A platform for research: civil engineering, architecture and urbanism
Construction method of girder composite rahmen bridge and Girder composite rahmen bridge
The present invention relates to a construction method of a girder-rahmen composite bridge, wherein a rahmen structure is formed by extending an end wing wall of a PC girder from an end part of a girder body to be simply joined to the upper part of an abutment and joining concrete for integrating the top of the abutment and the end wing wall is deposited in a side to join a bridge deck and the abutment with a rebar, such that moment occurring from a major angle part is minimized to realize economic construction, and a girder-rahmen composite bridge thereof. According to the present invention, the girder-rahmen composite bridge comprises: a pair of abutments disposed on both ends of a bridge; a plurality of PC girder rows including a girder body introducing tension to a lower part and an end wing wall extended from the end part of the girder body to be mounted on the upper part of the abutment; joining concrete to integrated the top of the abutment and the end wing wall by concrete deposited in a site; and a bridge deck installed on the upper part of the PC girder. First and second tendons are arranged on the inner lower side of the girder body along a curved line to anchor both end parts on both sides of the girder body. A preloading tendon is removably disposed on the upper part of the girder body in the longitudinal direction of the girder body, wherein both ends of the preloading tendon are anchored on the end part of the PC girder to temporarily offset a part of upward moment generated by tension of the first tendon, and a middle part of the preloading tendon is supported to the top of a preloading pressing device disposed on the central upper part of the girder body.
본 발명은 PC 거더의 단부날개벽이 거더 본체의 단부에 연장 형성되어 교대 상부에 단순 접합되되 교대 상단과 단부날개벽을 일체화하는 접합콘크리트가 현장 타설되어 교량 상판과 교대를 강접합하여 라멘 구조를 형성하므로, 우각부에 발생하는 모멘트를 최소화하여 경제적인 시공이 가능한 거더 합성형 라멘교의 시공 방법 및 거더 합성형 라멘교에 대한 것이다. 본 발명 거더 합성형 라멘교의 시공 방법은 교량의 양단에 각각 구비되는 한 쌍의 교대; 하부에 긴장력이 도입되는 거더 본체 및 상기 거더 본체의 단부에 연장 형성되어 상기 교대의 상부에 거치되는 단부날개벽으로 구성되는 복수 열의 PC 거더; 현장 타설되는 콘크리트에 의해 상기 교대의 상단과 단부날개벽을 일체화하는 접합콘크리트; 및 상기 PC 거더의 상부에 설치되는 교량 상판; 으로 구성되되, 상기 거더 본체의 내부 하측에는 양단부가 거더 본체의 양측에 정착되도록 제1긴장재와 제2긴장재가 곡선 배치되고, 상기 거더 본체의 상부에는 상기 제1긴장재의 긴장에 의해 발생되는 상향의 모멘트 일부를 일시적으로 상쇄하기 위해 양단이 PC 거더의 단부에 정착되고 중앙은 상기 거더 본체의 중앙 상부에 구비되는 프리로딩용 가압구의 상단에 지지되는 프리로딩 긴장재가 거더 본체의 길이 방향으로 제거 가능하게 구비되는 거더 합성형 라멘교를 시공하기 위한 것이다.
Construction method of girder composite rahmen bridge and Girder composite rahmen bridge
The present invention relates to a construction method of a girder-rahmen composite bridge, wherein a rahmen structure is formed by extending an end wing wall of a PC girder from an end part of a girder body to be simply joined to the upper part of an abutment and joining concrete for integrating the top of the abutment and the end wing wall is deposited in a side to join a bridge deck and the abutment with a rebar, such that moment occurring from a major angle part is minimized to realize economic construction, and a girder-rahmen composite bridge thereof. According to the present invention, the girder-rahmen composite bridge comprises: a pair of abutments disposed on both ends of a bridge; a plurality of PC girder rows including a girder body introducing tension to a lower part and an end wing wall extended from the end part of the girder body to be mounted on the upper part of the abutment; joining concrete to integrated the top of the abutment and the end wing wall by concrete deposited in a site; and a bridge deck installed on the upper part of the PC girder. First and second tendons are arranged on the inner lower side of the girder body along a curved line to anchor both end parts on both sides of the girder body. A preloading tendon is removably disposed on the upper part of the girder body in the longitudinal direction of the girder body, wherein both ends of the preloading tendon are anchored on the end part of the PC girder to temporarily offset a part of upward moment generated by tension of the first tendon, and a middle part of the preloading tendon is supported to the top of a preloading pressing device disposed on the central upper part of the girder body.
본 발명은 PC 거더의 단부날개벽이 거더 본체의 단부에 연장 형성되어 교대 상부에 단순 접합되되 교대 상단과 단부날개벽을 일체화하는 접합콘크리트가 현장 타설되어 교량 상판과 교대를 강접합하여 라멘 구조를 형성하므로, 우각부에 발생하는 모멘트를 최소화하여 경제적인 시공이 가능한 거더 합성형 라멘교의 시공 방법 및 거더 합성형 라멘교에 대한 것이다. 본 발명 거더 합성형 라멘교의 시공 방법은 교량의 양단에 각각 구비되는 한 쌍의 교대; 하부에 긴장력이 도입되는 거더 본체 및 상기 거더 본체의 단부에 연장 형성되어 상기 교대의 상부에 거치되는 단부날개벽으로 구성되는 복수 열의 PC 거더; 현장 타설되는 콘크리트에 의해 상기 교대의 상단과 단부날개벽을 일체화하는 접합콘크리트; 및 상기 PC 거더의 상부에 설치되는 교량 상판; 으로 구성되되, 상기 거더 본체의 내부 하측에는 양단부가 거더 본체의 양측에 정착되도록 제1긴장재와 제2긴장재가 곡선 배치되고, 상기 거더 본체의 상부에는 상기 제1긴장재의 긴장에 의해 발생되는 상향의 모멘트 일부를 일시적으로 상쇄하기 위해 양단이 PC 거더의 단부에 정착되고 중앙은 상기 거더 본체의 중앙 상부에 구비되는 프리로딩용 가압구의 상단에 지지되는 프리로딩 긴장재가 거더 본체의 길이 방향으로 제거 가능하게 구비되는 거더 합성형 라멘교를 시공하기 위한 것이다.
Construction method of girder composite rahmen bridge and Girder composite rahmen bridge
거더 합성형 라멘교의 시공 방법 및 거더 합성형 라멘교
KIM HEE JUNG (author) / RHEE CHANG SHIN (author) / KANG DAE HUNG (author)
2019-03-15
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Composite rahmen bridge construction method thereof and steel girder for composite rahmen bridge
European Patent Office | 2021
|Composite rahmen bridge construction method thereof and steel girder for composite rahmen bridge
European Patent Office | 2021
Composite rahmen bridge steel girder for that and construction method of composite rahmen bridge
European Patent Office | 2019
|PSC GIRDER RAHMEN BRIDGE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2016
|STEEL COMPOSITE GIRDER FOR RAHMEN BRIDGE AND ITS MANUFACTURING METHOD
European Patent Office | 2023
|