A platform for research: civil engineering, architecture and urbanism
Slope reinforcement construction method using vegetation soil and perforated metal plate and slope reinforcement construction
Provided are a slope reinforcement construction method and a slope reinforcement structure. The method of the present invention comprises the steps of: preparing a perforated metal plate in which a plurality of through holes are formed through a body having a vegetative soil bag filled with soil inside a sack having seeds, and a bending portion bent between an upper plate and a lower plate; preparing a soil bag structure by assembling the perforated metal plate and soil bag so that the outer surface of the vegetation soil bag is in contact with the bending portion and the upper and lower plates; arranging the soil bag structure on the floor so that the bending portion faces outward, and backfilling the soil toward the back side of the soil bag structure to form a fill layer; forming a slope reinforcement portion by stacking the soil bag structures in a height direction while fixing the soil bag structures stacked up and down by a binding plate disposed between the soil bag structure and another soil bag structure mounted thereon; and forming an embankment unit disposing a drainage material extending from the binding plate interposed between each of the soil structures in an embankment layer, and backfilling the soil toward the back side of the soil structure to cover the drainage material to form a fill part interposing the drainage material between the embankment layers. The bending portion of the perforated metal plate having a plurality of through holes formed on the front surface of the slope reinforcement portion is exposed to the outside. The germinated seeds are vegetated to be exposed to the outside through the through hole of the bending portion. The moisture in the embankment portion is discharged to the front surface of the slope reinforcement portion through the drainage material.
사면보강 시공방법 및 사면보강 구조물을 제공한다. 본 발명은 씨앗을 갖는 포대의 내부에 토양이 채워진 식생토낭과, 상판과 하판과의 사이에 절곡된 밴딩부를 갖는 몸체에 복수개의 관통공을 관통형성한 타공 금속판을 각각 준비하는 단계 ; 상기 식생토낭의 외부면이 상기 밴딩부과 상,하판에 접해지도록 상기 타공 금속판과 토낭을 합체하여 토낭 구조체를 준비하는 단계 ; 상기 밴딩부가 외측을 향하도록 토낭 구조체를 바닥면에 배치하고, 상기 토낭 구조체의 배면 측으로 토양을 뒷채움하여 성토층을 형성하는 단계 ; 상기 토낭 구조체와 이에 올려지는 다른 토낭 구조체와의 사이에 배치되는 결속판에 의해서 상하적층되는 토낭 구조체들을 고정하면서 상기 토낭 구조체를 높이방향으로 적층하여 사면 보강부를 형성하는 단계 ; 상기 토낭 구조체들 사이마다 개재되는 결속판으로부터 연장되는 배수재를 성토층에 배치하고, 상기 배수재를 덮도록 상기 토낭 구조체의 배면 측으로 토양을 뒷채움하여 성토층들사이에 배수재를 개재하는 성토부를 형성하는 단계; 를 포함하여, 상기 사면 보강부의 전면으로 복수개의 관통공을 형성한 타공 금속판의 밴딩부가 외부노출되고, 발아된 씨앗은 밴딩부의 관통공을 통하여 외부로 노출되도록 식생되고, 상기 성토부에 함수된 수분은 상기 배수재를 통하여 상기 사면 보강부의 전면으로 배출된다.
Slope reinforcement construction method using vegetation soil and perforated metal plate and slope reinforcement construction
Provided are a slope reinforcement construction method and a slope reinforcement structure. The method of the present invention comprises the steps of: preparing a perforated metal plate in which a plurality of through holes are formed through a body having a vegetative soil bag filled with soil inside a sack having seeds, and a bending portion bent between an upper plate and a lower plate; preparing a soil bag structure by assembling the perforated metal plate and soil bag so that the outer surface of the vegetation soil bag is in contact with the bending portion and the upper and lower plates; arranging the soil bag structure on the floor so that the bending portion faces outward, and backfilling the soil toward the back side of the soil bag structure to form a fill layer; forming a slope reinforcement portion by stacking the soil bag structures in a height direction while fixing the soil bag structures stacked up and down by a binding plate disposed between the soil bag structure and another soil bag structure mounted thereon; and forming an embankment unit disposing a drainage material extending from the binding plate interposed between each of the soil structures in an embankment layer, and backfilling the soil toward the back side of the soil structure to cover the drainage material to form a fill part interposing the drainage material between the embankment layers. The bending portion of the perforated metal plate having a plurality of through holes formed on the front surface of the slope reinforcement portion is exposed to the outside. The germinated seeds are vegetated to be exposed to the outside through the through hole of the bending portion. The moisture in the embankment portion is discharged to the front surface of the slope reinforcement portion through the drainage material.
사면보강 시공방법 및 사면보강 구조물을 제공한다. 본 발명은 씨앗을 갖는 포대의 내부에 토양이 채워진 식생토낭과, 상판과 하판과의 사이에 절곡된 밴딩부를 갖는 몸체에 복수개의 관통공을 관통형성한 타공 금속판을 각각 준비하는 단계 ; 상기 식생토낭의 외부면이 상기 밴딩부과 상,하판에 접해지도록 상기 타공 금속판과 토낭을 합체하여 토낭 구조체를 준비하는 단계 ; 상기 밴딩부가 외측을 향하도록 토낭 구조체를 바닥면에 배치하고, 상기 토낭 구조체의 배면 측으로 토양을 뒷채움하여 성토층을 형성하는 단계 ; 상기 토낭 구조체와 이에 올려지는 다른 토낭 구조체와의 사이에 배치되는 결속판에 의해서 상하적층되는 토낭 구조체들을 고정하면서 상기 토낭 구조체를 높이방향으로 적층하여 사면 보강부를 형성하는 단계 ; 상기 토낭 구조체들 사이마다 개재되는 결속판으로부터 연장되는 배수재를 성토층에 배치하고, 상기 배수재를 덮도록 상기 토낭 구조체의 배면 측으로 토양을 뒷채움하여 성토층들사이에 배수재를 개재하는 성토부를 형성하는 단계; 를 포함하여, 상기 사면 보강부의 전면으로 복수개의 관통공을 형성한 타공 금속판의 밴딩부가 외부노출되고, 발아된 씨앗은 밴딩부의 관통공을 통하여 외부로 노출되도록 식생되고, 상기 성토부에 함수된 수분은 상기 배수재를 통하여 상기 사면 보강부의 전면으로 배출된다.
Slope reinforcement construction method using vegetation soil and perforated metal plate and slope reinforcement construction
식생토낭과 타공 금속판을 이용한 사면보강 시공방법 및 사면 보강 구조물
SON HU RAK (author) / SON IN LAK (author)
2021-03-02
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Slope reinforcement construction method using vegetation soil and slope reinforcement construction
European Patent Office | 2021
|European Patent Office | 2019
|Slope Reinforcement Concrete Anchor Block and Slope Reinforcement Construction Method Using Same
European Patent Office | 2019
|