A platform for research: civil engineering, architecture and urbanism
UNDER GROUND STRUCTURE CONSTRUCTION METHOD USING COMPOSITE STEEL PILE AND UNDER GROUND STRUCTURE THEREWITH
The present invention relates to an underground structure construction method using a composite steel pile and an underground structure manufactured by using the same. By using the underground structure construction method, shotcrete is sprayed and coated to construct an underground wall of an underground structure, and a precast upper plate and a bottom plate are used to quickly construct the underground structure. The composite steel pile is directly constructed to have a depth (D) lower than the bottom plate of the underground structure while being connectively constructed in the longitudinal direction and separately constructed in the transverse direction, thereby being constructible even in an aquifer as the underground wall of the underground structure.
토사층, 풍화암층 및 암반층까지 시공 가능한 강관파일을 시공한 후 숏크리트를 뿜칠하여 지중구조물의 지중벽체를 시공하고, 프리캐스트 상부판 및 저판을 이용하여 신속하게 지중구조물을 시공할 수 있는 합성강관파일을 이용한 지중구조물 시공방법 및 이를 이용한 지중구조물에 대한 것으로서, 상기 합성강관파일은 지반에 직접 지중구조물 저판 이하의 심도(D)를 가지도록 시공하되 종방향으로 연결 시공하고 횡방향으로 서로 이격되도록 시공하여 지중구조물의 지중벽체로서 암반층까지 시공가능하게 된다.
UNDER GROUND STRUCTURE CONSTRUCTION METHOD USING COMPOSITE STEEL PILE AND UNDER GROUND STRUCTURE THEREWITH
The present invention relates to an underground structure construction method using a composite steel pile and an underground structure manufactured by using the same. By using the underground structure construction method, shotcrete is sprayed and coated to construct an underground wall of an underground structure, and a precast upper plate and a bottom plate are used to quickly construct the underground structure. The composite steel pile is directly constructed to have a depth (D) lower than the bottom plate of the underground structure while being connectively constructed in the longitudinal direction and separately constructed in the transverse direction, thereby being constructible even in an aquifer as the underground wall of the underground structure.
토사층, 풍화암층 및 암반층까지 시공 가능한 강관파일을 시공한 후 숏크리트를 뿜칠하여 지중구조물의 지중벽체를 시공하고, 프리캐스트 상부판 및 저판을 이용하여 신속하게 지중구조물을 시공할 수 있는 합성강관파일을 이용한 지중구조물 시공방법 및 이를 이용한 지중구조물에 대한 것으로서, 상기 합성강관파일은 지반에 직접 지중구조물 저판 이하의 심도(D)를 가지도록 시공하되 종방향으로 연결 시공하고 횡방향으로 서로 이격되도록 시공하여 지중구조물의 지중벽체로서 암반층까지 시공가능하게 된다.
UNDER GROUND STRUCTURE CONSTRUCTION METHOD USING COMPOSITE STEEL PILE AND UNDER GROUND STRUCTURE THEREWITH
합성강관파일을 이용한 지중구조물 시공방법 및 이를 이용하여 제작된 지중구조물
YOO BYUNG HOON (author)
2018-10-01
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2018
|European Patent Office | 2020
|European Patent Office | 2020
UNDER-GROUND PUSHING PIPE AND UNDER-GROUND STRUCTURE CONSTRUCTION METHOD THEREWITH
European Patent Office | 2016
|European Patent Office | 2017
|