A platform for research: civil engineering, architecture and urbanism
METHOD FOR REINFORCING LOAD-BEARING WALL AND SHEAR REINFORCED LOAD-BEARING WALLS
The present invention relates to a method for reinforcing a load-bearing wall and a shear reinforced load-bearing wall that increases shear strength and shear deformation ability to achieve earthquake-proof performance of the load-bearing wall made of concrete. The method includes: an inspection step of non-destructively inspecting a predetermined section for reinforcing a load-bearing wall, and determining a construction area on a front surface of the load-bearing wall; a groove forming step of, in order to insert a reinforcing plate made of a rectangular steel plate for reinforcing shear strength of the construction area and provided with a plurality of spacers elongated in a longitudinal direction and spaced apart from each other at regular intervals, forming a first area by cutting the front surface of the load-bearing wall around a front rebar, as a connection space of the front bars positioned in front of the front of the load-bearing wall, to expose the front rebars, cutting the front rebars crossing a position where the reinforcing plate is positioned, forming a second area from the first area in the load-bearing wall to rear rebars, without exposing the rear rebars, to form a ┴-shaped or ├-shaped insertion groove; an insertion step of inserting and fixing the reinforcing plate in the second area of the insertion groove; a rebar connecting step of connecting the exposed front rebars by connecting members or coupler members; and a recovery step having a front surface constructing step of constructing mortar or concrete/mortar on the first area which is a connecting space around the groove, and a filling step of filling a gap between the second area of the insertion groove and the reinforcing plate with resin.
본 발명 내력벽체 보강공법은 내력벽체 보강을 위한 예정구역에 대한 비파괴 검사를 수행하고 내력벽체의 전면(前面)에 시공영역을 결정하는 검사단계; 상기 시공영역에 전단강도 보강을 위해 직사각형 형상인 강판이고, 양면에 폭 방향으로 길게 형성된 복수의 스페이서가 소정 간격으로 이격되게 구비된 보강 플레이트를 삽입하기 위한 것으로 내력벽체 내부의 전면에 위치한 전면 철근들의 연결 공간용으로 전면 철근 주위의 내력벽체 전면을 깎아낸 제1 영역을 형성하여 상기 전면 철근들을 노출시키면서 보강 플레이트가 삽입될 위치를 가로지르는 전면 철근을 절단하고, 상기 내력벽체 내 단면상 상기 제1 영역에서 후면 철근들이 노출되지 않게 상기 후면 철근들 앞까지 제2 영역을 형성하여 '⊥' 또는 '├' 형상의 삽입홈이 형성되는, 홈 형성단계; 상기 삽입홈의 제2 영역에 상기 보강 플레이트를 삽입하여 고정하는 삽입단계; 노출된 상기 전면 철근들을 커플러 부재 또는 용접될 철근부재인 연결부재들을 이용하여 연결하는 철근연결단계; 및 깎여진 상기 홈 주위의 연결 공간인 제1 영역에 대한 몰탈 시공 또는 콘크리트 및 몰탈 시공하여 벽체 전면복구층을 형성하는 전면시공단계 및 상기 삽입홈의 제2 영역과 상기 보강 플레이트 사이의 틈새에 대한 수지 충전(充塡)하는 충전단계를 통해 상기 내력벽체의 전면(前面)을 복구하는 복구단계;를 포함한다.
METHOD FOR REINFORCING LOAD-BEARING WALL AND SHEAR REINFORCED LOAD-BEARING WALLS
The present invention relates to a method for reinforcing a load-bearing wall and a shear reinforced load-bearing wall that increases shear strength and shear deformation ability to achieve earthquake-proof performance of the load-bearing wall made of concrete. The method includes: an inspection step of non-destructively inspecting a predetermined section for reinforcing a load-bearing wall, and determining a construction area on a front surface of the load-bearing wall; a groove forming step of, in order to insert a reinforcing plate made of a rectangular steel plate for reinforcing shear strength of the construction area and provided with a plurality of spacers elongated in a longitudinal direction and spaced apart from each other at regular intervals, forming a first area by cutting the front surface of the load-bearing wall around a front rebar, as a connection space of the front bars positioned in front of the front of the load-bearing wall, to expose the front rebars, cutting the front rebars crossing a position where the reinforcing plate is positioned, forming a second area from the first area in the load-bearing wall to rear rebars, without exposing the rear rebars, to form a ┴-shaped or ├-shaped insertion groove; an insertion step of inserting and fixing the reinforcing plate in the second area of the insertion groove; a rebar connecting step of connecting the exposed front rebars by connecting members or coupler members; and a recovery step having a front surface constructing step of constructing mortar or concrete/mortar on the first area which is a connecting space around the groove, and a filling step of filling a gap between the second area of the insertion groove and the reinforcing plate with resin.
본 발명 내력벽체 보강공법은 내력벽체 보강을 위한 예정구역에 대한 비파괴 검사를 수행하고 내력벽체의 전면(前面)에 시공영역을 결정하는 검사단계; 상기 시공영역에 전단강도 보강을 위해 직사각형 형상인 강판이고, 양면에 폭 방향으로 길게 형성된 복수의 스페이서가 소정 간격으로 이격되게 구비된 보강 플레이트를 삽입하기 위한 것으로 내력벽체 내부의 전면에 위치한 전면 철근들의 연결 공간용으로 전면 철근 주위의 내력벽체 전면을 깎아낸 제1 영역을 형성하여 상기 전면 철근들을 노출시키면서 보강 플레이트가 삽입될 위치를 가로지르는 전면 철근을 절단하고, 상기 내력벽체 내 단면상 상기 제1 영역에서 후면 철근들이 노출되지 않게 상기 후면 철근들 앞까지 제2 영역을 형성하여 '⊥' 또는 '├' 형상의 삽입홈이 형성되는, 홈 형성단계; 상기 삽입홈의 제2 영역에 상기 보강 플레이트를 삽입하여 고정하는 삽입단계; 노출된 상기 전면 철근들을 커플러 부재 또는 용접될 철근부재인 연결부재들을 이용하여 연결하는 철근연결단계; 및 깎여진 상기 홈 주위의 연결 공간인 제1 영역에 대한 몰탈 시공 또는 콘크리트 및 몰탈 시공하여 벽체 전면복구층을 형성하는 전면시공단계 및 상기 삽입홈의 제2 영역과 상기 보강 플레이트 사이의 틈새에 대한 수지 충전(充塡)하는 충전단계를 통해 상기 내력벽체의 전면(前面)을 복구하는 복구단계;를 포함한다.
METHOD FOR REINFORCING LOAD-BEARING WALL AND SHEAR REINFORCED LOAD-BEARING WALLS
내력벽체 보강공법 및 전단보강 내력벽체
KIM JUNG SU (author) / SHIN YONG SOO (author)
2018-06-25
Patent
Electronic Resource
Korean
SHAPE STEEL LOAD-BEARING WALLS AND REINFORCING METHOD OF USING SHAPE STEEL LOAD-BEARING WALLS
European Patent Office | 2020
SHAPE STEEL LOAD-BEARING WALLS AND REINFORCING METHOD OF USING SHAPE STEEL LOAD-BEARING WALLS
European Patent Office | 2019
|Blast Assessment of Load-Bearing Reinforced Concrete Shear Walls
Online Contents | 2006
|Blast Assessment of Load-Bearing Reinforced Concrete Shear Walls
British Library Online Contents | 2006
|European Patent Office | 2019
|