A platform for research: civil engineering, architecture and urbanism
The present invention relates to an installation method for a retaining wall structure for construction of water supply and drainage, which comprises the steps of: preparing the retaining wall structure; painting the retaining wall structure through a processing means; drying the retaining wall structure which is painted; storing the completely dried retaining wall structure; and when the construction position of the construction of water supply and drainage is selected, installing the retaining wall structure at the selected construction position. According to the present invention, the retaining wall structure comprises: a plurality of guide pipes (100″) in which, on an upper side, insertion pipe guide penetrating holes (101″) are formed in a deep part in a vertical direction, and which are installed adjacent to a side surface of an excavation unit (2″) at regular distances; a plurality of insertion pipes (200″) rotatably inserted into the insertion pipe guide penetrating holes (101″) and then, inserted into the soil body on a lower side; upper earth plates (110″) coupled to a rear surface of the plurality of guide pipes (100″); and lower earth plates (210″) which slide downwards along the guide grooves (103″) formed between the guide pipes (100″) and the upper earth plates (110″) to be installed between the plurality of insertion pipes (200″). Accordingly, the present invention has effects to make the construction easy and safe, make it easy to reuse materials, especially maximize the durability of materials and minimize external damage to the materials to maximize the period for using the materials, thereby efficiently using the materials.
본 발명은, 흙막이 구조물을 준비하는 단계; 가공수단를 통해 상기 흙막이 구조물에 대한 도장 가공이 수행되는 단계; 도장 가공이 수행된 흙막이 구조물이 건조되는 단계; 건조가 완료된 흙막이 구조물이 보관되는 단계; 및 상하 수도관 공사의 공사 위치가 선정되면 선정된 공사 위치에 상기 흙막이 구조물을 설치하는 단계를 포함하며, 상기 흙막이 구조물은, 심부에 상하방향으로 근입 파이프 가이드용 관통공(101")이 형성되고, 상기 굴토부(2")의 측면에 인접하여 소정간격을 두고 설치되는 복수의 가이드 파이프(100); 상기 근입 파이프 가이드용 관통공(101")에 회전가능하도록 삽입되어, 하측 토체에 근입되도록 설치된 복수의 근입 파이프(200"); 상기 복수의 가이드 파이프(110“)의 배면에 결합한 상부 토류판(110"); 상기 가이드 파이프(110“)와 상기 상부 토류판(110) 사이에 형성된 가이드 홈(103")을 따라 하측으로 슬라이드 구동하여, 상기 복수의 근입 파이프(200") 사이에 설치되는 하부 토류판(210")을 포함하는 상하수도용 흙막이 구조물 설치방법을 제공한다. 따라서, 시공이 용이하고 안전하며 자재 재활용을 용이하게 하되, 특히 자재 자체의 내구성과 외관적 손상을 최소화시켜 자재의 사용 가능 기간을 극대화시켜 효율적으로 사용할 수 있는 상하수도 공사용 흙막이 구조물 설치방법을 제공할 수 있는 효과가 있다.
The present invention relates to an installation method for a retaining wall structure for construction of water supply and drainage, which comprises the steps of: preparing the retaining wall structure; painting the retaining wall structure through a processing means; drying the retaining wall structure which is painted; storing the completely dried retaining wall structure; and when the construction position of the construction of water supply and drainage is selected, installing the retaining wall structure at the selected construction position. According to the present invention, the retaining wall structure comprises: a plurality of guide pipes (100″) in which, on an upper side, insertion pipe guide penetrating holes (101″) are formed in a deep part in a vertical direction, and which are installed adjacent to a side surface of an excavation unit (2″) at regular distances; a plurality of insertion pipes (200″) rotatably inserted into the insertion pipe guide penetrating holes (101″) and then, inserted into the soil body on a lower side; upper earth plates (110″) coupled to a rear surface of the plurality of guide pipes (100″); and lower earth plates (210″) which slide downwards along the guide grooves (103″) formed between the guide pipes (100″) and the upper earth plates (110″) to be installed between the plurality of insertion pipes (200″). Accordingly, the present invention has effects to make the construction easy and safe, make it easy to reuse materials, especially maximize the durability of materials and minimize external damage to the materials to maximize the period for using the materials, thereby efficiently using the materials.
본 발명은, 흙막이 구조물을 준비하는 단계; 가공수단를 통해 상기 흙막이 구조물에 대한 도장 가공이 수행되는 단계; 도장 가공이 수행된 흙막이 구조물이 건조되는 단계; 건조가 완료된 흙막이 구조물이 보관되는 단계; 및 상하 수도관 공사의 공사 위치가 선정되면 선정된 공사 위치에 상기 흙막이 구조물을 설치하는 단계를 포함하며, 상기 흙막이 구조물은, 심부에 상하방향으로 근입 파이프 가이드용 관통공(101")이 형성되고, 상기 굴토부(2")의 측면에 인접하여 소정간격을 두고 설치되는 복수의 가이드 파이프(100); 상기 근입 파이프 가이드용 관통공(101")에 회전가능하도록 삽입되어, 하측 토체에 근입되도록 설치된 복수의 근입 파이프(200"); 상기 복수의 가이드 파이프(110“)의 배면에 결합한 상부 토류판(110"); 상기 가이드 파이프(110“)와 상기 상부 토류판(110) 사이에 형성된 가이드 홈(103")을 따라 하측으로 슬라이드 구동하여, 상기 복수의 근입 파이프(200") 사이에 설치되는 하부 토류판(210")을 포함하는 상하수도용 흙막이 구조물 설치방법을 제공한다. 따라서, 시공이 용이하고 안전하며 자재 재활용을 용이하게 하되, 특히 자재 자체의 내구성과 외관적 손상을 최소화시켜 자재의 사용 가능 기간을 극대화시켜 효율적으로 사용할 수 있는 상하수도 공사용 흙막이 구조물 설치방법을 제공할 수 있는 효과가 있다.
TEMPORARY RETAINING WALL STRUCTURE
상하수도 공사용 흙막이 구조물 설치방법
KIM GWANG SU (author)
2020-08-26
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen