Construction Method of Temporary Bridges Using Precast Concrete Deck
The present invention relates to a construction method for a temporary bridge using a precast concrete deck, and more particularly, to a construction method for a temporary bridge which installs a steel pile (10), installs a steel pile cap (11) on an upper portion of the steel pile (10), installs a steel coping unit (20) on an upper end of the steel pile cap (11), assembles and installs a steel girder (30) on an upper end of the steel coping unit (20), and then installs a precast concrete deck on an upper end of the steel girder (30), and allows precast concrete decks, which are to be installed by stages, to be conveyed by using a conveying device (40) traveling on an upper surface of the steel girder (30) and a rail member (50) provided on an upper surface of the installed precast concrete deck, thereby facilitating the conveyance thereof onto the girder and implementing a working environment having no limitations on space and place due to the installation of the conveying device (40).
본 발명은 프리캐스트 콘크리트 바닥판(Precast Concrete Deck)을 이용한 가설(假設)교량 시공방법에 관한 것으로서 더욱 구체적으로 강재파일(10)을 설치하고, 강재파일(10) 상부에 강재파일캡(11)을 설치하고, 상기 강재파일캡(11) 상단에 강재코핑(20)부를 설치하고, 상기 강재코핑(20) 상단에 강재거더(30)를 조립 설치한 후, 강재거더(30) 상단에 프리캐스트 콘크리트 바닥판을 설치하되, 강재거더(30) 상면을 주행하는 이송장치(40) 및 설치된 프리캐스트 콘크리트 바닥판 상면에 구비된 레일부재(50)로 단계적으로 설치될 프리캐스트 콘크리트 바닥판을 이송하도록하여 거더상으로의 이송을 간편하게하고, 상기 이송장치(40)의 설치에 따른 공간 및 장소적 제한에 구애받지 않는 작업환경을 구현할 수 있도록 된 가설교량 시공 방법에 관한 것이다.
Construction Method of Temporary Bridges Using Precast Concrete Deck
The present invention relates to a construction method for a temporary bridge using a precast concrete deck, and more particularly, to a construction method for a temporary bridge which installs a steel pile (10), installs a steel pile cap (11) on an upper portion of the steel pile (10), installs a steel coping unit (20) on an upper end of the steel pile cap (11), assembles and installs a steel girder (30) on an upper end of the steel coping unit (20), and then installs a precast concrete deck on an upper end of the steel girder (30), and allows precast concrete decks, which are to be installed by stages, to be conveyed by using a conveying device (40) traveling on an upper surface of the steel girder (30) and a rail member (50) provided on an upper surface of the installed precast concrete deck, thereby facilitating the conveyance thereof onto the girder and implementing a working environment having no limitations on space and place due to the installation of the conveying device (40).
본 발명은 프리캐스트 콘크리트 바닥판(Precast Concrete Deck)을 이용한 가설(假設)교량 시공방법에 관한 것으로서 더욱 구체적으로 강재파일(10)을 설치하고, 강재파일(10) 상부에 강재파일캡(11)을 설치하고, 상기 강재파일캡(11) 상단에 강재코핑(20)부를 설치하고, 상기 강재코핑(20) 상단에 강재거더(30)를 조립 설치한 후, 강재거더(30) 상단에 프리캐스트 콘크리트 바닥판을 설치하되, 강재거더(30) 상면을 주행하는 이송장치(40) 및 설치된 프리캐스트 콘크리트 바닥판 상면에 구비된 레일부재(50)로 단계적으로 설치될 프리캐스트 콘크리트 바닥판을 이송하도록하여 거더상으로의 이송을 간편하게하고, 상기 이송장치(40)의 설치에 따른 공간 및 장소적 제한에 구애받지 않는 작업환경을 구현할 수 있도록 된 가설교량 시공 방법에 관한 것이다.
Construction Method of Temporary Bridges Using Precast Concrete Deck
프리캐스트 콘크리트 바닥판을 이용한 가설교량 시공방법
KIM HEE JUNG (author)
2019-09-30
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Precast deck systems for steel-concrete composite bridges
Online Contents | 2007
|Bridges and Transportation Precast Prestressed Concrete Deck Bulb Tee Bridges
British Library Conference Proceedings | 2010
|Precast Concrete Composite Deck Components for Rehabilitation of Bridges
British Library Conference Proceedings | 1997
|Precast Concrete Integrated Deck System for Highway and Railway Bridges
British Library Conference Proceedings | 1999
|