CONSTRUCTING METHOD FOR DRAINAGE AND REINFORCE OF FILLED GROUND IN SEASHORE
The present invention provides a construction method for drainage and reinforcement of a seaside landfill, capable of stabilizing the landfill in a short time. According to the present invention, the construction method for drainage and reinforcement of a seaside landfill comprises: a bottom pipe installation step of installing a water pump and a recovery pipe on an embankment of the seashore landfill, sinking a plurality of bottom pipes connected to weight bundles in seawater of the landfill to place the same on seabed, and connecting each bottom pipe to the recovery pipe with a connection pipe; a burying step of dumping marine soil on the landfill to form a buried layer; a channel formation step of forming a drain channel with an opened upper side on a surface layer part of the buried layer in order to drain surface water and filling a permeable material in the drain channel; a ground stabilization step of operating the water pump to remove leaching water remaining inside the buried layer through the bottom pipe, and stabilizing the ground by evaporation caused by sunlight and drainage through the drain channel; a soil covering step of forming a soil covering layer with soil, including 30 to 50 weight percent of normal soil, 20 to 30 weight percent of red clay, 5 to 10 weight percent of basic blast furnace slag, 5 to 10 weight percent of basic steelmaking slag, 5 to 10weight percent of fly ash, 1 to 5 weight percent of white charcoal powder, 1 to 5 weight percent of bentonite, 1 to 5 weight percent of colloid silica, and 0.1 to 1.0 weight percent of pine leaf powder, on the surface layer of the buried layer to increase the strength of the ground; a geotextile installation step of deploying and installing permeable geotextile on the soil covering layer; and a banking step of filling soil on the geotextile to form a banking layer.
본 발명은 해안가 매립장의 제방 위에 양수기와 회수배관을 설치하고, 매립장의 해수 속에 웨이트뭉치들이 연결된 복수 개의 바닥배관을 가라앉혀 바닥에 위치하도록 시공하며, 회수배관과 각 바닥배관을 연결배관으로 연결 시공하는 바닥배관 시공 단계; 매립장에 해성토를 투기하여 매립층을 형성하는 매립 단계; 표층수를 배출시킬 수 있도록 매립층의 표층부에 상측이 개방된 배수채널을 형성하고, 배수채널의 내측에 투수재를 충전시키는 채널 형성 단계; 양수기를 가동하여 바닥배관을 통하여 매립층 내부에 잔류하는 침출수를 제거하고, 일광에 의한 증발과 배수채널을 통한 배수로 지반을 안정화시키는 지반 안정화 단계; 매립층의 표층부 위에 중량%로 일반 토사 30 내지 50%, 황토 20 내지 30%, 염기성 고로슬래그 5 내지 10%, 염기성 제강슬래그 5 내지 10%, 플라이애쉬 5 내지 10%, 백탄가루 1 내지 5%, 벤토나이트 1 내지 5%, 콜로이드실리카 1 내지 5%, 솔잎가루 0.1 내지 1.0%로 이루어진 복토로 복토층을 형성하여 지반의 강도를 증가시키는 복토 단계; 복토층 위에 투수성 토목섬유를 전개시켜 설치하는 토목섬유 설치 단계; 및 토목섬유 위에 성토하여 성토층을 형성하는 성토 단계를 포함하는 해안가 매립장의 배수 및 보강을 위한 시공 방법을 제공한다.
CONSTRUCTING METHOD FOR DRAINAGE AND REINFORCE OF FILLED GROUND IN SEASHORE
The present invention provides a construction method for drainage and reinforcement of a seaside landfill, capable of stabilizing the landfill in a short time. According to the present invention, the construction method for drainage and reinforcement of a seaside landfill comprises: a bottom pipe installation step of installing a water pump and a recovery pipe on an embankment of the seashore landfill, sinking a plurality of bottom pipes connected to weight bundles in seawater of the landfill to place the same on seabed, and connecting each bottom pipe to the recovery pipe with a connection pipe; a burying step of dumping marine soil on the landfill to form a buried layer; a channel formation step of forming a drain channel with an opened upper side on a surface layer part of the buried layer in order to drain surface water and filling a permeable material in the drain channel; a ground stabilization step of operating the water pump to remove leaching water remaining inside the buried layer through the bottom pipe, and stabilizing the ground by evaporation caused by sunlight and drainage through the drain channel; a soil covering step of forming a soil covering layer with soil, including 30 to 50 weight percent of normal soil, 20 to 30 weight percent of red clay, 5 to 10 weight percent of basic blast furnace slag, 5 to 10 weight percent of basic steelmaking slag, 5 to 10weight percent of fly ash, 1 to 5 weight percent of white charcoal powder, 1 to 5 weight percent of bentonite, 1 to 5 weight percent of colloid silica, and 0.1 to 1.0 weight percent of pine leaf powder, on the surface layer of the buried layer to increase the strength of the ground; a geotextile installation step of deploying and installing permeable geotextile on the soil covering layer; and a banking step of filling soil on the geotextile to form a banking layer.
본 발명은 해안가 매립장의 제방 위에 양수기와 회수배관을 설치하고, 매립장의 해수 속에 웨이트뭉치들이 연결된 복수 개의 바닥배관을 가라앉혀 바닥에 위치하도록 시공하며, 회수배관과 각 바닥배관을 연결배관으로 연결 시공하는 바닥배관 시공 단계; 매립장에 해성토를 투기하여 매립층을 형성하는 매립 단계; 표층수를 배출시킬 수 있도록 매립층의 표층부에 상측이 개방된 배수채널을 형성하고, 배수채널의 내측에 투수재를 충전시키는 채널 형성 단계; 양수기를 가동하여 바닥배관을 통하여 매립층 내부에 잔류하는 침출수를 제거하고, 일광에 의한 증발과 배수채널을 통한 배수로 지반을 안정화시키는 지반 안정화 단계; 매립층의 표층부 위에 중량%로 일반 토사 30 내지 50%, 황토 20 내지 30%, 염기성 고로슬래그 5 내지 10%, 염기성 제강슬래그 5 내지 10%, 플라이애쉬 5 내지 10%, 백탄가루 1 내지 5%, 벤토나이트 1 내지 5%, 콜로이드실리카 1 내지 5%, 솔잎가루 0.1 내지 1.0%로 이루어진 복토로 복토층을 형성하여 지반의 강도를 증가시키는 복토 단계; 복토층 위에 투수성 토목섬유를 전개시켜 설치하는 토목섬유 설치 단계; 및 토목섬유 위에 성토하여 성토층을 형성하는 성토 단계를 포함하는 해안가 매립장의 배수 및 보강을 위한 시공 방법을 제공한다.
CONSTRUCTING METHOD FOR DRAINAGE AND REINFORCE OF FILLED GROUND IN SEASHORE
해안가 매립장의 배수 및 보강을 위한 시공 방법