A platform for research: civil engineering, architecture and urbanism
Bridge raising method that can absorb shock
The present invention relates to a bridge lifting method capable of shock absorption, which includes the following steps of: a) installing one or more supports (50) on an upper portion of a lower structure (20) of a bridge; b) installing jacking devices (40) on upper portions of the one or more supports (50), respectively; c) installing a shock absorption lifting device (100) between the jacking devices (40) and an upper structure of the bridge; d) lifting the upper structure (10) of the bridge by operating the jacking devices (40); e) removing an existing bridge support (30) and installing a new bridge support; and f) lowering the upper structure (10) of the bridge. Therefore, the bridge lifting method capable of shock absorption can prevent collapses of the lifting device and the upper structure of the bridge.
본 발명은, 교량 인상 공법에 있어서, a) 교량의 하부구조물(20)의 상부에 1개 이상의 서포트(50)를 설치하는 단계; b) 상기 1개 이상의 서포트(50)의 상부에 각각 재킹장치(40)를 설치하는 단계; c) 상기 재킹장치(40)와 교량 상부구조물 사이에 충격흡수인상장치(100)를 설치하는 단계; d) 상기 재킹장치(40)를 작동시켜 교량의 상부구조물(10)을 인상하는 단계; e) 기존의 교량받침(10)을 제거하고 새로운 교량받침을 설치하는 단계; f) 교량의 상부구조물(10)을 인하하는 단계를 포함하는 충격흡수가 가능한 교량 인상 공법에 관한 것이다.
Bridge raising method that can absorb shock
The present invention relates to a bridge lifting method capable of shock absorption, which includes the following steps of: a) installing one or more supports (50) on an upper portion of a lower structure (20) of a bridge; b) installing jacking devices (40) on upper portions of the one or more supports (50), respectively; c) installing a shock absorption lifting device (100) between the jacking devices (40) and an upper structure of the bridge; d) lifting the upper structure (10) of the bridge by operating the jacking devices (40); e) removing an existing bridge support (30) and installing a new bridge support; and f) lowering the upper structure (10) of the bridge. Therefore, the bridge lifting method capable of shock absorption can prevent collapses of the lifting device and the upper structure of the bridge.
본 발명은, 교량 인상 공법에 있어서, a) 교량의 하부구조물(20)의 상부에 1개 이상의 서포트(50)를 설치하는 단계; b) 상기 1개 이상의 서포트(50)의 상부에 각각 재킹장치(40)를 설치하는 단계; c) 상기 재킹장치(40)와 교량 상부구조물 사이에 충격흡수인상장치(100)를 설치하는 단계; d) 상기 재킹장치(40)를 작동시켜 교량의 상부구조물(10)을 인상하는 단계; e) 기존의 교량받침(10)을 제거하고 새로운 교량받침을 설치하는 단계; f) 교량의 상부구조물(10)을 인하하는 단계를 포함하는 충격흡수가 가능한 교량 인상 공법에 관한 것이다.
Bridge raising method that can absorb shock
충격흡수가 가능한 교량 인상 공법
NO YUN SEONG (author) / KIM JI HYE (author)
2020-11-27
Patent
Electronic Resource
Korean
British Library Online Contents | 2006
|CONCRETE COATINGS AND COMPOSITIONS THAT ABSORB CARBON DIOXIDE
European Patent Office | 2016
|