers formed on the lower portion of the connecting steel pipes can be inserted into the upper portions of the steel piles to be coupled thereto; d) coupling a center girder between end girders of adjacent girder-integrated coping portions; and e) placing a PC slab on an upper portion of the girders.
본 발명은 지반에 지지되는 강관 파일 상단에 거더가 미리 결합된 연결 강관을 결합함으로써, 고공 작업을 최소화함과 아울러 강관 파일의 절단 없이 교각의 높이를 용이하게 맞출 수 있는 거더 일체형 코핑부를 이용한 교량 시공 방법에 대한 것이다.본 발명 거더 일체형 코핑부를 이용한 교량 시공 방법은 (a) 지반에 복수의 강관 파일을 상호 이격되게 설치하는 단계; (b) 하부에 결합구가 돌출 형성되는 연결 강관 두 개 사이에 주거더를 결합하고 연결 강관 외측에는 단부 거더를 결합한 복수의 거더 일체형 코핑부를 지상에서 제작하는 단계; (c) 상기 연결 강관 하부의 결합구가 강관 파일의 상부에 삽입되어 결합되도록 상기 거더 일체형 코핑부를 한 스팬 건너 하나씩 한 쌍의 강관 파일 상부에 결합하는 단계; (d) 인접하는 거더 일체형 코핑부의 단부 거더 사이에 중앙 거더를 결합하는 단계; 및 (e) 상기 거더의 상부에 PC 슬래브를 거치하는 단계; 를 포함하여 구성되는 것을 특징으로 한다.
Construction method of bridge using girder with integral coping
The present invention relates to a method for constructing a bridge using a girder-integrated coping portion, which can minimize high-altitude work and easily adjust the height of a bridge without cutting a steel pile by coupling a connecting steel pipe integrated with a girder to an upper end of the steel pile supported by the ground. The method for constructing a bridge using a girder-integrated coping portion comprises the steps of: a) installing a plurality of steel piles on the ground to be spaced apart from each other; b) coupling a main girder between two connecting steel pipes each having a coupler formed on a lower portion thereof to protrude, and fabricating a plurality of girder-integrated coping portions on outer portions of the connecting steel pipes on the ground, each of the girder-integrated coping portions having a girder coupled to an end portion thereof; c) coupling the girder-integrated coping portions to a pair of upper portions of the steel pipes every two spans such that the couplers formed on the lower portion of the connecting steel pipes can be inserted into the upper portions of the steel piles to be coupled thereto; d) coupling a center girder between end girders of adjacent girder-integrated coping portions; and e) placing a PC slab on an upper portion of the girders.
본 발명은 지반에 지지되는 강관 파일 상단에 거더가 미리 결합된 연결 강관을 결합함으로써, 고공 작업을 최소화함과 아울러 강관 파일의 절단 없이 교각의 높이를 용이하게 맞출 수 있는 거더 일체형 코핑부를 이용한 교량 시공 방법에 대한 것이다.본 발명 거더 일체형 코핑부를 이용한 교량 시공 방법은 (a) 지반에 복수의 강관 파일을 상호 이격되게 설치하는 단계; (b) 하부에 결합구가 돌출 형성되는 연결 강관 두 개 사이에 주거더를 결합하고 연결 강관 외측에는 단부 거더를 결합한 복수의 거더 일체형 코핑부를 지상에서 제작하는 단계; (c) 상기 연결 강관 하부의 결합구가 강관 파일의 상부에 삽입되어 결합되도록 상기 거더 일체형 코핑부를 한 스팬 건너 하나씩 한 쌍의 강관 파일 상부에 결합하는 단계; (d) 인접하는 거더 일체형 코핑부의 단부 거더 사이에 중앙 거더를 결합하는 단계; 및 (e) 상기 거더의 상부에 PC 슬래브를 거치하는 단계; 를 포함하여 구성되는 것을 특징으로 한다.
Construction method of bridge using girder with integral coping
거더 일체형 코핑부를 이용한 교량 시공 방법
RYU JAE WOO (author) / RYU SUNG YEOL (author)
2016-12-13
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
PSC GIRDER FOR SEMI-INTEGRAL BRIDGE AND BRIDGE CONSTRUCTION METHOD THEREWITH
European Patent Office | 2017
|Grid girder and bridge construction method using the girder
European Patent Office | 2019
|European Patent Office | 2015
|