Reinforcing Structure for Preventing Scour and Construction Method thereof
The present invention relates to an anti-scouring reinforcement structure and a construction method thereof. To this end, according to the structure for reinforcing a scoured surface generated on the side of a road surface, a plurality of screw piles are buried at regular intervals in a longitudinal direction of a road surface in the ground of the side of a scoured surface, an H-beam type post is vertically coupled to an upper end of the screw piles, and a plurality of reinforcing blocks having the length corresponding to the intervals are stacked and provided between the adjacent H-beam type posts. A filler is provided in a first space part between the reinforcing blocks and the scouring surface, an L-shaped finishing block is provided on an upper part of the reinforcing blocks located at the uppermost end, and a cast-in-situ concrete is poured to correspond to the height of an existing road surface after a connection ironwork is fastened to a second space part between the L-shaped finishing block and the scoured surface. Accordingly, an in-situ process such as a cast process and concrete pouring is minimized to shorten a construction period so as to be economical, and the reinforcing blocks can be reversely separated from the post if necessary such that maintenance is easy.
본 발명은 세굴 방지용 보강 구조체 및 그 시공방법에 관한 것이다. 이를 위하여 본 발명의 세굴 방지용 보강 구조체 및 그 시공방법은, 노면의 측부에 발생된 세굴면을 보강하기 위한 구조체에 있어서, 상기 세굴면의 측부 지반에는 노면의 길이방향을 따라 일정 간격으로 복수의 스크류 파일이 매립되고, 상기 스크류 파일의 상단에는 H빔형 지주가 직립되게 결합되며, 인접된 H빔형 지주 사이에는 그 간격에 대응되는 길이를 지니는 복수의 보강블럭이 적층 구비되고, 상기 보강블럭과 세굴면 사이의 제1 공간부에 채움재를 구비하며, 최상단에 위치하는 보강블럭의 상부에는 L자형 마감블럭이 구비되고, 상기 L자형 마감블럭과 세굴면 사이의 제2 공간부에 연결철물이 결속된 후 기존 노면의 높이에 대응되도록 현장타설 콘크리트가 타설된다. 이로써, 거푸집 공정과 콘크리트 타설과 같은 현장 공정을 최소화하여 공기가 단축되어 경제적이며, 필요시에는 역으로 보강블럭을 지주로부터 분리할 수 있으므로 유지 보수가 용이한 이점이 있다.
Reinforcing Structure for Preventing Scour and Construction Method thereof
The present invention relates to an anti-scouring reinforcement structure and a construction method thereof. To this end, according to the structure for reinforcing a scoured surface generated on the side of a road surface, a plurality of screw piles are buried at regular intervals in a longitudinal direction of a road surface in the ground of the side of a scoured surface, an H-beam type post is vertically coupled to an upper end of the screw piles, and a plurality of reinforcing blocks having the length corresponding to the intervals are stacked and provided between the adjacent H-beam type posts. A filler is provided in a first space part between the reinforcing blocks and the scouring surface, an L-shaped finishing block is provided on an upper part of the reinforcing blocks located at the uppermost end, and a cast-in-situ concrete is poured to correspond to the height of an existing road surface after a connection ironwork is fastened to a second space part between the L-shaped finishing block and the scoured surface. Accordingly, an in-situ process such as a cast process and concrete pouring is minimized to shorten a construction period so as to be economical, and the reinforcing blocks can be reversely separated from the post if necessary such that maintenance is easy.
본 발명은 세굴 방지용 보강 구조체 및 그 시공방법에 관한 것이다. 이를 위하여 본 발명의 세굴 방지용 보강 구조체 및 그 시공방법은, 노면의 측부에 발생된 세굴면을 보강하기 위한 구조체에 있어서, 상기 세굴면의 측부 지반에는 노면의 길이방향을 따라 일정 간격으로 복수의 스크류 파일이 매립되고, 상기 스크류 파일의 상단에는 H빔형 지주가 직립되게 결합되며, 인접된 H빔형 지주 사이에는 그 간격에 대응되는 길이를 지니는 복수의 보강블럭이 적층 구비되고, 상기 보강블럭과 세굴면 사이의 제1 공간부에 채움재를 구비하며, 최상단에 위치하는 보강블럭의 상부에는 L자형 마감블럭이 구비되고, 상기 L자형 마감블럭과 세굴면 사이의 제2 공간부에 연결철물이 결속된 후 기존 노면의 높이에 대응되도록 현장타설 콘크리트가 타설된다. 이로써, 거푸집 공정과 콘크리트 타설과 같은 현장 공정을 최소화하여 공기가 단축되어 경제적이며, 필요시에는 역으로 보강블럭을 지주로부터 분리할 수 있으므로 유지 보수가 용이한 이점이 있다.
Reinforcing Structure for Preventing Scour and Construction Method thereof
세굴 방지용 보강 구조체 및 그 시공방법
KIM JUNG CHER (author)
2020-06-18
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|SCOUR SUPPRESSION UNIT, SCOUR SUPPRESSION STRUCTURE, AND SCOUR SUPPRESSION CONSTRUCTION METHOD
European Patent Office | 2023
|Slope surface dissected valley greening scour preventing system and construction method thereof
European Patent Office | 2020
|WEDGE BASE FOR PREVENTING SCOUR AND REINFORCING BASE, AND METHOD FOR CONSTRUCTING THE SAME
European Patent Office | 2016
|WEDGE BASE FOR PREVENTING SCOUR AND REINFORCING BASE AND METHOD FOR CONSTRUCTING THE SAME
European Patent Office | 2016