The present invention relates to a ground construction device capable of a driving work of driving a pile into the ground and a boring work of excavating a bored hole by replacing a working device such as a boring machine and a driving machine. Specifically, a horizontal bar is horizontally installed in front of a crane main body of a crane, and multiple strands of wire ropes are installed between an upper support installed in the upper part of a boom and the horizontal bar. An ascending and descending unit on which the working device such as the boring machine or the driving machine is mounted is installed in the wire rope to be guided to ascend and descend. So, when the wire rope is expanded as the boom is erect, the expanded wire rope substitutes for a role of an existing pillar (leader). According to the present invention, The ground construction device is installed in the crane (1). A lower end of the boom (3) is installed on front of the crane main body (2) by a hinge. An upper support (5) including an upper roller (6) is installed in the upper part of the boom (3), and the upper roller (6) hangs down a winch wire (4) as the winch wire (4) is wound thereon by a winch device. A hook (4a) is installed at an end of the winch wire (4) hung down by being wound on the upper roller (6).
본 발명은 항타기나 천공기와 같은 작업기를 교체 설치하여 지반에 말뚝을 때려 박는 항타작업이나, 지반에 천공홀을 굴착하는 천공작업을 할 수 있도록 하는 지반공사장치에 관한 것으로, 더욱 상세하게는 공지된 크레인의 크레인본체 전방에 수평대를 수평 설치하고, 붐대의 상부에 설치되는 상부지지대와 수평대의 사이에 수개 가닥의 와이어로프를 설치하며, 와이어로프에는 항타기나 천공기와 같은 작업기가 장착되는 승하강대를 승하강 안내되게 설치함으로써, 붐대를 세워서 와이어로프가 팽팽해지게 하면 팽팽해진 와이어로프가 종래의 지주대(리더) 역할을 대신할 수 있도록 하기 위한 것이다.본 발명은 크레인본체(2)의 전방측에 붐대(3)의 하단부가 힌지식으로 설치되고, 이 붐대(3)의 상부에는 윈치장치에 의해 윈치와이어(4)가 감겨지며 하측으로 늘어트려지게 하는 상부롤러(6)를 구비한 상부지지대(5)가 설치되며, 상부롤러(6)에 감겨져서 하측으로 늘어트려지는 윈치와이어(4)의 단부에는 후크(4a)가 설치된 크레인(1)에 지반공사장치(100)를 설치하는 것에 있어서, 상기 지반공사장치(100)는 크레인본체(2)의 전방 하측에 수평대(10)가 전방으로 수평 설치되고, 상부지지대(5)의 하부와 수평대(10)의 선단부 상측 사이에는 적어도 2가닥 이상의 와이어로프(13)가 설치되며, 크레인(1)의 소정위치에는 붐대(3)와 수평대(10)의 각도를 벌려서 상부지지대(5)와 수평대(10)의 사이에 설치된 와이어로프(13)를 팽팽하게 긴장시키는 붐대(3)와 수평대(10)의 사이에 실린더(14)가 설치되고, 상기 와이어로프(13)에는 팽팽해진 와이어로프(13)를 따라 승하강하는 승하강대(20)를 설치하되, 이 승하강대(20)는 승하강대본체(21)의 후방 양측에 와이어로프(13)에 안내되는 한 쌍의 롤러(24)가 좌우로 폭 조절되게 설치되며, 승하강대본체(21)의 전방에는 윈치와이어(4)의 단부에 걸려서 승하강하는 작업기(26)가 설치되는 작업기설치대(22)가 설치되고, 상기 수평대(10)의 내측단에 적어도 2개 이상의 핀구멍(11)이 전후 길이방향으로 간격을 두고 형성되고, 크레인본체(2)의 전방에는 수평대(10)의 핀구멍(11)과 동일한 간격으로 핀구멍(8)이 형성되어 서로 일치하는 핀구멍(11,8)으로 핀이 삽탈되는 핀결합부(7)가 전방으로 돌출되게 설치되며, 상기 한 쌍의 롤러(24)는 승하강대본체(21)에 형성된 장공(25)에 설치되는 롤러축(23)에 설치되며, 장공(25)을 관통한 롤러축(23)의 단부에는 너트가 체결되어 서로 대응되는 롤러(24)의 간격이 조절되는 구성이 포함되는 것을 특징으로 한다.
The present invention relates to a ground construction device capable of a driving work of driving a pile into the ground and a boring work of excavating a bored hole by replacing a working device such as a boring machine and a driving machine. Specifically, a horizontal bar is horizontally installed in front of a crane main body of a crane, and multiple strands of wire ropes are installed between an upper support installed in the upper part of a boom and the horizontal bar. An ascending and descending unit on which the working device such as the boring machine or the driving machine is mounted is installed in the wire rope to be guided to ascend and descend. So, when the wire rope is expanded as the boom is erect, the expanded wire rope substitutes for a role of an existing pillar (leader). According to the present invention, The ground construction device is installed in the crane (1). A lower end of the boom (3) is installed on front of the crane main body (2) by a hinge. An upper support (5) including an upper roller (6) is installed in the upper part of the boom (3), and the upper roller (6) hangs down a winch wire (4) as the winch wire (4) is wound thereon by a winch device. A hook (4a) is installed at an end of the winch wire (4) hung down by being wound on the upper roller (6).
본 발명은 항타기나 천공기와 같은 작업기를 교체 설치하여 지반에 말뚝을 때려 박는 항타작업이나, 지반에 천공홀을 굴착하는 천공작업을 할 수 있도록 하는 지반공사장치에 관한 것으로, 더욱 상세하게는 공지된 크레인의 크레인본체 전방에 수평대를 수평 설치하고, 붐대의 상부에 설치되는 상부지지대와 수평대의 사이에 수개 가닥의 와이어로프를 설치하며, 와이어로프에는 항타기나 천공기와 같은 작업기가 장착되는 승하강대를 승하강 안내되게 설치함으로써, 붐대를 세워서 와이어로프가 팽팽해지게 하면 팽팽해진 와이어로프가 종래의 지주대(리더) 역할을 대신할 수 있도록 하기 위한 것이다.본 발명은 크레인본체(2)의 전방측에 붐대(3)의 하단부가 힌지식으로 설치되고, 이 붐대(3)의 상부에는 윈치장치에 의해 윈치와이어(4)가 감겨지며 하측으로 늘어트려지게 하는 상부롤러(6)를 구비한 상부지지대(5)가 설치되며, 상부롤러(6)에 감겨져서 하측으로 늘어트려지는 윈치와이어(4)의 단부에는 후크(4a)가 설치된 크레인(1)에 지반공사장치(100)를 설치하는 것에 있어서, 상기 지반공사장치(100)는 크레인본체(2)의 전방 하측에 수평대(10)가 전방으로 수평 설치되고, 상부지지대(5)의 하부와 수평대(10)의 선단부 상측 사이에는 적어도 2가닥 이상의 와이어로프(13)가 설치되며, 크레인(1)의 소정위치에는 붐대(3)와 수평대(10)의 각도를 벌려서 상부지지대(5)와 수평대(10)의 사이에 설치된 와이어로프(13)를 팽팽하게 긴장시키는 붐대(3)와 수평대(10)의 사이에 실린더(14)가 설치되고, 상기 와이어로프(13)에는 팽팽해진 와이어로프(13)를 따라 승하강하는 승하강대(20)를 설치하되, 이 승하강대(20)는 승하강대본체(21)의 후방 양측에 와이어로프(13)에 안내되는 한 쌍의 롤러(24)가 좌우로 폭 조절되게 설치되며, 승하강대본체(21)의 전방에는 윈치와이어(4)의 단부에 걸려서 승하강하는 작업기(26)가 설치되는 작업기설치대(22)가 설치되고, 상기 수평대(10)의 내측단에 적어도 2개 이상의 핀구멍(11)이 전후 길이방향으로 간격을 두고 형성되고, 크레인본체(2)의 전방에는 수평대(10)의 핀구멍(11)과 동일한 간격으로 핀구멍(8)이 형성되어 서로 일치하는 핀구멍(11,8)으로 핀이 삽탈되는 핀결합부(7)가 전방으로 돌출되게 설치되며, 상기 한 쌍의 롤러(24)는 승하강대본체(21)에 형성된 장공(25)에 설치되는 롤러축(23)에 설치되며, 장공(25)을 관통한 롤러축(23)의 단부에는 너트가 체결되어 서로 대응되는 롤러(24)의 간격이 조절되는 구성이 포함되는 것을 특징으로 한다.
Device for building ground subsidence
지반공사장치
LEE DONG JEONG (author)