The present invention relates to a prefabricated wood bridge using a wire method. More specifically, the prefabricated wood bridge using a wire method is configured such that steel and wood deck is used to install a bottom surface on a concrete installation, semi-cylindrical supports are respectively installed on the concrete installation and then connected with a horizontal rod, and a wire is installed on the horizontal rod, and the wire is used to support the bottom surface, thereby being able to provide the safe wood bridge with a long length. The prefabricated wood bridge deck using a wire method comprises: the concrete installation prepared by pouring concrete on both sides of the ground and installed in a one-story or two-story staircase form; the bottom surface installed on both sides of the concrete installation and installed with a steel material and a wood material, such that people can walk on; the semi-cylindrical supports installed upward on one side of the concrete installation; the horizontal rod for horizontal connection connecting between the semi-cylindrical supports to assist stiffness; the wire connecting the horizontal rod and the bottom surface to induce the pressure applied to the bottom surface to the horizontal rod and the semi-cylindrical supports, such that the pressure of the bottom surface is absorbed to the ground through the horizontal rod, semi-cylindrical supports and the concrete installation; a tension sensor installed between the wire and the bottom surface, checking the tension applied to the wire, and inducing the output of an alarm signal when the tension is not detected, and it is determined that the wire is broken; vertical bars for safety installed at regular intervals on both sides of the bottom surface and preventing people from falling; and horizontal bars for safety installed on both sides of the bottom surface, horizontally penetrating the vertical bars for safety, and preventing people from falling.
본 발명은 와이어 방식을 이용한 조립식 목교에 있어서, 특히 콘크리트 설치물에 철재와 목재 데크로 바닥면을 설치하고 콘크리트 설치물에 반고리형 지지체를 각각 설치후 가로봉으로 연결하고 상기 가로봉에 와이어를 설치후 와이어를 이용하여 바닥면을 지지토록함으로서 길이가 길면서도 안전한 목교를 제공하는 것을 특징으로 하는 현수교 방식을 이용한 조립식 목교 데크에 관한 것으로, 지면의 양측에 콘크리트를 이용하여 타설되며 일층 또는 이층의 계단 형태로 설치되어 이루어지는 콘크리트 타설물과; 상기 콘크리트 타설물 양측에 설치되며 철재 및 목재를 이용하여 사람이 걸어다닐 수 있도록 설치되는 바닥면과; 상기 콘크리트 타설물의 일측에 상부방향으로 설치되는 반고리형 지지체와; 상기 반고리형 지지체 사이를 연결하여 강성을 보조하는 가로 연결용 가로봉과; 상기 가로봉과 바닥면을 연결하여 바닥면에 가해지는 압력을 가로봉 및 반고리형 지지체 유도하여 바닥면의 압력이 가로봉과 반고리형 지지체 및 콘크리트 타설물을 통해 지면으로 흡수되도록 유도하는 와이어와; 상기 와이어와 바닥면 사이에 설치되면 와이어에 가해지는 장력을 체크하여 장력이 검출되지 않으면 와이어가 끊어진 것으로 판단하여 경보신호를 출력토록 유도하는 장력센서와; 상기 바닥면의 양측에 일정간격으로 설치되어 사람이 추락하는 것을 막는 안전용 수직바와; 상기 바닥면의 양측에 설치하되 안정용 수직바를 수평하게 관통하면서 설치되며 사람이 추락하는 것을 방지하는 안전용 수평바를 포함하여 구성함이 특징이다.
The present invention relates to a prefabricated wood bridge using a wire method. More specifically, the prefabricated wood bridge using a wire method is configured such that steel and wood deck is used to install a bottom surface on a concrete installation, semi-cylindrical supports are respectively installed on the concrete installation and then connected with a horizontal rod, and a wire is installed on the horizontal rod, and the wire is used to support the bottom surface, thereby being able to provide the safe wood bridge with a long length. The prefabricated wood bridge deck using a wire method comprises: the concrete installation prepared by pouring concrete on both sides of the ground and installed in a one-story or two-story staircase form; the bottom surface installed on both sides of the concrete installation and installed with a steel material and a wood material, such that people can walk on; the semi-cylindrical supports installed upward on one side of the concrete installation; the horizontal rod for horizontal connection connecting between the semi-cylindrical supports to assist stiffness; the wire connecting the horizontal rod and the bottom surface to induce the pressure applied to the bottom surface to the horizontal rod and the semi-cylindrical supports, such that the pressure of the bottom surface is absorbed to the ground through the horizontal rod, semi-cylindrical supports and the concrete installation; a tension sensor installed between the wire and the bottom surface, checking the tension applied to the wire, and inducing the output of an alarm signal when the tension is not detected, and it is determined that the wire is broken; vertical bars for safety installed at regular intervals on both sides of the bottom surface and preventing people from falling; and horizontal bars for safety installed on both sides of the bottom surface, horizontally penetrating the vertical bars for safety, and preventing people from falling.
본 발명은 와이어 방식을 이용한 조립식 목교에 있어서, 특히 콘크리트 설치물에 철재와 목재 데크로 바닥면을 설치하고 콘크리트 설치물에 반고리형 지지체를 각각 설치후 가로봉으로 연결하고 상기 가로봉에 와이어를 설치후 와이어를 이용하여 바닥면을 지지토록함으로서 길이가 길면서도 안전한 목교를 제공하는 것을 특징으로 하는 현수교 방식을 이용한 조립식 목교 데크에 관한 것으로, 지면의 양측에 콘크리트를 이용하여 타설되며 일층 또는 이층의 계단 형태로 설치되어 이루어지는 콘크리트 타설물과; 상기 콘크리트 타설물 양측에 설치되며 철재 및 목재를 이용하여 사람이 걸어다닐 수 있도록 설치되는 바닥면과; 상기 콘크리트 타설물의 일측에 상부방향으로 설치되는 반고리형 지지체와; 상기 반고리형 지지체 사이를 연결하여 강성을 보조하는 가로 연결용 가로봉과; 상기 가로봉과 바닥면을 연결하여 바닥면에 가해지는 압력을 가로봉 및 반고리형 지지체 유도하여 바닥면의 압력이 가로봉과 반고리형 지지체 및 콘크리트 타설물을 통해 지면으로 흡수되도록 유도하는 와이어와; 상기 와이어와 바닥면 사이에 설치되면 와이어에 가해지는 장력을 체크하여 장력이 검출되지 않으면 와이어가 끊어진 것으로 판단하여 경보신호를 출력토록 유도하는 장력센서와; 상기 바닥면의 양측에 일정간격으로 설치되어 사람이 추락하는 것을 막는 안전용 수직바와; 상기 바닥면의 양측에 설치하되 안정용 수직바를 수평하게 관통하면서 설치되며 사람이 추락하는 것을 방지하는 안전용 수평바를 포함하여 구성함이 특징이다.
Deck of wood bridge
와이어 방식을 이용한 조립식 목교
MOON GIN KI (author)
2018-01-08
Patent
Electronic Resource
Korean
DECK WOOD CONNECTION AND DECK WOOD BRIDGE INCLUDING SUCH DECK WOOD CONNECTION