Construction method for the rahmen bridge using facing of geosynthetics reinforced soil retaining wall
The present invention provides a construction method for a Rahmen bridge using a front wall of a reinforced soil retaining wall, which comprises the following steps of: constructing a base portion in a lower portion of a front side of each of reinforced soil planned on both sides; constructing a plan reinforced soil body on a rear surface of the constructed base portion; forming an abutment at an upper side of the base portion; and constructing a bridge in the shape of connecting upper portions of the abutment at both sides. The step of forming the abutment more comprises the following steps of: installing a base rebar to form an upper abutment of the plan reinforced soil body and the base portion, and connecting the plan reinforced soil body to the installed base rebar using a connection rebar; and installing an L-shaped upper bending beam portion at an upper side of the abutment.
본 발명은 양측으로 계획된 보강토체 각각의 전방측 하부에 기초부를 구축하는 단계; 상기 구축된 기초부 배면에 계획보강토체를 구축하는 단계; 상기 기초부 상측으로 교대를 형성하는 단계; 및 상기 양측 교대 상부를 연결하는 형태로 교량을 구축하는 단계;를 포함하며, 상기 교대를 형성하는 단계는, 상기 구축된 계획보강토체와 상기 기초부 상측 교대를 형성하기 위하여 기초철근을 설치하고 상기 설치된 기초철근을 연결철근을 이용 상기 계획보강토체와 연결되도록 하는 단계; 및 상기 교대 상측에 "ㄱ"자형 상부절곡빔부를 설치하는 단계;를 더 포함하는 보강토 옹벽의 전면벽체를 활용한 라멘교 구축 방법을 제공한다.
Construction method for the rahmen bridge using facing of geosynthetics reinforced soil retaining wall
The present invention provides a construction method for a Rahmen bridge using a front wall of a reinforced soil retaining wall, which comprises the following steps of: constructing a base portion in a lower portion of a front side of each of reinforced soil planned on both sides; constructing a plan reinforced soil body on a rear surface of the constructed base portion; forming an abutment at an upper side of the base portion; and constructing a bridge in the shape of connecting upper portions of the abutment at both sides. The step of forming the abutment more comprises the following steps of: installing a base rebar to form an upper abutment of the plan reinforced soil body and the base portion, and connecting the plan reinforced soil body to the installed base rebar using a connection rebar; and installing an L-shaped upper bending beam portion at an upper side of the abutment.
본 발명은 양측으로 계획된 보강토체 각각의 전방측 하부에 기초부를 구축하는 단계; 상기 구축된 기초부 배면에 계획보강토체를 구축하는 단계; 상기 기초부 상측으로 교대를 형성하는 단계; 및 상기 양측 교대 상부를 연결하는 형태로 교량을 구축하는 단계;를 포함하며, 상기 교대를 형성하는 단계는, 상기 구축된 계획보강토체와 상기 기초부 상측 교대를 형성하기 위하여 기초철근을 설치하고 상기 설치된 기초철근을 연결철근을 이용 상기 계획보강토체와 연결되도록 하는 단계; 및 상기 교대 상측에 "ㄱ"자형 상부절곡빔부를 설치하는 단계;를 더 포함하는 보강토 옹벽의 전면벽체를 활용한 라멘교 구축 방법을 제공한다.
Construction method for the rahmen bridge using facing of geosynthetics reinforced soil retaining wall
보강토 옹벽의 전면벽체를 활용한 라멘교 구축 방법
KANG DAE HWA (author)
2019-11-04
Patent
Electronic Resource
Korean