Disclosed is a building construction method applying an exposed concrete wall, capable of easily constructing the exposed concrete wall. According to the present invention, the method comprises: a grid line mold making step of continuously installing a plurality of mold bodies to make each connection post correspond to a grid line forming position of the wall of the exposed concrete, installing a grid line fixation members on a front part of the mold body to correspond to a crossing position of a grid line formed on the exposed concrete, and inserting both ends of a grid line bar into the grid line fixation member adjacent in an identical line in each of horizontal and vertical directions, to make a grid line mold; a grid line mold arranging step of arranging the facing grid line molds at an interval; a spacing distance ensuring step of ensuring a spacing distance between the grid line molds (110); a D cone coupling step; a main body bolt coupling step of coupling a main body bolt to a D cone; a casted rectangular washer fastening step; a casted nut fastening step; a concrete curing step of depositing concrete between the grid line molds to cure the concrete; a part removing step; and a grid line mold dismantling step of dismantling the grid line mold to separate the mold body and the grid line bar.
본 발명은 노출콘크리트 벽체를 적용한 건축 구조물 시공방법을 개시한다. 본 발명에 따른 노출콘크리트 벽체를 적용한 건축 구조물 시공방법은, 노출콘크리트 벽체의 면적에 대응되도록 판상의 거푸집 본체들을 연속적으로 설치한 다음, 거푸집 본체의 전면부 상에 노출콘크리트 벽체에 형성되는 격자줄의 교차 지점과 각각 대응되도록 격자줄바 고정부재들을 설치한 다음 수평 및 수직방향별 동일선상으로 인접한 격자줄바 고정부재에 격자줄바의 양단을 각각 삽입시킴으로써 격자줄용 거푸집을 제작하는 격자줄용 거푸집 제작단계; 격자줄용 거푸집 제작단계를 통해 제작된 상기 격자줄용 거푸집들을 상호 마주보도록 이격 배치하는 격자줄용 거푸집 배치단계; 세파 볼트를 이용하여 상기 격자줄용 거푸집(110)들 간의 이격거리를 확보하는 이격거리 확보단계; 상기 노출콘크리트 벽체에 형성되는 콘구멍의 자리를 형성하는 D 콘을 상기 세파 볼트의 양단부에 결합시키는 D 콘 결합단계; 본체 볼트를 상기 격자줄용 거푸집들을 각각 통과하도록 한 후에 상기 본체 볼트를 상기 D 콘에 결합시키는 본체 볼트 결합단계; 상기 격자줄용 거푸집들의 외측에서 상기 본체 볼트에 끼워지게 주물 사각와셔를 체결하는 주물 사각와셔 체결단계; 상기 주물 사각와셔가 이탈되지 않도록 주물 너트를 체결하는 주물 너트 체결단계; 상기 격자줄용 거푸집들 사이로 콘크리트를 넣어 양생하는 콘크리트 양생단계; 상기 콘크리트가 완전히 굳기 전에 상기 격자줄용 거푸집들, 상기 D 콘, 상기 본체 볼트, 상기 주물 사각와셔 및 상기 주물 너트를 제거하는 부품 제거단계; 및 상기 격자줄용 거푸집을 해체하여 거푸집 본체와 격자줄바를 분리하는 격자줄용 거푸집 해체 단계;를 포함하여 이루어지되; 상기 격자줄바는, 상기 거푸집 본체의 전면부에 접하는 평평한 제 1 면과, 라운딩 처리되어 볼록한 형상을 취함과 동시에 양단측에는 격자줄바 고정부재에 결합되기 위한 결합홈이 가공된 제 2 면으로 형성되고, 격자줄바 고정부재는 평평한 십자형(+)의 구조로 형성되어 좌,우,상,하 방향으로 1 내지 4 바닥 날개부가 각각 형성되는 바닥판과, 상기 십자형의 바닥판 중앙으로부터 일체로 돌출형성되고, 상면에는 음각 또는 양각으로의 특정 패턴의 형상이 가공되며, 중앙에는 상기 바닥판을 포함하여 관통되는 체결홀이 형성되는 중앙돌기와, 상기 바닥판의 제 1 내지 제 4 바닥 날개부에 각각 형성되고, 격자줄바의 결합홈과 결합되어 격자줄바를 고정하는 제 1 내지 제 4 고정클립으로 구분 형성되는 고정클립부를 포함하여 형성되는 것을 특징으로 한다.
Building construction method using exposed concrete wall
Disclosed is a building construction method applying an exposed concrete wall, capable of easily constructing the exposed concrete wall. According to the present invention, the method comprises: a grid line mold making step of continuously installing a plurality of mold bodies to make each connection post correspond to a grid line forming position of the wall of the exposed concrete, installing a grid line fixation members on a front part of the mold body to correspond to a crossing position of a grid line formed on the exposed concrete, and inserting both ends of a grid line bar into the grid line fixation member adjacent in an identical line in each of horizontal and vertical directions, to make a grid line mold; a grid line mold arranging step of arranging the facing grid line molds at an interval; a spacing distance ensuring step of ensuring a spacing distance between the grid line molds (110); a D cone coupling step; a main body bolt coupling step of coupling a main body bolt to a D cone; a casted rectangular washer fastening step; a casted nut fastening step; a concrete curing step of depositing concrete between the grid line molds to cure the concrete; a part removing step; and a grid line mold dismantling step of dismantling the grid line mold to separate the mold body and the grid line bar.
본 발명은 노출콘크리트 벽체를 적용한 건축 구조물 시공방법을 개시한다. 본 발명에 따른 노출콘크리트 벽체를 적용한 건축 구조물 시공방법은, 노출콘크리트 벽체의 면적에 대응되도록 판상의 거푸집 본체들을 연속적으로 설치한 다음, 거푸집 본체의 전면부 상에 노출콘크리트 벽체에 형성되는 격자줄의 교차 지점과 각각 대응되도록 격자줄바 고정부재들을 설치한 다음 수평 및 수직방향별 동일선상으로 인접한 격자줄바 고정부재에 격자줄바의 양단을 각각 삽입시킴으로써 격자줄용 거푸집을 제작하는 격자줄용 거푸집 제작단계; 격자줄용 거푸집 제작단계를 통해 제작된 상기 격자줄용 거푸집들을 상호 마주보도록 이격 배치하는 격자줄용 거푸집 배치단계; 세파 볼트를 이용하여 상기 격자줄용 거푸집(110)들 간의 이격거리를 확보하는 이격거리 확보단계; 상기 노출콘크리트 벽체에 형성되는 콘구멍의 자리를 형성하는 D 콘을 상기 세파 볼트의 양단부에 결합시키는 D 콘 결합단계; 본체 볼트를 상기 격자줄용 거푸집들을 각각 통과하도록 한 후에 상기 본체 볼트를 상기 D 콘에 결합시키는 본체 볼트 결합단계; 상기 격자줄용 거푸집들의 외측에서 상기 본체 볼트에 끼워지게 주물 사각와셔를 체결하는 주물 사각와셔 체결단계; 상기 주물 사각와셔가 이탈되지 않도록 주물 너트를 체결하는 주물 너트 체결단계; 상기 격자줄용 거푸집들 사이로 콘크리트를 넣어 양생하는 콘크리트 양생단계; 상기 콘크리트가 완전히 굳기 전에 상기 격자줄용 거푸집들, 상기 D 콘, 상기 본체 볼트, 상기 주물 사각와셔 및 상기 주물 너트를 제거하는 부품 제거단계; 및 상기 격자줄용 거푸집을 해체하여 거푸집 본체와 격자줄바를 분리하는 격자줄용 거푸집 해체 단계;를 포함하여 이루어지되; 상기 격자줄바는, 상기 거푸집 본체의 전면부에 접하는 평평한 제 1 면과, 라운딩 처리되어 볼록한 형상을 취함과 동시에 양단측에는 격자줄바 고정부재에 결합되기 위한 결합홈이 가공된 제 2 면으로 형성되고, 격자줄바 고정부재는 평평한 십자형(+)의 구조로 형성되어 좌,우,상,하 방향으로 1 내지 4 바닥 날개부가 각각 형성되는 바닥판과, 상기 십자형의 바닥판 중앙으로부터 일체로 돌출형성되고, 상면에는 음각 또는 양각으로의 특정 패턴의 형상이 가공되며, 중앙에는 상기 바닥판을 포함하여 관통되는 체결홀이 형성되는 중앙돌기와, 상기 바닥판의 제 1 내지 제 4 바닥 날개부에 각각 형성되고, 격자줄바의 결합홈과 결합되어 격자줄바를 고정하는 제 1 내지 제 4 고정클립으로 구분 형성되는 고정클립부를 포함하여 형성되는 것을 특징으로 한다.
Building construction method using exposed concrete wall
노출콘크리트 벽체를 적용한 건축 구조물 시공방법
SON HYEONG HO (author) / SON DONG WOO (author) / SON DONG JOON (author)
2017-12-20
Patent
Electronic Resource
Korean
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building construction method using exposed concrete wall
European Patent Office | 2018
|Building construction method using exposed concrete wall
European Patent Office | 2018
|Building construction method using exposed concrete wall
European Patent Office | 2017
|Building construction method using exposed concrete wall
European Patent Office | 2018
|Building construction method using exposed concrete process
European Patent Office | 2017
|